QCD = Value RACI Making Roles and Responsibilities Stand Out John Crager IDIS-434.

Slides:



Advertisements
Similar presentations
Student Job Centre 2012 Resume Writing. Student Job Centre Rules of Resume Writing 1.Relevance - make your resume relevant Read the job posting.
Advertisements

RACI chart overview.
Roles and Responsibility Mapping Methodology No. M4 August, 2000.
Art of Delegation in a USPS Setting Page 1 Accountable Inform Responsible Consult.
1. Set expectations and measure performance ◦ What employees are expected to do for their organization in return for pay and benefits ◦ Allows employees.
Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Managing Current Records - Registry
Delegation Skills.
Performance Development Plan (PDP) Training
McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc. All rights reserved
Introduction to SAP R/3.
Managing Large Classes with Group Work
JOB ANALYSIS AND HUMAN RESOURCE PLANNING
This project is financed by the European Union 1 The project is implemented by a European Profiles S.A. led consortium TNA METHODOLOGIES By Senior Sort.
Annual Review Process Georgi Lowe UWSA Office of Human Resources & Workforce Diversity.
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Purpose of the Standards
Chapter 7 Administration of the Fire Department
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
Release & Deployment ITIL Version 3
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
What is Business Analysis Planning & Monitoring?
Effective Methods for Software and Systems Integration
Chapter 8 Sport Management
Team Skill 1 Analyzing the Problem Business Modeling (6) 1.
CS 4310: Software Engineering
Pulaski Technical College Committee Training August 11, 2014.
Define the problem to be solved. Measure the current performance. M.
Simple Process Mapping Techniques
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Conservation Districts Supervisor Accreditation Module 9: Employer/Employee Relations.
Human Resource Management – MGT - 501
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 8 Project Resource Management Resource Planning.
RACI Charting Roles and Responsibilities Anal Prob ol v5.ppt RACI Overview The purpose of the RACI process is to answer the following questions...
Basic of Project and Project Management Presentation.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Information Technology Project Management
Facilitation Principles and Techniques. 2 The Inside Facilitator Authorized by the Project Champion Invites project team members Announces the facilitator.
Georgia Institute of Technology CS 4320 Fall 2003.
Participate in a Team to Achieve Organizational Goal
RESPONSIBILITY CHARTING
Essential Knowledge 1. Planning?  A process for getting work done—a custom to-do list (no two plans are alike)  A blue print for growth and a road map.
Successfully Conducting Employee Performance Appraisals Wendy L. McCoy Director HR & Benefits Florida Conference of The United Methodist Church.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Delegation Skills. Objective Explain What is Delegation Explain Why People Do Not Delegate Describe the Benefits of Delegating List What Tasks Should.
Purchasing Forum – May The integration of the activities, plans, attitudes, policies, and efforts of the people of an organization working together.
Job Analysis. The process of collecting and organizing information about jobs performed in the organization and the principle elements involved in performing.
DELEGATION DELEGATION Doing It Right Our Objectives To delegate patient care task safely & appropriately To understand laws & regulations affecting.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
Management, Supervision, and Decision Making Chapter 2.
WILY MANAGER Just-in-Time Management Advice RACI Analysis Responsibility Charting.
Team Contracts We can work together! Copyright © Texas Education Agency, All rights reserved. 1.
“Plan the work. Work the plan.” ~ Old Saying
Resume Writing.
Prepared by: Miss Samah Ishtieh
Systems Analysis and Design
Teams What is a team? Maintaining Focus
Art of Delegation in a USPS Setting
Delegation Skills.
Wily .com.
HOW TO AUDIT AND TAKE AN AUDIT
PowerPoint Presentation to Accompany Chapter 8 of Management Fundamentals Canadian Edition Schermerhorn  Wright Prepared by: Michael K. McCuddy Adapted.
5-3 Organizational Structure for Businesses
Presentation transcript:

QCD = Value RACI Making Roles and Responsibilities Stand Out John Crager IDIS-434

QCD = Value What Is RACI ? RACI charting is a systematic and highly participative technique to: Identify all functions (activities, tasks, and decisions) that have to be accomplished for the effective operation of the team/organization Clarify roles and responsibilities in relation to each of the identified functions/activities Develop sound methods for defining how individuals can best fill these roles

QCD = Value RACI is Disciplined The individual who is ultimately accountable (includes yes/no and power of veto). Only one “A” can be assigned to an activity/decision. Individuals who perform an activity — responsible for action/implementation. The degree of responsibility is defined by the accountable person. R’s can be shared. The individuals to be consulted prior to a final decision or action is taken. Two-way communication. The individuals who need to be informed after a decision or action is taken. One- way communication. Functions/Decisions/ Activities Roles of Participants R R R R A A A A A I I I I C C C C C Type or Degree of Participation A ccountable “Buck Stops Here” R esponsible “Doer” I nformed “FYI” C onsulted “In the Loop”

QCD = Value Where RACI Helps –Undefined/unclear accountabilities of individuals or departments –Redundancies or work being delayed or not accomplished –Inadequate communication and/or coordination –Approval/decision-making roles unclear and multiple decision points –Tasks being performed/decisions being made at wrong levels –Inability to manage organizational interfaces (Infighting and finger-pointing.)

QCD = Value The Four-Step Process Step 1 Step 2 Step 3 Step 4 — Determine the activities/decisions — Prepare a list of participant roles — Develop the RACI chart — Get feedback and buy-in

QCD = Value Step 1: Determine Activities  Process Mapping  Work Flow Analysis  Functional decomposition  Interviews  Present Situation/To Be’s  Job descriptions  Organization charts  Should it be performed at all; any value added?  What is significance or impact?  Is it duplicated elsewhere?  How often is it performed?  Is it performed at proper skill level? Sources for IdentificationWhat Are They?Analyzing Them  Identifiable  Controllable  Practical

QCD = Value Guidelines for Developing a List Avoid trivial or generic activities, e.g., “attend meetings.” Each activity or decision should begin with a good action verb. Evaluate Record Schedule Write Operate Plan Update Monitor Prepare Collect Develop Inspect Train Authorize When the action verb implies a judgment or decision (e.g., evaluate, monitor, inspect, review), add a phrase to indicate the primary outcome. Examples: “Monitor phone service handling of customer requests to identify training needs.” “Analyze data to locate source of delay.” Activities or decisions should be short, concise, and apply to a role or need, not to a specific person.

QCD = Value Step 2: List Roles Business Other Clerks Other Admin. Clerk Purchasing Organization Roles can be individuals, groups, or entire departments Roles can include people outside the department or even outside the company if appropriate SupplierOur OrganizationCustomer

QCD = Value Step 3: Develop the Chart R1R1 R2R2 R3R3 R4R4 R5R5 R6R6 ARRCT1T1 ARCIT2T2 IARRT3T3 RCAIT4T4 ARIT5T5 Participant Roles Activities or Tasks / Decisions

QCD = Value Complete and Review Horizontal Analysis: Completing All Functions No/too many R’s No/too many A’s Missing A’s or R’s Every box filled in Too many C’s Too many I’s R R R R A A A A A I I I I C C C C C R R R A A A A I I I C C C C Vertical Analysis: Defining Individual Roles Too many R’s for any one role Too many A’s Not any R’s or A’s No spaces in columns Qualifications needed to do the assigned roles

QCD = Value Vertical Analysis If You FindThen Ask Can or need the individual stay on top of so much? Can decisions/activities be broken into smaller, more manageable functions for others to perform? Does the individual(s) need to be involved in so many activities? Are they a “gatekeeper” or could management by exception principles be used? Can C’s be reduced to I’s, or left to the individual’s discretion when something needs particular attention? Should this functional role be eliminated? Have processes changed to a point where other resources should be reutilized? Does a proper “segregation of duties” exist? Should other groups/people be accountable for some of these activities to ensure checks and balances and accurate decision making throughout the process? Is this a “bottleneck” in the process — is everyone waiting for decisions or direction? Does the type or degree of participation fit the qualifications of this role? Too many R’s Qualifications Too many A’s Not any R’s or A’s No spaces in columns

QCD = Value Horizontal Analysis If You FindThen Ask Is the job getting done? Some roles may be waiting to approve, be consulted, or informed. No one sees their role as taking the initiative. Is this a sign of sending it “over-the-wall”? “Just get it off my desk ASAP!” Why not? There must be an “A.” Accountability should be pushed down to the most appropriate level. Is there confusion? “I thought you had it!” It also creates confusion because every person with an “A” has a different view of how it is or should be done. The process must slow down while the activity is performed on an “ad hoc” basis. Or the procedure may be outdated and can be streamlined if not needed. Do all the functional roles really need to be consulted? Are there justifiable benefits in consulting all the roles? Do all the roles need to be routinely informed or only in exceptional circumstances? They shouldn’t be. If they are, too many people are involved — usually too many “C’s” and “I’s.” No R’s Every box filled in Too many C’s Missing R’s or A’s No A’s Too many R’s Too many A’s Too many I’s

QCD = Value More Guidelines 1.A few rules of thumb: Eliminate “checkers checking checkers” Build the chart to encourage teamwork 100% accuracy is usually not essential 2.Place accountability (A) and responsibility (R) at the lowest possible level 3.Authority must accompany accountability 4.Minimize the number of consults (C) and informees (I) 5.All roles and responsibilities must be documented, communicated, and ownership achieved

Task/Activity Strawmodel RACI Chart for Work Order Closure R = Responsible for accomplishing the task/activity C = Consulted with prior to completion of task/activity A = Accountable for the results of the task/activity I = Informed of task/activity/result Perform WO completion procedures as required Perform MOC procedures for WO if required Complete WO Closure and update CMMS Work Request Originator Ops Lead Maint Lead P&S Coord. EngSite Mgt Area Mgt National Coord Maint Tech Ops Tech Materials Coord Review closed WOs for completeness/accuracy A/R R R R Conduct post job reviews of completed WOs Initiate documentation of WO configuration changes Document MOC changes & status in CMMS WO Modify maintenance procedures as appropriate Monitor WO KPIs; Take corrective actions as required C A/R C R I I I II C C A R C I C I