TAC2 Alpi consolidation in Cryogenics and Cryomodules.

Slides:



Advertisements
Similar presentations
SEMINARIO CERN a LNL/INFN
Advertisements

Cryomodule Concepts & Cryogenics J.D. Fuerst SPX Technical Study Group Meeting 27-29JUL10.
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
UNICOS-CPC applied to Cryogenics and specifications Benjamin Bradu EN-ICE-PLC February 2014.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
An Overview of Cryogenic Operations at ESS J. G. Weisend II, P. Arnold, E. Bargallo, C. Darve, N. Ellias, J Fydrych, W. Hees, J. Jurns, D. Piso, X.L. Wang.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
Study and Development of Large Cryogenic Systems in China
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Z. W. Zhou, Q. Y. Zhang*, X. F. Lu, L. B. Hu and P. Zhu
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Cryogenic System Operation and the Progress of SSRF II
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Status of the cryogenic system for B180
ESS Target Cryogenic System European Cryogenic Days CERN
Zhiwei Zhou, Qiyong Zhang* and EAST Cryogenic Team
Mathew C. Wright October 2016
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
High Magnetic Field Lab, CAS
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
SNS Cryoplant Commissioning Past Experiences
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

TAC2 Alpi consolidation in Cryogenics and Cryomodules

Laboratori Nazionali di Legnaro

ALPI Auxiliary Cold Box (LN2 bath) BNHeP-13 Helium Gas Circulators: 2 Barber Nichols helium pumps in series: 6 bar each Δp=0,54 bar each ALPI refrigerator (150g/s): ,5K and 60-75K 1 supercritical turbine 4 compressor units 1 AUX ColdBox (LN2 80K ALPI

20 cryo-modules housing in total 73 superconductive resonators 4,5K : 16 Nb bulk 57 Nb sputtered on Cu 120 m helium cryogenic transfer lines (four in one) 50 m Liquid nitrogen cryogenic transfer lines (photo by F. Mangiaracina) ALPI-LINAC

PIAVE Cryoplant – Linde TCF50: 406 4,5K with LN2 (334 W no LN2) 3 Cryo-modules housing: 8 QWRs Nb quarter wave resonators 2 Nb Superconducting Radiofrequency Quadrupoles (SRFQs) PIAVE

Linde TCF20 liquefier: production: up to 100,000 liter/year storage: 5000 liter dewar New Control system with CERN - UNICOS: New cabinet PLC Schneider SCADA WinCC_OA He Liquefier

Helium Purification: 3 x Dryers 70 m 3 /h 1 LN2 Purification Unit: 60 Nm 3 He N50 3 cryogenic helium purifiers (cryogenic refrigerator) Helium Gas recovery system: Upgrade towards UNICOS in progress 2 tons is the LNL Helium inventory 900 m lines connected to recovery system 4000 m 2 area served 3 gasometers, total capacity 200 m 3 3 piston compressors 200Nm 3 /h each Recovery & Purification

I.Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems II.Update of ALPI cryogenic Valve Boxes III.Cryogenic Control System migration and development towards UNICOS- CERN Standard

Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems Refurbishing of Auxiliary Cold Box Optimization of cryogenic circuit New static insulation system New control system What has been done:

New static shields Optimizazion of LN2 refilling New control System Refurbishing of Auxiliary Cold Box

Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems Up-grade low Beta LINAC New LN2 cryogenc transfer line New RF tuner and coupler Ner LN2 cryogenic line in the cryomodules What has been done:

New LN2 distribution line for low beta cryomodules

LN2 distribution line for low beta cryomodules

Phase Separator

new coupler installation new LN2 line in the cryomodules New RF tuner Low Beta Cryomodules Up-grade

Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems Up- grade Cold Box: Supercritical Turbine Installation of III turbine on the Cold Box New cabinet for the Up-grade of CBX control system What has been done:

2012

Supercritical TurbineProcess condition: Inlet pressure: 15,8 bar abs Outlet pressure: 2,8 bar Inlet temperature: 5,1 K Outlet temperature: 4,8K Nominal speed: 1670 Hz Mass 5,4 K: up to 33 g/s Refrigeration Power: 416W

Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems Refurbishing of ALPI Cold Box New positioners for the Control Valves New Elettro-Pneumatic Distribution panels Cryogenic process and equipment optimization ….and what we have to do:

Supercritical Turbine Installation Control Valves Positioners New Elettro-Pneumatic Distribution panels Optimization of cryogenic Process & Equipment ALPI Cold Box

Up-grade of purification & recovery system Addiction of a second purification line on the LN2 purification Unit Installation of the monitoring station for helium impurities Automation of the recovery system Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems ….and what we have to do:

Manual valves replaced by Actuated valves Recovery System

new purification line LN2 Purification UnitDrying System Purification System H2OH2OAIR

Renewal of ALPI valve boxes Valve box outstanding maintenance Replacing of cryogenic control valve inserts Replacing of on/off cryogenic valve having pneumatic actuator installed inside vacuum

ALPI valve boxes serve the cryomodules to supply LHe and Cold He Gas Single:1 Contro Valve (Lhe IN) 3 ON/OFF valves Double:2 Contro Valve (Lhe IN) 6 ON/OFF valves

Cryogenic Valves Renewal

Cryogenic Control Valve insert approx 10,000 cycles using 20 years

Cryogenic on/off valve replacing

Renewal of ALPI valve boxes New Valve Boxes new valve boxes for CR01, CR02, CR21, CR22 (new Lay-out)

Helium Transfer lines new valve boxes CR22 CR02CR01

ALPI - LINAC VBX CR02 CR01 VBX CR01

 ALPI – LINAC Cyomodules  ALPI Cryogenic Refrigerator  Helium Liquefier Linde TCF20 Cryogenic Control System migration and development towards UNICOS- CERN Standard

Liquefier TCF20 ALPI Refrigerator LINAC Cryomodules ALPI Trends «Guard» Trends Purification Unit PIAVE Refrigerator ALPI AUX Cold Box WinCC_OA SCADA Supervisory Control And Data Acquisition Standard UNICOS - CERN

Standard electric components & Standard Programming Style Standard UNICOS - CERN

NEW CR21 NEW CR22 EX-PIAVE B B CRB2 Linac Lay-Out

Cold Box Control System ALPI

PLC New CABINET New field connection Control System: STANDARD UNICOS New Main Cabinet New Control System New Supervision

 ALPI – LINAC Cyomodules  ALPI Cryogenic Refrigerator  PIAVE Cryogenic Refrigerator  Helium Purification System  Helium Recovery System  Helium Liquefier Linde TCF20 Cryogenic Control System migration and development towards UNICOS- CERN Standard

I.Refurbishing of ALPI Cryogenic Refrigerator, Purification & Recovery Systems II.Renewal of ALPI valve boxes III.Revamping of Cryogenic Control Systems based on Standard UNICOS- CERN …..will increase the reliability for much more than others 20 years …in summary