E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.

Slides:



Advertisements
Similar presentations
MNP – ONSHORE & OFFSHORE GROUP QUALITY MANAGEMENT SYSTEM
Advertisements

Electricity Price Breakdown Fix at premium or Pass Through.
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Purpose & Values Purpose:
2014 POWER PLANT DYNAMIC BUSINESS MODEL. COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya.
Resource Adequacy in PJM
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
Workshop on Energy Statistics, China September 2012 Electricity and Heat Statistics 1.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
Maximizing production efficiency for existing and new power infrastructure: Enel experience in Russia and technologies Enrico Viale Chief Executive Officer,
Managing the Information Technology Resource Jerry N. Luftman
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
LECTURE. FORMATION OF PRICE FOR THE COMPANIES PRODUCT Plan lectures 1. Price and types of prices 2. Classification prices 3. Pricing policy of the enterprise.
1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
1 ICAO TECHNICAL COOPERATION BUREAU Financial and Budgetary Control and Audit.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Lakshman Wijeyewardena Director General Industrial Services Bureau Role of Business Development Service Providers – Implementation of Technology.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
RAO “UES of Russia” Action Plan on Reliability Improvement of Unified Power System of Russia August 29, 2005.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Fleet Performance and Reliability in Generation Utilities
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
DMITREY MEDVEDEV PRESIDENT OF THE RUSSIAN FEDERATION: «Land must be made to serve residential construction». VLADIMIR PUTIN THE PRIME MINISTER OF THE.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
NETWORK PERFORMANCE DEPARTMENT. OUTLINE OF PRESENTATION MISSION VISION STRUCTURE STRATEGIC OBJECTIVE STAFF STRENGHTH ON-GOING ACTIVITIES AND INITIATIVES.
“The Quality Infrastructure in Lebanon” Export Norms, Quality Control and Competitiveness FUTURE PROGRAMME Prepared By Ali Berro Director of Quality Programme.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» October 2001Moscow.
Renewables and System Services Ann Scully.
African Regional Director
Budget and Finance Managing Finances for PT Services.
October, 2015 PREPA’s Transformation A Path to Sustainability.
By Rasa Snipiene, Director of PCU1 Education Improvement Project, Lithuania Management and Operation.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Illinois Wholesale Market Update December 10, 2003.
Marketing of CCP's in Germany - Experience report of a German Company.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
2012 International Fleet Barometer Local report UK.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
Corporate Learning Center The AES group of companies in Kazakhstan.
1 Fleet Sourcing Project Presented to the City Council By Wayne Corum, Director Equipment Services Department (ESD) November 17, 2009.
Open Access Power Purchase
Long-Term Planning Presented by: APP Site Visit Don Untch
Uniper Energy Services
Process Economics Factors that affect profitability
GEORGIAN ELECTRICITY MARKET OPERATOR
Performance indicators Unplanned unavailability
PRIORITY NATIONAL PROJECT
Planning Actual execution of maintenance & upgrade
Long-term Capacity Market
Giorgia Pasqualetto Project Associate Department of Energy UNIDO
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
TGC-1 9М 2018 IFRS Results 9 November, 2018.
The Role of Private Sector in Capital Budgeting
Presentation transcript:

E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov

Net installed capacity Net generation volume Availability KPI Efficiency Overview of key E.On Russia achievements Overview of 2012 technical KPI E.ON Russia vs. E.ON Europe and Russian energy system Content Overview of ERU Production activity Production capacities Actual running hours Organizational structure Organizational model Plan-Do-Monitoring-Analysis Integration into Fleet Overview of achievements Overview of results Energy market model – Why is UU crucial KPI for ERU? Costs covered by capacity tariff Capacity payment UU in the money

ERU Production capacities Москва Smolensk power plant Net capacity: power [MW] 3 х heat [MW] 77 Utilization*while available [%] 35,7 TRIF* 0,0 Commissioned Yaiva power plant Net capacity: power [MW] 4 х ,6 heat [MW] 83 Utilization while available [%] 70,7 TRIF 0,0 Commissioned / 2011 Moscow Bereza power plant Net capacity: power [MW] 2 х heat [MW] 938 Utilization while available [%] 75,9 TRIF 0,8 Commissioned Surgut-2 power plant Net capacity: power [MW] 6 х ,3 heat [MW] 977 Utilization while available [%] 81,3 TRIF 0,0 Commissioned / 2011 Key consumers are large power distribution companies and industrial enterprises ERU Net capacity: power [MW] heat [MW] Utilization while available [%] 70,9 TRIF 0,2 ~ km  ERU has the highest Efficiency and utilization among competitors  73% of capacities are located favorably in terms of fuel supply  Power plants are located in regions with consistent consumption increase Consumers Düsseldorf ~ km Shatura power plant Net capacity: power [MW] 3х186,4 + 2х195,7 +1х74, ,61 407,6 heat [MW] 284 Utilization while available [%] 39,6 TRIF 0,0 Commissioned / 2011 * Actual 2012 values

Actual running hours (ERU Steam)

Organizational structure Deputy General Director on Production Production & Technology division (5 employees) Maintenance & upgrade division (6 employees) CCGT division (5 employees) Health & Safety division (4 employees) Collection of operation plans, analysis and reports division (3 employees) Chief engineers of plants Directors of power plants Key responsibilities: Production & Technology division – keeping of an engineering policy, operational excellence, environment management Maintenance & upgrade division – development and execution of maintenance and refurbishment plans Health & Safety division – arrangement and keeping of a supervisory control over complying with HSE standards, technical rules, industrial and fire safety norms and requirements Collection of operation plans, analysis and reports division – accounting and deviation analysis of financial indicators of production plans CCGT division – operation and service of CCGT unit

Organizational model Production Assessment of actual equipment technical conditions Development & implementation of continuous reliability improvement projects Maintenance & upgrade management Tracking deviation vs. regulations requirements and unplanned unavailability Accounting and analysis of performance parameters Supervision and corrections operation modes Development and introducing of continuous fuel consumption efficiency improvement Budget management (operation, maintenance and upgrade) Benchmarking, best practices introducing Incidents record and report Incidents analysis and development for its decrease Actual assessment of infrastructure technical conditions Development & implementation of continuous improvement of infrastructure conditions Corporate standards and policies application UU TRIF, SIP, СО2 Efficiency, Fuel consumptio n KPI: Reliability KPI implementation Efficiency KPI implementationHSE & environment KPI implementation 1. Reliability 2.Efficiency 3. HSE

Planning Long-time planning of generating units maintenance and equipment replacement. 3-year planning of maintenance and replacement Annual planning of maintenance of auxiliary equipment Determination of works volume and MTP. Budgeting. Net graphs of generating units maintenance and upgrade execution Monthly scheduling and correction of work volumes Actual execution of maintenanc e & upgrade Scheduling of annual maintenance & upgrade activities Summary planning of materials needs.

Acting/monitoring Real-time production monitoring Tracking deviation vs. regulations requirements (chemical parameters, vibrations etc.) Expert estimate of units starts and shut downs by historical and on-line trends

Acting/monitoring. Dashboard for manager

Analysis. Efficiency, reliability

Overview of key E.ON Russia achievements 2 1 Sucessfull application for OHSAS 18001:2007. Certificate by BUREAU VERITAS 2 Target achievement TRIF=1.16 (Actual 2012=0,20) Target achievement E.ON Russia UU=1.88% (Actual 2012=1.24%) 3 CCGT-personnel preparation, Commissioning and commercial operation start of 3 new CCGT generation units Development of new CCGT-technology exploitation experience 4 Increase of installed capacity of Bereza power plant from 750 up to 800 MW 5 Registration of all new CCGT building projects as Joint Implementation projects in terms of Kyoto Agreement Transaction of the ERU (Emissions reduced units) for Service contract for Yaiva CCGT (Siemens equipment) unit up to the best E.ON practices 7 Integration into E.ON CCGT Fleet

Overview of E.ON Russia results GWh mln €

E.On Net generation capacity and Net generation volume CCGT Steam 13

Availability KPIs For information: Availability= (Net Generation Volume + MWh Available on Standby + MWh Not Running due to External Influence)*100%/Net MWh for Period UU (unplanned unavailability) = Net MWh Unplanned Unavailable*100%/Net MWh for Period PU (planned unavailability) = Net MWh Planned Unavailable*100%/Net MWh for Period 14

ERU place in Russian energy system 15

Capacity tariff and payment Generation volume Profit Fixed costs Variable costs UU=0% Full capacity payment Reduced capacity payment UU>0% Capacity tariff Maintenance costs Labour costs and insurance Amortization Materials costs (non- fuel) GRID- operator services Purchasing of electricity and heat energy Others Full capacity payment = N inst *Tariff Reduced capacity payment = (N inst – N UU )*Tariff = (1 – UU)*N inst *Tariff

Capacity tariff and payment

Integration into E.ON CCGTSteam Implemenation paper of ERU integration into E.ON Functional Fleet Management Inclusion into Steam fleet as previous GSC world Goals: 1.Experience accumulation and information exchange in terms of CCGT units operation, maintenance & service; 2.Application of modern approaches for CCGT operation, maintenance & service, support in exploitation activities; 3.Usage of benefits from integrated procurement and negotiating procedures (equipment and services) for CCGTs, as well as from mid-term ERU budget expert estimation by Gas-CCGT Fleet expertes. Examples: 1.Bridgehead appointment in E.ON UK 2.Work of E.ON UK employees at E.ON Russia power plants (Yaiva, Shatura, Surgut-2) 3.Benchmarking engagement Goals: 1. Best practices exchange 2. Benchmarking engagement 3. Mutual support when necessary Examples: 1.Quarter KPI-report in E.ON format 2.Annual benchmarking report and continuous improvement process engagement 3.Visit of power plants (f.e, while searching design for dry fly ash system for new Bereza unit 3) 4.Market model exchange (visit of Mr.Kudryavyi – the member of work team by Ministry of Energy) 5.Partner inspection in HSE area 18