Programming Taija Puolitaival, Department of Construction, Unitec 2014.

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

1.040/1.401 Project Management Spring 2007 Lecture 9 Deterministic Planning Part II Dr. SangHyun Lee Department of Civil and Environmental.
WBS: Lowest level OBS: Lowest level
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Work Breakdown Structures
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Management & Development of Complex Projects Course Code - 706
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Time Management
Importance of Project Schedules
Roberta Russell & Bernard W. Taylor, III
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Planning & Organising two Introduction to WBS Work Breakdown Structure Presenter Tony Bosnich Adapted from Taija Puolitaival Oct 2014 © Unitec New Zealand.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Project Management © Wiley 2007.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Chapter 6 Introduction to Microsoft Project
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Appendix A Project Management: Process, Techniques, and Tools.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Geog 469 GIS Workshop Project Management.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lect. 1 2 nd Semester 2008/2009 UP Copyrights.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
PERT and CPM.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
PROJECT PLANNING AND SCHEDULLING
Programming in BIM environment 1
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
WBS Work Breakdown Structure © Unitec New Zealand.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
PROJECT MANAGEMENT.
Project Planning and Implementation
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
& Urban Planning Civil Engineering Department
CHAPTER 6 PROJECT TIME MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Constraints HARD LOGIC Physical constraints = logical relationship
Chapter 16 – Project Management
CEM 510 Construction Planning & Scheduling Dr Almohawis
LINEAR BALANCE METHOD & MATRIX SCHEDULE
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Presentation transcript:

Programming Taija Puolitaival, Department of Construction, Unitec 2014

Project stages (Scofield and Wilkinson,2010) Taija Puolitaival, Department of Construction, Unitec 2014

 Programme: Agenda, timetable, calendar, list, schedule, to-do-list, plan, rota/roster  Programming Arrange or plan (an event) to take place at a particular time. Make arrangements for (someone or something) to do something. Setting an order and time for planned events Definitions: Programming Taija Puolitaival, Department of Construction, Unitec 2014

 Bar charts  Linked bar charts  Arrow diagrams  Node/Precedence diagrams  Flowline diagrams …… Programming techniques (adapted from Cooke & Williams 2010) CPM Method Taija Puolitaival, Department of Construction, Unitec 2014

 ‘a graphic representation of project activities, shown in a time-scaled bar line with no links shown between activities’ (Mubarak 2010, p. 14)  = Gantt chart, after Henry Gantt 1917 Bar chart Taija Puolitaival, Department of Construction, Unitec 2014

Bar chart Taija Puolitaival, Department of Construction, Unitec 2014

 Easy to create  Easy to understand  Simplicity in general  Time-scaled unlike networks Bar chart -advantages (Hinze 2012, Mubarak 2010) Taija Puolitaival, Department of Construction, Unitec 2014

 Lack of logical representation (relationships)  Not practical for complex projects, unless  You use summary bars  Show just a part of the project:  One subcontractor at a time  Certain section of the project  Certain phase of the project  Not practical for projects with repetitive tasks  Does not show the productivity  Does not show clashes Bar chart -disadvantages (Hinze 2012, Mubarak 2010) Taija Puolitaival, Department of Construction, Unitec 2014

Create a bar chart -slab on ground, 200 m² Excavation Site clearance Reinforcement Pour concrete Formwork Taija Puolitaival, Department of Construction, Unitec 2014

 Line of balance  Time-location matrix  Time-space scheduling  Location-based scheduling  Location-based management  Flowline Linear scheduling = (Andersson & Christensen, 2007) Taija Puolitaival, Department of Construction, Unitec 2014

Simple Flowline Calendar Tasks Locations Taija Puolitaival, Department of Construction, Unitec 2014

Location specific task bars 50 tasks in LOB can be 15,000 tasks in Gantt! 1 task in flowline = 8 in Gantt view Gantt chart vs. location-based Taija Puolitaival, Department of Construction, Unitec 2014

 continuous flow of work through locations  location is free of unnecessary materials and other crews  optimum productivity rates  optimum safety  optimum craftsmanship Linear scheduling -advantages Taija Puolitaival, Department of Construction, Unitec 2014

Activityproductivity rate, metres/day Backfill200 Prepare sub base125 Compact the backfill150 Lay pipe75 Excavation100 Leave a minimum 1 day buffer between the activities LSM for a 1000 m pipeline (Mubarak, 2010) Taija Puolitaival, Department of Construction, Unitec 2014

 Logic diagram Solution, pipeline A BCE D Taija Puolitaival, Department of Construction, Unitec 2014

ActivityDurationStartFinishBuffer A100 1 B83111 C D E Solution, pipeline Taija Puolitaival, Department of Construction, Unitec 2014

Network diagrams/models  = time oriented model of the project with strong emphasis on the order of activities  = network of activity paths Taija Puolitaival, Department of Construction, Unitec 2014

 Arrow diagram = Activity On Arrow = AOA   Node diagram = Activity On Node = AON Network types Taija Puolitaival, Department of Construction, Unitec 2014

 Critical path = which activity path drives the schedule in every project there is at least one  Activities on the critical path = any delay in the start or finish of the activity will delay the entire project Critical Path Method (CPM) Taija Puolitaival, Department of Construction, Unitec 2014

Finding the critical path How many different paths does the network have? How long does each of them take? Which path is the longest? (= Critical Path) Taija Puolitaival, Department of Construction, Unitec 2014

 Shows dependencies  Shows complex interrelationships Benefits of CPM Taija Puolitaival, Department of Construction, Unitec 2014

Project completion date Start and end of a specific activity Coordination among trades and subcontractors Predict and calculate cash flow Improve work efficiency Use as a project control tool Evaluate the effect of changes and prove delay claims Programming (Mubarak, 2010) Taija Puolitaival, Department of Construction, Unitec 2014

1.Determine the work activities 2.Determine activities duration 3.Determine activities relationships 4.Review and analyse the programme 5.Cost/resource allocation 6.Resource levelling 7.Implement the programme 8.Monitor and control the programme 9.Revise the database and record feedback Programming steps (adapted from Mubarak 2010) Taija Puolitaival, Department of Construction, Unitec 2014

WBS / Programme Distinction WBS  Comprehensive classification of project scope  Contains no activity duration  No resource assignments  No dependencies Programme  Actual work to be done (only the activities on the last level of the WBS)  Contains activity durations  Contains assignment of resources to activities  Contains dependencies Taija Puolitaival, Department of Construction, Unitec 2014

Duration of activities  Example:  Excavation of 90 m³  Labour constant (Machine excavation): 0.20 hours/m³  Duration = Total quantity of the activity x Labour constant  Duration = 90 m³ x 0.20 h/m³ = 18 h = 2.25 days = 3 days (Mubarak 2010) When rounding the numbers, always round up to full days. Normal rounding rules don’t apply. E.g days is 3 days, not 2. Taija Puolitaival, Department of Construction, Unitec 2014

Guesstimating vs. Estimating You are not allowed to just guess. If you are not able to access all the information that you need to calculate the durations, you have to use the information that you have got and based on that make an educated guess. Taija Puolitaival, Department of Construction, Unitec 2014

1.Nature of the work/homogeneity 2.Location/floor 3.Size/duration 4.Timing/chronology 5.Responsibility 6.Others = programmer’s mentality in breaking down the project (Mubarak 2010) determining of work activities things to be considered Taija Puolitaival, Department of Construction, Unitec 2014

Quantity Take-off  Construction manager’s point of view - order of the activities - right size activities  how to build the building vs. Quantity surveyor’s point of view - what is the total amount of quantities  how much does it cost to build the building Taija Puolitaival, Department of Construction, Unitec 2014

 Four different types  Finish to Start (FS)  Example: Concrete can not be placed before formwork has been built  Start to Start (SS)  Example: Formwork can not start before trench excavation has started  Finish to Finish (FF)  Example: Landscaping can not finish before the driveway is finished  Start to Finish (SF)  Example: ? Activity relationship types (Mubarak 2010) Taija Puolitaival, Department of Construction, Unitec 2014

Constraints HARD LOGIC  Physical constraints = logical relationship SOFT LOGIC  Resource constraints  Safety constraints  Financial constraints  Environmental constraints  Contractual constraints  Regulatory constraints  Other constraints (Hinze 2008) Taija Puolitaival, Department of Construction, Unitec 2014

 Andersson, N., and Christensen, K. (2007). Location-based Scheduling – Vurdering af LBS- metodens anvendelse i byggeprojekter. Rapport BYG DTU T-167, Danmarks Tekniske Universitet, Department of Civil Engineering, Lyngby.  Cooke, B. and Williams, P. (2009). Construction Planning, Programming and Control (3 rd ed.). West Sussex, UK: John Wiley & Sons.  Hinze, J.W. (2012). Construction Planning and Scheduling. New Jersey: Pearson Education.  Mubarak, S. (2010). Scheduling and control (2 nd ed.). Hoboken, New Jersey: John Wiley & Sons  Scofield, R., Wilkinson, S. (2010). Management for the New Zealand Construction Industry (2 nd ed.). North Shore, NZ: Pearson. References Taija Puolitaival, Department of Construction, Unitec 2014