Hilario J. Negrón (787) 846-3500 ext 3223 (787) 642-2331 Measuring Operational Efficiency.

Slides:



Advertisements
Similar presentations
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Advertisements

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Efficient Steam Systems
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Water Balance Study Water Treatment, Management and Conservation Solutions.
Components of HVAC System
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Energy Efficient Steam Systems. Steam Systems Steam systems most widely used type of process heating Advantages of steam: –Heat carrying capacity of steam.
Chilled Water Piping Systems (VPF Focus)
Booster System Basics: Constant Speed Systems
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Steam Power Plant.
Steam condensers Functions: Lowers back pr. of turbine exhaust Enables recovery and recirculation of feed water Enables the removal of air and non- condensable.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
STEAM CONDENSERS.
Piping Systems.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Chilled Water Systems Total Cost of Ownership
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Sustainable Management Resources Inc Join SMRI as we work on: “Creating a Sustainable New Economy” SMRI, San Diego CA, ~ ~ Steve Kaplan ~
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
Data centre air management Case studies Sophia Flucker.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
COMMERCIAL BOILERS. HIGH MASS Advantages Flow Indifferent Primary Piping Resistant to low return temperature issues Up to 1200 H.P. 20 plus year life.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
The Importance of Distribution. Manifold Position And Vapor Trail.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
Baldwin Wallace College (Berea, Ohio). Two KN20 boilers installed to replace old atmospheric cast iron boilers. KN boilers are true cast iron sectional.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Prepared by : Nishant .A. Raval
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
Lesson 7 Steam Power Plant.
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
Review Questions Chapter 5
Lecture Objectives: Discuss Final Project
PRIEN / PIAA Meeting April 30, 2009 Pfizer Caguas
Thermodynamics Cycles.
Variable Frequency Drive Savings Calculator Tools
AUTOMATIC ON-LINE BRUSHING FOR HEAT EXCHANGERS AND CONDENSERS
Lecture Objectives: Answer questions related to HW 4
Desuperheater Heat Transfer Device Manufactured by Maniks
Energy Efficiency in District Coiling System
Recirculating CO2 System
Presentation on Cogeneration and District Cooling Plant
STEAM CONDENSERS AND COOLING TOWERS Marks-16
First Exam is on March 21 Examples are posted on the course website !
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Condenser in Power Plants
Boiler Safety Valve Regulations
Presentation transcript:

Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency

Monitoring of systems is an important part of maintaining the systems efficiencies, the monitoring process pinpoints problems in any of the systems and provides alarms to solve the issues and avoid costly operational costs PIAA / PRIEN, September 9, 20092

3

4

5

6

7 Boiler System Pretreatment CurrentPotential Boiler Make up Water Operating CostsOperation Hourly steam production (lbs / hr.)20,000 Total annual steam flow175,200,000 Ann. Feedwater (pounds)194,666,667178,775,510 Total feedwater flow in gallons24,641,35022,629,811 Annual condensate - (Gallons)7,392,405 Make up volume (gallons to boiler)17,248,94515,237,406 Total make up gallons (to pretreatment)6,411,39620,316,542 Blowdown rate10.0%2.0% Ann. Blowdown (pounds)19,466,6673,575,510 Blowdown volume (gallons)2,464,135452,596 Blowdown enthalpy (mm BTU's)4, M.U. water charge rate ($/ooo gals.)$2.00 M.U. water cost$34,498$30,475 Sewer discharge rate ($/ooo gals)$2.50 B.D. sewered water cost$6,160$1,131 Plant energy value ($ / mm BTU's)$20.37 Blowdown energy cost$88,409$16,238 Boiler chemical cost$35,000$18,500 Total operating cost$164,067$66,345 Savings comparison with current cost$97,722

 Automatic Blowdown Controls  VFD Boiler Operation  Economizer  Pressure reduction

PIAA / PRIEN, September 9, – 0.7 Excellent Good >.85 Needs Improvement

10PIAA / PRIEN, September 9, 2009

11

Advantages of Primary Secondary Variable Flow System  Very reliable system  System has been proven for many years  Primary system is completely disconnected from secondary  Control system is more simple than variable primary flow  Does not have to monitor flow through chiller Disadvantages  System requires more pumps to operate  Energy consumption is greater than primary flow system  By system will provide water mixture at part loads that will cause supply / return temperatures to vary from design  By-pass system requires more floor space than VPF PIAA / PRIEN, September 9,

Advantages of Variable Primary Flow  Lower first costs  Less equipment to install in mechanical room  Less power required for equipment  Less plant space required since there is less equipment  Reduced pump energy  Higher efficiency pumps  Reduced pressure drops due to fewer pump connections, valves piping etc.  Supply water quantities and temperatures are always maintained at design parameters PIAA / PRIEN, September 9,

Variable primary Flow Design issues  Evaporator flows  Design to maintain minimum water velocity in chiller evaporator tubes at low flow conditions ▪ Before 3 fps was minimum, now 1.5 fps can be achieved  Flow fluctuations in system can affect chillers  Controls  Control systems for VPF systems are more complex than primary secondary ▪ Flow fluctuations ▪ No flow conditions ▪ Bypass valve failure PIAA / PRIEN, September 9,

 Cooling tower cycles  Soft water makeup to cooling towers  System recommissioning balance  Temperature set point