GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 6 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST LAT System Engineering
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Environmental Test Planning Meeting
GLAST Large Area Telescope
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical Test: Plans and Procedures John Ku Design Integration and Analysis Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 2 Purpose / Contents Demonstrate readiness to proceed with environmental testing of the integrated flight instrument, i.e. the LAT: –Is requirements compliant –Has been appropriately tested at lower levels of assembly –Passes comprehensive systems test –Pre-test analyses complete –Environmental Test plans and procedures complete –Facilities readiness and certification verified –STE and MGSE complete, fabricated, and ready for use –Manpower is sufficient to cover all planned for activities

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 3 Requirements compliant All flight system design analyses have been successfully completed and demonstrate adequate margin –Mission System Spec  433-SPEC-0001 Stiffness, mass, stability –LAT-SC Interface Requirements Spec  433-IRD-0001 –LAT Environmental Requirements Spec  LAT-SS Design and Test loads –LAT Performance Verification Plan  LAT-MD c Verification test definition

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 4 Requirements compliant Requirements / Design Update, i.e. Changes since CDR –Shear Plates added at CAL-Grid interface to address slippage concerns Added mounting bosses to the Grid for Shear Plate mounting Modified EMI Skirt pieces to accommodate Shear Plate mounting to the Grid Removed corner tabs from CAL base plate Rationale: friction alone is not a good way to ensure no slippage. Tight mechanical fit via liquid shims solves this problem Approved: Documented in LAT-TD , Section 3 & 5A –Finalized Radiator Mount Bracket Rationale: Thermal distortion of radiators could induce high stresses in RMB. Stiffness of RMB reduced in X-direction to minimize thermally induced stress Approved: Documented in LAT-TD , Section 5C –ICDs updated and approved –Resultant changes to verification matrix incorporated and approved

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 5 Requirements Compliant Current calculations for system performance are fully compliant with requirements Completed analysis of current design demonstrate adequate margin for mechanical loads and stress from handling, test and flight environments

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 6 Requirements Compliant

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 7 Appropriately tested at lower levels of assembly LAT Instrumentation Plan  LAT-TD –Flight and ground instrumentation defined LAT Dynamics Test Plan  LAT-MD –Sine Vibration, Acoustic, and Mass Properties tests described All lower level flight system verification activities have been satisfactorily completed and all discrepancies are sufficiently understood to warrant proceeding –Engineering Test Unit testing since CDR are documented and the design reflects the results Coupon Tests –Insert pullout and shear strength (keensert, helicoil, potted inserts, bare threads) –torque to preload ratios – Flight-like coupon tests –Grid wing corner –Grid EM1X4 Stiffness Verification Test  Complete  LAT-TD – CAL EM Vibration Test  Complete  LAT-TD TKR EM Vibration Test  Complete  LAT-TD SC Flexure Strength and Stiffness test  Complete  LAT-TD

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 8 Appropriately tested at lower levels of assembly (cont.) –Subsystem tests ACD Static, Dynamic and Modal Test  Complete Flight-Spare Grid4X4  Complete –Strength Test  Complete  LAT-TD –Static Stiffness Test  Complete  LAT-TD –Dynamic Stiffness Test  Complete  LAT-TD Radiator Tests –Acoustic Test  Complete –Static Test  NOT COMPLETE  To be performed at NRL prior to LAT acoustic »Test Plan  LAT-TD »Test Procedure  LAT-TD-08118

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 9 Appropriately tested at lower levels of assembly (cont.) Notable fabrication discrepancies and resolution –TKR EM Tower failure and other anomalies Numerous issues were uncovered during the post-CDR development of the tower. These issues are all documented on the TKR website: – Some anomalies include: Sidewall fastener torque, stress corrosion cracking concerns, pitch adapter failures, wire bond failures, bias circuit delamination –Shear plates are held in place by a captive stud and nut. The original nut manufacturing caused galling which could lead to stud failure. Resolution: do not remove defective nuts unless necessary. If necessary, split nut to preserve stud. –EBOX SIU RAD750 EEPROM failure – root cause determined to be substandard chip underfill

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 10 Passes comprehensive systems test Initial flight system comprehensive performance testing has established a valid performance baseline that complies with requirements Composition of test and results

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 11 Pre-test analysis Analyses used to develop test plans are complete Sine Vibration Pre-Test Analysis  LAT-TD –Frequency response analysis complete –Estimated notching calculations complete –Spreadsheets for real-time data reduction complete Acoustic Vibration Pre-Test Analysis  LAT-TD –Acoustic analysis in test configuration complete –Spreadsheets for real-time data reduction complete Mass Properties Pre-Test Analysis  LAT-TD –Mass properties spreadsheet with latest measured data complete –Spreadsheets for real-time data reduction complete

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 12 Pre-test analysis Pre-test analysis example results Peak acceleration response Specification Input Acceleration Notched Input (notch below 50Hz) Peak acceleration response Specification Input Acceleration Notched Input (notch below 50Hz)

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 13 Environmental Test Flow The mechanical tests, highlighted in red boxes, are part of the environmental test sequence, shown below (see LAT-MD ): Final Pre-TV Sine Vibe L Mount Radiators Acoustic L T-CycleT-Bal Remove Radiators Weight CG Ship to Spectrum C L L Receive, Unpack T L Pack LAT CSSCS Baseline FCS at SLAC Ship to NRL L LL Pre Post-Axis L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E TCS Functional Test EMI/EMC Emissions/Susceptibility Test L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E LAT Functional and FSW Test TCS Functional Test EMI/EMC Emissions/Susceptibility Test F NRL Post-Ship C EMI/EMC L E L TESTING IN THERMAL VAC CHAMBER

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 14 Environmental Test plans and procedures Planning is adequate for all mechanical environmental tests –A comprehensive environmental test sequence at appropriate exposure levels is planned that will complete all remaining required verification activities Protoflight Sine Vibration Test Procedure –LAT-TD Protoflight Acoustic Vibration Test Procedure –LAT-TD Mass Properties Test Procedure –LAT-TD Adequate systems performance testing is planned during and between environmental exposures so as to ensure adequate functionality or uncover any deviations Adequate testing for primary and redundant elements is planned

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 15 Facilities readiness and certification Facility readiness reviews have been completed Resultant actions are on track for timely completion Handling equipment and test quipment are qualified and ready for use. Contamination control plans and required equipment are in place and compliant with requirementsIntegrated LAT testing is scheduled at NRL All mechanical test laboratory equipment calibration is current The test facilities are fully certified

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 16 Manpower Remaining activities –Complete Radiator Strength Test Procedure and Execute Test –Complete all Test Procedures based on completed Pre-test analysis and Test Plans –Hold TRR for Mechanical Tests Available resources –John Ku –Marc Campell –Mark Molini –Jim Haughton –Bob Haynes –Bill Raynor –Paul Baird –Chris Fransen

GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 17 Readiness Statement Work to be performed prior to environmental test –Complete Test procedures  May 19, 2006 –Hold Test Readiness Review  May 19, 2006 –Caveat: Radiator proof test will be performed some time during environemental test, i.e. prior to radiator integration at NRL (environmental test readiness is not affected by completion of the radiator static strength test) Pending completion of the above items, the integrated LAT will be ready to enter mechanical environmental tests to complete all remaining required verification activities