PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.

Slides:



Advertisements
Similar presentations
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Advertisements

ESS Cryogenic System Design
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
ILC Cryogenic Systems Status and EDR Plans Tom Peterson 25 October 2007.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Overview of the ESS Linac Cryogenic Distribution System
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LCLS-II Cryogenic Distribution System CDS Surface Components PDR Jerry Makara December 16, 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Project X: Cryogenic Segmentation Issues
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ESS Target Cryogenic System European Cryogenic Days CERN
2K Cold Box Process Design
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Overarching Commissioning Plan
SNS Cryoplant Commissioning Past Experiences
CTF Users’ Perspective
ESR2 Process Cycle Design
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015

Outline Scope of work Requirements System architecture Cryoplant Distribution system components Auxiliary systems Summary 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics2

Scope of Work Design, procurement, installation, testing and commissioning of the PIP-II cryogenic system including: –Cryogenic plant (compressor system, cold boxes, controls, etc.) –Cryogenic Distribution system (distribution boxes, transfer lines, bayonet boxes, etc.) –Auxiliary systems (liquid and gas storage, purification equipment, etc.) 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics3

Requirements Flow Down PIP-II Reference Design Report Fermilab Work Smart Standards –FESHM –QA Manual Fermilab Engineering Manual Cryomodules FRS 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics4 PIP-II Cryogenic System Requirements

Key Requirements Project Key Performance Parameters and Physics Requirements shall be met Operating modes: –Linac operating in the CW mode –Linac operating in the pulsed mode –Maximum heat load –Linac maintained at 2.0 K in the standby mode –Linac maintained at 4.5 K in standby mode –Linac cool-down and warm-up Support cool-down and warm-up of the Linac in < 20 days 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics5

Key Requirements (2) Heat Load  Cavity helium pressure: 31 mbar Cavity helium pressure stability: ± 0.2 mbar Expected availability during scheduled beam operation: 98% Allow for independent commissioning of cryomodules Accommodate upgradeability in terms of future addition of cryomodules and cryogenic cooling capacity, and operation at higher accelerating gradient 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics6 PIP-II Cryogenic System Capacity, [W]70 K5 K2 K Nominal 6,5001,4002,500 Maximum* 8,4501,8202,875 * - maximum capacity includes uncertainty factors

PIP-II Cryogenic System Architecture Fully segmented Linac Single cold box with turbines and cold compressors Distribution box located in a refrigerator room Cryogenic transfer line with bayonet cans that runs parallel to the cryomodules 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics7

Cryoplant Cryogenic plant is 3 kW at 2 K plus shields - hybrid cycle  (~14 4.5K equivalent) Procured from industry. Similar to the currently procured ESS cryoplant The largest single cost element of the PIP-II cryo system Typically a long lead procurement item for a DOE project 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics8 hybrid cycle sample

Helium Compression Options 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics9 Pure cold compression versus hybrid –Pure cold compression cycle compresses cold helium in a series of cold compressors from cavity pressure (31 mbar) to slightly greater than atmospheric pressure. Cycle requires exclusively cold compressors which are hydrodynamic machines for the required PIP-II capacity –Hybrid compression cycle utilizes a series of cold hydrodynamic machines to compress helium up to about ½ atmosphere. The rest of the compression is achieved using a warm positive displacement machine. The machine is specially designed to ensure reliable operation with sub- atmospheric helium

Cycle Comparison 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics10 Cold Compression No need to have sub-atmospheric warm compressor Limited capability –Limited temperature range –Limited heat load range. Requires use of resistive heating for operation in off-design mode CHL-I and II/Jlab SNS/ORNL LCLS-II/SLAC Hybrid Compression High dynamic range –Various temperature levels –Various heat load High efficiency in off-design mode without resistive heating Using positive displacement machine CERN/LHC CMTF/Fermilab ESS Tore Supra XFEL/DESY 8

11/9/2015Klebaner and Theilacker | PIP-II Cryogenics11 5 Heat Load WVC CC Multistage cold compressors – cryogenic compression cycle Heat Load CC Cold compressors in series with warm compressor – hybrid pumping surge limit choke limit mass flow rate pressure ratio interstage pressure volumetric flow rate T He = 2.0 K T He = 1.9 K T He = 1.8 K Cold vs Warm Compression

Capacity Turndown 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics12 6 Cryogenic Pumping pressure ratio ≈ const Hybrid Pumping pressure ratio is variable Mass flow range Q = M × H vap Q – Heat Load; M – Mass Flow Rate; H vap – Heat of Vaporization “Cold” cycle (T He = 2.0 K): M/M design = 75% … 100% Q/Q design = 75% … 100% “Hybrid” cycle (T He = 2.0 K): M/M design = 50% … 100% Q/Q design = 50% … 100%

Temperature Reduction Capabilities 6/16/15Presenter | Presentation Title13 7 T He = 1.92 K p suc = 2450 Pa T He = 2.0 K p suc = 3130 Pa T He = 1.96 K p suc = 2780 Pa Cryogenic pumping:Hybrid pumping: T He = 2.0 K p suc = 3130 Pa T He = 1.8 K p suc = 1640 Pa T He = 1.9 K p suc = 2300 Pa supporting 1.8 K … 2.0 K temperature levels 1.9 K temperature level cannot be achieved

Cryoplant Procurement Cryoplant acquisition along with its installation and commissioning will be a collaborative effort between BARC- VC and Fermilab A single contract will be issued to industry to supply two identical superfluid cryogenic plants – one for BARC-VC and one for Fermilab The RFP will be issued through the Fermilab procurement system MIE contract to supply/provide –Engineering Services –Equipment –On-site services 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics14

Vendor Supplied Equipment Two helium warm compressors Single sub-atmospheric warm compressor Compressor oil removal system Motor control centers and variable frequency drives Gas management panel (GMP) A single cold box (vacuum vessel, heat exchangers, turbines, valves, etc.) Three cold compressors A purge panel Plant control system Plant instrumentation Built-in acceptance test cryostat (test box) Commissioning services Engineering, safety and operational documentation Klebaner and Theilacker | PIP-II Cryogenics1511/9/2015

What We Need to Provide Compressor and refrigerator buildings - new Warm and cold interconnect piping – new Auxiliary systems – new and reused from the Tevatron Engineering and technical services – BARC and Fermilab 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics16

Schedule and Milestones 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics17

Distribution Box Distribution Box (DB) receives all cryogens from the Cryoplant and distributes them via transferline to Cryomodules, and subsequently returns back all helium gas used during steady state and transient operating conditions including purification, cooldown, warmup, and all other operating modes Connection of the DB to the transfer line is a welded connection Connection of the DB to the Cryoplant is via removable vacuum insulated transfer tubes (U-tubes) The DB also houses safety relief, control and isolation valves and instruments 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics18

Distribution Box – Fermilab CMTF 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics19

Cryogenic Transfer Line Compound vacuum insulated cryogenic transfer line transfers helium from the distribution box to cryomodule bayonet can, and eventually to the cavities 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics20 Support Assembly Aluminum Extrusion G-10 Tubes Support Assembly

Cryomodules Bayonet Can 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics21 Cryomodule bayonet can allows to distribute cryogens to individual cryomodules from main transfer line Cryomodules are connected to the bayonet cans via U-tubes

Cryogenic Transfer Line with Bayonet Can 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics22

Auxiliary Systems Initial system purification equipment - reuse from the Tevatron Warm helium storage tanks – reuse from the Tevatron Liquid helium dewar - reuse from the Tevatron Helium recovery system - new Initial system purification equipment - reuse from the Tevatron 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics23

Nine Months Outlook Interface Control Document Naming Convention System Block Diagram Preliminary PFD Preliminary Valve and Instrument List Distribution Box Functional Analysis Bayonet Box Functional Analysis Cryomodule Bayonet Boxes P&ID Site Layout of Cryogenic Distribution Lines Pressure drop calculations Preliminary relief valves calculations Preliminary piping layout Components List with cost Information 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics24 Engineering effort on the PIP-II cryogenic system will be accelerated with help from two colleagues from BARC that joined our group recently

Summary Cryogenic System scope is defined Cryogenic plant is one of three major components of the system The plant is typically a long lead procurement item and is a subject an early acquisition Cryoplant FRS is released Work with Indian Collaboration on the cryoplant has started 11/9/2015Klebaner and Theilacker | PIP-II Cryogenics25