Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **

Slides:



Advertisements
Similar presentations
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
Advertisements

HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Peter Chochula ALICE DCS Workshop, October 6,2005 PVSSII Alert Handling.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
Yu. Guz 16/04/20081 Radioactive source status R. Dzhelyadin, Yu. Guz IHEP, Protvino.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **

Yu. Guz 14/03/ xCAL HV system hardware (x  {E,H}) Each xCAL PMT installed on the detector wall is equipped with an individual Cockcroft-Walton (CW) HV generator. Each requires DC power (+6V, -6V and +90V), and a control voltage determining the HV value. Total of 40 control and distribution boxes are installed at the chariots and at the CALO platform: 32 ECAL, 8 HCAL These control boxes provide: DC power and control voltages for the xCAL CW generators; DC power and control voltages for LED drivers (NB decoupled from common ground) bias voltage for PIN photodiodes and DC power for their amplifiers The output voltages are controlled: control voltages for CWs – SPECS DCU voltage at +6V and -6V CW power lines – SPECS DCU control voltage for LEDs – dedicated ADC LV&MV in CW control CW power LED/PIN power, LED control SPECS HCAL ECAL Inputs: +6V, +7V, -7V, 15V : DCS LV, from MARATONs (platform) +90V, -25V : DCS MV, from Agilent PS (D3) SPECS communication input Outputs: 8 power lines for xCAL CW (up to 40 CWs on each line) DAC control of up to 200 xCAL CW bases 8 outputs with LED/PIN power + 2 LED control each SPECS output Output protection on the CW DC power outputs: +6V -6V : fuses +90V : relays

48 LVDS From LEDTSB Yu. Guz 14/03/ PS / SPD HV system hardware The PS/SPD MAPMT modules use HV produced by CW generators installed at the CALO platform. The HV system is arranged in two crates (one per side, in racks L3B03 and L3B13). Each crate contains: 1 DAC module, 11 CW modules (5 PS, 5 SPD, 1 spare); LED control board. Each CW module contains 10 CW generator mezzanines and serves 10 MAPMTs. Inputs: +7V, -7V : DCS LV, from MARATONs (platform) +150V : DCS MV, from Agilent PS (D3) SPECS communication Outputs: 110 HV outputs for MAPMTs 10 DAC outputs for LED control DAC module CW modules LED control

Yu. Guz 14/03/ Rack D3B04 in D3 4 Agilent power supplies for HCAL, ECAL, PRSA and PRSC (+ one power supply +5V for the CALO Status Bit board, not discussed here). MV The MV necessary for the CALO HV is provided by Agilent power supplies (PS1—PS4): HCAL, ECAL: two N6701 power frames, each with 2 N6776 (100V ) and 2 N6734B (30V) units, produce +90 V for CW bases (1 per side) and -25 V for PIN photodiode bias (1 per side) PS/SPD : two 1-channel N5750A power supplies producing +150 V for CWs (1 per side). Ch 1Ch 2Ch 3Ch 4 PS1hcagil01+90V HCAL A-25V HCAL A+90V HCAL C-25V HCAL C PS2ecagil01+90V ECAL A-25V ECAL A+90V ECAL C-25V ECAL C PS3psagil01+150V PRS A PS4psagil02+150V PRS C Served by the CADCSMV project running on CADCS01W. The PVSS control is based on standard MARATON software; the Agilent commands and readings are relayed into MARATON datapoints via DIM. Each Agilent box is served by an individual communication executable installed as a service on CADCS01W. One service per PS HCAL PRS C PRS A ECAL The LV control: see Patrick’s slides

Yu. Guz 14/03/ MV Few things to remember: switch MV ON/OFF only at the HV OFF state, for the sake of safety; the MV is ramped up rather slowly, ~3 min for HCAL and up to 5 min for ECAL and PRS. During the ramp, the Agilent DIM applications are not responding and FSM state does not change. Be patient. Only larger time interval may indicate problems. the protection state of a power supply channel (overcurrent, overvoltage etc) leads to the FSM ERROR state. The RECOVER FSM command or OFF button of the device panel switches off this particular channel and resets its protection (no need any more to reset the whole power supply).

Yu. Guz 14/03/ ECS HV control Control PCPVSS project PRS CPSDAQHVC01WPRSHVC1 PRS APSDAQHVA01WPRSHVA1 ECAL CECHVC01WHCHVC1 ECAL AECHVA01WHCHVA1 HCAL C HCDAQHVC01W ECHVC1 HCAL AHCDAQHVA01WECHVA1 Six separate PVSS projects on six control PCs. They are included into the LHCb FSM hierarchy, so that the HVs are controlled centrally. On top of it, many tools are available for piquet / expert operations: manipulations with recipes switching ON/OFF/masking individual channels, modification of their parameters modify DAC box parameters, exclude or include it into the FSM hierarchy Three main FSM states are used: OFF, STANDBY1, READY. Corresponding FSM commands are Go_OFF, Go_STANDBY1 and Go_READY.

Yu. Guz 14/03/ ECS HV control All the six projects have similar structure. The FSM / central operation is based on a permanently running worker script (“monitoring”) which: at a period of ~ 20 sec, reads out all the DAC values, voltages measured at the LV DC power lines, status of the relays at the MV lines; in case of unexpected readings, it produces alarms at the alarm screen or device ERROR state upon arrival of a FSM command, it ramps the device to the desired state restart it Control manager running the monitoring script The monitoring script sends a short report to the log screen after every readout cycle. Absence of such reports mean that the monitoring task is stuck. This typically happens at a project restart at LV not in READY state. In this case, the corresponding PVSS manager is to be restarted. In every case of strange behavior of a CALO HV project, it can be useful first to check the status of its monitoring manager, and restart it if needed

Yu. Guz 14/03/ ECS HV control: xCAL U MV, I MV current recipe name generate HV for given gain get HV settings from CaloDb save as a recipe The project panel. A lot of piquet / expert functionality. Useful for piquet: MV voltage and current display preparation of HV:  constant PMT gain  custom HVs from an ascii file  custom HVs from the calo database manipulation with recipes: displays current recipe and full list of existing recipes; allows saving current datapoint values into a recipe search connectivity NB Channel numbers start from 0 in the database, but from 1 in the DAC box panels! Shown is channel 95 of box 24.

Yu. Guz 14/03/ ECS HV control: xCAL Voltages at CW power lines manual control section First enable it! NB this pauses the “monitoring”! It resumes only on closing the panel status of MV relays DAC box common settings: HV ramp time; MV relay reaction time individual channel operation panel. One can set the STANDBY and PHYSICS HV, as well as switch it OFF (“mask”).

status of MV relays MV relay control Best to do at MV OFF Yu. Guz 14/03/ ECS HV control: xCAL individual channel operation panel.

Yu. Guz 14/03/ ECS HV control: xCAL The “FollowMe” panel may be useful for the system initialization (e.g. at a recovery from power cut)

Yu. Guz 14/03/ ECS HV control: PRS Very similar functionality

Yu. Guz 14/03/ ECS HV control: PRS Very similar functionality MV of each CW channel is protected with a relay. Settings of individual channels

Yu. Guz 14/03/ CALO_HV_TOP panel (CA2) Shows CALO HV status. If number of channels ON is less than nominal (sometimes happens for ECAL, because of SPECS errors), the Go_READY command should be re-sent (use DEFAULT recipe, identical to PHYSICS). Important figures are MV current consumptions. They are normally very stable(*), deviations may indicate real problems. The trends can be best displayed via lbTrending (next slide). (*) the ECAL MV current slowly decreases, because of radiation effects in the central CW bases; this is normal.

Yu. Guz 14/03/ MV currents in lbTrending Use shortcut G:\online\ecs\Shortcuts38\LHCb\LBECSINFO\LBECSINFO_UI_lbTrending.lnk MV currents are being archived; any time interval can be displayed

Yu. Guz 14/03/ Error states, alarms xCAL LV outputs for CWs Protected by fuses: 1A conventional fuses || 0.5A resettable ones. If LV values differ significantly from 6V, warning or alarm produced (visible at the shifter’s alarm screen, also with shortcut G:\online\ecs\Shortcuts38\LHCb\LBECSINFO\LBECSINFO_ UI_fwAlarmHandlingScreen.lnk ). The limits are: U < 5.3 V : WARNING (yellow). The conventional fuse is burned, the resettable one is alive (which causes certain voltage drop). The CWs remain operational, the broken fuse is to be replaced at the next occasion (expert action). U < 3.5 V : ERROR (orange). Both conventional and resettable fuses are dead, the CWs belonging to this power line are not operational (this will be visible by other means). The conventional fuse should be replaced as soon as possible. xCAL MV relays The MV output of each CW power line is protected by a relay controlled by a protection system. It opens the relay in case of overcurrent (>100 mA). An open relay means that the CWs belonging to this power line do not work. In this case an ERROR at the alarm screen is produced. Piquet action: try to close the relay using the corresponding DAC box panel. if unsuccessful: ‒ switch OFF HV then MV at this subdetector side ‒ close the relay ‒ switch ON MV then HV if unsuccessful again, call expert. An access can be needed. The FSM ERROR state can be produced because of SPECS errors. Check the LV ON state; try to switch the affected board(s) OFF and ON; restart the project and the SPECS server. If unsuccessful, one can exclude the affected DAC boxes from FSM; access may be necessary (e.g. to replace a dead DAC mezzanine).