Preserving The Upper San Pedro River Basin Presented to: The Upper San Pedro Partnership Executive Committee October 7, 2009.

Slides:



Advertisements
Similar presentations
Borrego Valley Borrego Valley Integrated Regional Water Management Planning Integrated Regional Water Management Planning.
Advertisements

Decentralised Wastewater Management
Sustainable Regional Water Resource Management By: Tucson Regional Water Coalition and Southern Arizona Leadership Council.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Main San Gabriel Basin Management BASIN REPLENISHMENT by Anthony C. Zampiello San Gabriel Valley Water Forum Presented August 28, 2012 SAN GABRIEL VALLEY.
Wastewater Treatment Plant
SHALE PLAYS IN THE INTERMOUNTAIN WEST: LEGAL AND POLICY ISSUES Development of Shale: Water Resource Concerns & Policy Considerations Katy Dunlap, Esq.
Martha Davis Inland Empire Utilities Agency April 8, 2010.
No Agriculture without Water Water for secure and viable photo Arthus-Bertrand.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
AN ADVANCED URBAN WATER MANAGEMENT CONCEPT: GRAYWATER SEPARATION Sybil Sharvelle September 11, 2008.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
CHAPTER 17 CHAPTER 17 FRESHWATER RESOURCES TOILET TO TAP A California county is tapping controversial sources for drinking water.
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
Third Meeting May 22, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
BORDER ENERGY FORUM November 6-8, 2013 San Antonio, Texas.
Bay Area IRWMP Public Workshop #1 July 23, OBJECTIVES I BAIRWMP-Goals and Objectives II. DWR Guidance- “Measures” III Process IV. Proposed.
Introduction to the Sustainable Sites Initiative Founded in 2005 as an interdisciplinary partnership between the American Society of Landscape Architects,
1 Recycled Water Program for the City of Los Angeles.
NRCS Watershed Rehabilitation
COUNTRY PAPER ON REUSE OF LOW QUALITY WATER IN EGYPT.
Water and Land Use: The Efficiency Connection Mary Ann Dickinson Executive Director California Urban Water Conservation Council.
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Animal Agriculture and Water Resources in Texas Ned Meister Director of Commodity and Regulatory Activities Texas Farm Bureau Steel Maloney Principal Hydrologist.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
BECC Certification Criteria. Our Role in the US/Mexico Border  The Border Environment Cooperation Commission and the North American Development Bank.
National Capital Region Climate Change Report Presentation for the Potomac Watershed Roundtable Stuart A. Freudberg Director, Environmental Programs Metropolitan.
City of San Luis, Arizona Rapid Assessment Process Project Strategic Plan City of San Luis Water & Wastewater Improvements Yuma County, Arizona Presented.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
 The SNC’s mission is to initiate, encourage and support efforts that improve the environmental, economic and social well- being of the Sierra Nevada.
Presenter: Sally Spener
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Environmental Infrastructure Needs Assessment: GIS Based Decision Support System Southwest Center for Environmental Research and Policy Presented by Rene.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Show Me the Measures: Performance Measures for Environmental Services City of San Diego, CA Elmer Heap, Director Environmental Services Department.
Case Study: Saving the San Pedro River Adam Czekanski 17 November 2005.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
1 Arizona/Sonora Regional Workgroup Recent Accomplishments.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Commission for Environmental Cooperation of North America Water and Climate Change: Sustainable Management of Natural Resources Eugenio Clariond-Reyes.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
A QUICK GUIDE TO BORDER 2012 WATER PROGRAM Eugenia McNaughton, U.S. Environmental Protection Agency Region 9 San Francisco CA.
INCREASING THE DIALOGUE BETWEEN SCIENTISTS, POLICY MAKERS AND STAKEHOLDERS SUBERNAREKHA RIVER BASIN, INDIA SOCIO-ECONOMIC ISSUES AND POLICY OPTIONS RAMESH.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
A Mass Balance Approach to Evaluate Salinity Sources in the Turlock Groundwater Sub-basin Presentation to Technical Advisory Committee, Central Valley.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
XVI World Water Congress Cancun, Quintana Roo
United Nations Industrial Development Organization
Florida and Reclaimed Water
WASTEWATER MANAGEMENT IN TURKEY
Republic of Kazakhstan Priority Issues in 7 Major River Basins
Water Statistics and Water Account in Jordan
Water Statistics and Water Account in Jordan
Washington State Infrastructure Financing
Nebraska Water Infrastructure Funding and Financing Programs
Water Supply Planning for the Twin Cities Metropolitan Area
Environmental Priorities Environmental Impact Assessment
Presentation transcript:

Preserving The Upper San Pedro River Basin Presented to: The Upper San Pedro Partnership Executive Committee October 7, 2009

Border Environment Cooperation Commission (BECC) North American Development Bank (NADB) “Preserve, protect, and enhance US-MEX border region by identifying, developing, implementing and overseeing environmental infrastructure projects” The NADB finances the construction of projects certified by BECC. A project that will “prevent, control or reduce environmental pollutants or contaminants, improve the drinking water supply, or protect flora and fauna so as to improve human health, promote sustainable development, or contribute to a higher quality of life” 2

Board of Directors Representative of the border states (Baja California) Public member who is resident of the border region (Nuevo Leon) Representative of the border states (New Mexico) Public member who is resident of the border region (Texas) A unique and innovating structure among binational organisms, where the civil society is represented within its Board of Directors.

Coverage & Sectors 100 km on the U.S. side of border 300 km on the Mexico side Covers 1.2 million km M residents BASIC SECTORS Water Sewage systems Wastewater treatment Water Reuse Storm Water Systems Solid Waste EXPANDED SECTORS Water Conservation Air Quality Public Transportation Clean and Efficient Energy Hazardous Waste Solid Waste Reduction& Recycling Municipal Planning

$3.46 $982.9 CERTIFIED PROJECTS TOTAL INVESTMENT (BD) NADB FINANCED PROJECTS* NADB FINANCING* (MD) 12.6 POPULATION BENEFITED (M) MX 83 US 78 MX 62% US 38% 5 *Only contracted agreements are included, not total approvals.

California 12 $ Arizona 13 $ New Mexico 8 $ Texas 45 $ in USA $ 1, in USA $ 1, in Mexico $ 2, in Mexico $ 2, Sonora, 20 $ Chihuahua, 18 $ Coahuila 3 $ Nuevo Leon, 4 $ Projects with an investment of $3,463 million dollars Baja California 23 $ Tamaulipas, 15 $ Certified Projects ( Cost in million dollars)

California $2,086,065 Arizona $4,140,816 New Mexico $3,653,109 Texas $13,078,300 USA $22,958,290 USA $22,958,290 Mexico $14,198,247 Mexico $14,198,247 Sonora,$3,563,404Chihuahua,$2,881,644Coahuila$1,370,136 Nuevo Leon, $438,009 Total of Technical Assistance: $37.16 million dollares Baja California $2,183,014 Tamaulipas,$3,762,040 Technical Assistance

17 Solid Waste Management: 2.9 million residents with improved waste collection and disposal services, resulting in the capacity to properly dispose of 1,550 tons of waste per day 25 Water Conservation: Estimated annual water savings of 330 million gallons per day. As a comparison, this quantity is sufficient to serve the average drinking water demands of 4 million people. 83 Water and Wastewater: Providing improved drinking water treatment/distribution as well as wastewater collection/ treatment for the benefit of more than 12 million border residents, most significantly impacted by new capacity to eliminate 300MGD of untreated or inadequately treated sewage 8 11 Air Quality Projects: 6.7 million residents benefited from reduced exposure to air pollution from vehicular traffic on unpaved streets. Approximately 100,000 tons per year of PM 10 anticipated to be eliminated. 2 Energy : Offset demands of traditional fossil-fuel based energy production, avoiding 630 tons of CO 2 per year. Measuring Results: Social and Environmental Benefits

State Number of Projects in BECC’s Pipeline (SEPTEMBER-09) Solid Waste Air Quality Clean Energy Water /Wastewater TOTAL Estimated Cost (MD) Non-BEIFBEIF California001157$73.20 Arizona000033$20.77 New México000033$48.80 Texas $ Total US $ Baja California $69.48 Sonora $70.25 Chihuahua $ Coahuila310116$9.84 Nuevo León230016$18.76 Tamaulipas $5, Total MX $5, Total Projects Estimated Cost (MD) $25.31$161.41$4,816.65$685.23$ $6,030.19

September 2009 Solicitation for 2009 applications was held 155 applications received Evaluation to be completed by October 2009

 To meet this goal ENRD has partnered with BECC to search for a solution to continue with the Upper San Pedro River Basin groundwater resource protection.  The Upper San Pedro River (USPR) Basin is one of the most diverse well-known avian habitats (Arias et al. 1999).  >400 avian species in the basin (Krueper 1999), and ~1 to 4 million neotropical migratory birds annually during migration in the riparian corridor (Arias et al. 1999).  Fort Huachuca’s Environmental and Natural Resources Division (ENRD) is responsible for the USPR Basin protection and improvement.  ENDR understands that changes in the depth of the water table, and river surface flow can greatly impact riparian vegetation and the animal species in the region.  ENDR is currently looking forward meeting groundwater pumping marks by  GOAL: Achieve approximately an additional 1,000 acre-feet per year (AFY).

 Recharging treated wastewater to store in the USPR aquifer.  Decreasing underground pumping from USPR aquifer.  Finding a potential alternative for protecting the shared USPR watershed.  Focus Community is Naco, Sonora ◦ Reduction of water demands ◦ implementation of water conservation, micrometering ◦ Treated/Reclaimed WW infiltration

 Direct Impact to the USPR.  Water supply source is the USPR watershed.  High extraction and consumption rates.  Over 57% losses in current water distribution system.  Non-existent water conservation programs.  Currently looking for a wastewater treatment solution.  Represents a win-win project.

 Water Supply: gpcpd.  Extraction Rate: 1.02 MGDs (1,142 AFY)  DW Service Coverage: nearly 100%.  Number of Connections: 1,872.  Household Connections: 1,810. Water Losses: 57% of water supply. Micrometering Coverage: 50%. Fixed rate for household usage.

 Wastewater Collection Service Coverage: 92%.  WW discharge: 0.80 MGD (894.5 AFY).  WWT lagoon Capacity: 1.14 MGD (1,277 AFY).  Have selected the best alternative to find a point of discharge.  Currently reviewing proposals to develop EA.

 Wastewater Treatment Improvement in Naco, Sonora (PDAP Funds) ◦ To provide treated wastewater discharge infrastructure at the east lagoons and thereby prevent untreated wastewater bypasses that result in an average of 4 l/s of raw sewage spilling into Naco, Arizona. ◦ Completed an Alternative Analysis, currently developing the EA for the NEPA process.  Drinking Water System Improvements in Naco, Sonora (PDAP Funds) ◦ Construction of a drinking water storage tank (40,000 gal) and drinking water distribution infrastructure rehabilitation, to serve 600 existing connections. ◦ Currently developing Pre-design, to determine type of storage tank required

 Water metering incremental from 50 to 100 percent.  Base rate fee on actual usage.  Water loss detection and repair strategy plan.  Installation of water conservation mechanisms in each household: in toilets, showers, and faucets.  Treated Wastewater Infiltration lagoon

Percent Change Population5,9267,28123% Water Supply (gpcpd) % Water Demand (AFY) 1, % Usage Reduction (AFY) %

Proposed dam location as discharge point Existing force main Objective: To pump treated wastewater flow from the effluent in lagoons to dam and re- use for irrigation activities. Distance from international U.S.- Mexico Border to dam: 2 mi Dam Capacity: 8 MG Additional pipeline length required, approximately 350 ft

Available land for the infiltration lagoon: 5 acres Storage Capacity: 20 days

Existing Dam Existing pipeline Non- existent Segment Stabilization Lagoons

ConceptCost (US Dollars) NEPA Process50,000 Pre Design50, meter installation (reaching 100 percent water metering) 155,042 Water loss detection and repair312,184 Household Water Conservation Device Installation 57,778 Infiltration Lagoon Option (Final Design and Construction) 852,800 Total1,477,804

 Infiltration Lagoon Option: ◦ Hydraulic Study and planning ◦ Environmental Clearances – EA under development ◦ Final Design ◦ Construction  Water Conservation: ◦ Pre Design, planning ◦ Environmental Clearances – EA and MIA ◦ Final Design ◦ Construction

 Investigate Policy Issues/requirements with State of Sonora Water Commission(CEA) and National Water Commission of Mexico (CONAGUA).  Involving ADWR and ADEQ.  Initiate meetings with International Boundary and Water Commission (IBWC).

Questions or comments