Mathias Reinecke CALICE week - Manchester8.9.20081 Electronics Integration - Status Mathias Reinecke for the AHCAL developers.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

Mechanical Status of ECAL Marc Anduze – 30/10/06.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
The HCAL barrel absorber structure
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
LED notched fibre system short HBU0 party with QMB6
CALICE DAQ Developments
Enrique Calvo Alamillo DAEGU
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
Status of the DHCAL DIF Detector InterFace Board
HCAL task status report
Testbeam Timing Issues.
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
State of developments on Readout interface of European DHCAL
First thoughts on DIF functionality
Presentation transcript:

Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers

Mathias Reinecke CALICE week - Manchester Next prototype: Architecture the future … 1st EUDET Prototype (1st step) Commercial DIF, new mezzan. (CALIB, POWER), 1HBU (later: 6)

Mathias Reinecke CALICE week - Manchester Prototype Tiles Prototype Tile for HBU0 SiPM (0;15) Mirror Alignment Pins (22.5;7.5) (7.5;22.5) (0;0) WLS Mechanics Tile for HBU0 dimensions in (mm;mm) prototype tiles (structures machined, not moulded): Problems with SiPM assembly, impact on time schedule for HBU0!! Cutout (~8mm) for cassette construction (done by „drilling“) (30;30)

Mathias Reinecke CALICE week - Manchester Tiles for EUDET module Standard Tile (moulded) SiPM (0;15) Mirror Alignment Pins (7.5;22.5) (22.5;22.5) (0;0) WLS (mm;mm) No time schedule up to now. (30;30) Shorted (by 1cm) tile for inter-layer sizes

Mathias Reinecke CALICE week - Manchester HCAL Base Unit (HBU0) Signal IN Power IN Cassette fixation Mechanics Tile Temp. Sensor SPIROC1 Debug Conn. Flexlead Conn. Two signal paths SPIROC2 Prototype Tile Calibration Electr. (LED + Charge Inj)

Mathias Reinecke CALICE week - Manchester HBU0 Status HBU schematic top layer -Integration concept fixed -Schematic (Mentor Graphics CAD) finished -Layout is waiting for tile geometry information -Critical parts (connectors) ordered. -Layout is complex (1-2months), PCB manufacturing and assembly: 1-2months => realization in 2008 already critical! Design progress is interrupted due to missing tile information. Shall we proceed without tile information? => Large gaps between tiles, large holes (1mm) in PCB for SiPM pins. Not a real integration test …

Mathias Reinecke CALICE week - Manchester HBU Interconnection (Flexleads) Flexlead Structure Rigid (FR4) Flexible (polyimide) Connector (0.8mm) -Two types of Flexleads (for Signals, Power) have been designed (CAD) -Flexleads allow +/-100µm displacement of connecting modules -Magnet-field tests up to a few Tesla done: no problems seen. -Flexleads can be ordered now! Flexlead CAD Layout

Mathias Reinecke CALICE week - Manchester DIF Status -Based on commercial FPGA (Spartan3-1500) board -Command list and DIF state diagram in preparation -VHDL code generation soon (prototype firmware for USB access in 2008) DIF command list DIF state diagram Firmware status of ECAL/DHCAL? Reference documents for LDA-DIF interface (also: DAQ group)? Firmware development needs closer coordination.

Mathias Reinecke CALICE week - Manchester CALIB Status „AHCAL Calibration System“ (UV-LED and Charge Injection) -Concept fixed, schematic finished -µController software dev. ongoing (good progress) -Layout (CAD) starts now, expected to be finished: End of September. -Module should be available: November/December 08 By M. Zeribi

Mathias Reinecke CALICE week - Manchester POWER Status „AHCAL Slab Power Regulators“ -Regulator setup fixed, schematic finished -Suitable for ILC-like power cycling -Layout and Production probably in 2009 (module can be replaced initially by bench-top power supplies) By H. Wentzlaff

Mathias Reinecke CALICE week - Manchester AHCAL Slab Interface (Mech.) Cassette bottom plate, extended Cooling pipe HCAL Endcap Board (HEB), with DIF Light-seal Robust interface connector HBU Flexlead interconnection HBU PCB Tile SiPM 10cm Steel absorber 2cm Component height Preliminary! Interface Board (IB) Not in scale!!

Mathias Reinecke CALICE week - Manchester Mechanics Status - Mechanical proposal (cassette, interface to DIF) has been set up for the AHCAL prototype (HBU0, DIF as commercial board). -The necessary mechanical parts are currently designed within CAD tool => production within 2008 HBU0 cross section CALIB Next HBU0 DIF

Mathias Reinecke CALICE week - Manchester Conclusions -AHCAL technical prototype (TP) does not cover a full slab, but ~150 channels (2 HBU0s, tile-prototypes). -Eudet module (detector layer) requires HBU redesign. A full slab (and detector layer) is expected for summer/autumn timeline for TP is defined by HBU0 (tile geometry missing). -development of the modules CALIB and DIF (firmware) in 2008 possible. But for HBU0 we need the tile information to proceed.