20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 3. CERN proposal -> in order to minimize the CERN overhead in the work.

Slides:



Advertisements
Similar presentations
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
for a neutrinos factory
Making Sense of the WIC EBT IAPD IAPD Session of the 2014 WIC EBT User Group Meeting July 23, :00 AM to 12:00 PM Presented by Cheryl Owens, MAXIMUS.
Would like to present to you:. Demo Overview Developed an online calendar Meant for small organizations –Efficiency –Communication As well as personal.
Given Connections Solution
Web-site Design Strategy.  For P5, learners need to draw up plans for the evaluation of the website design.  The plans should include consideration.
Design Office meeting Design office meeting.
Condor Technology Solutions, Inc. Grace RFTS Application Extension Phase.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
© 2011 wheresjenny.com Minutes of meeting. © 2011 wheresjenny.com Meeting minutes are the written or recorded documentation that is used to inform attendees.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Database Evidence Eva O’Sullivan. Entering Field Names Once in design view, I entered the field names into the database according to the ‘Data Items List’
Draft Format for an Inventory Report to LRTAP. Why? One important conclusion from the review activities in 2003 and 2004 is that it is difficult to make.
United Nations Statistics Division Registry of national Classifications.
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Compressor status AWAKE Technical Board meeting 19 August 2015.
LHC Quality Assurance Working Group - M. Mottier September 2000.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
VIEWNG SYSTEMS There are two ‘viewing systems’ that we use to visually interpret the world around us. What do you think the two ‘viewing systems’ are?
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Research Administrator’s Forum Danforth Campus May 2006 Presented by: Sponsored Projects Accounting.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Information Within An Organisation Additional Exercise 1 ANSWERS NB. As not whole case study was given some of these answers may not be within the text.
18/07/2005 S. Rangod PH/DT1 1 CNGS HORN Mini-review induced by the break of the insulating glass disk.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Introduction CAD Data Exchange CERN 11 th CATIA FORUM 7 th June 2012 B.Riffaud.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Software Engineering Salihu Ibrahim Dasuki (PhD) CSC102 INTRODUCTION TO COMPUTER SCIENCE.
Minutes of meeting.
A possibility to organize information
Software Project Configuration Management
Michigan Electronic Grants System Plus
VHT SG Report to EC Date: Authors: November 2008 April 2007
Procurement, Measurement and Installation of 2 Octupoles for ATF
Configuration Management and Layout Database ELENA Project
Software Requirements
Current Status Future Progress Monitoring
Friday report Radio Regulations, May 2001 meeting
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
CNGS horn / reflector in 2005: The story of the glass ring insulator
On-Line Certificate System
Technical Communication
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
RAASP DSC Change Management Committee update
Presentation transcript:

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 3. CERN proposal -> in order to minimize the CERN overhead in the work needed for - transfer of information - discussion of technical solutions - detailed drawings - quality control -> in order to resolve the present money problems in the LAL horn project (the original purpose of this meeting) we propose: 1)Supports, fast coupling (C.E.R.) remain LAL responsibility 2)Reflector and Horn-2 assembly/modifications: at LAL 3)Stripline connections and water cooling systems become CERN responsibility 4)Horn-1 modifications: at CERN

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 2 3. CERN proposal

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 3 3. CERN proposal possible schedule ? (following J.E. Campagne, 29 June ’04)

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 4 3. CERN proposal -> “who does what” and quality control Proposal: Use EDMS for documents /drawings / approval processes (sub-folders, user names etc. can be added as required)

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 5

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 6 -> “who does what” concerning the reflector / horn-2 and their modifications Proposal (needs more time for detailed discussion !): (1a) suggested modifications and detailed drawings by CERN (1b) NORM drawings according to IN2P3 standards by LAL (entered into IN2P3 database with all other drawings; HPGL format linked to EDMS (web-link?)) (2a) Identical pieces to be bought / built: order placed by CERN, cost shared by CERN + LAL (e.g. 15 bellows for 2 horns + reflector) 3. CERN proposal

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 7 3. CERN proposal Quality check: - for items ordered by LAL (e.g. reflector inner cond.): J.L. Borne - for pieces built / assembled at LAL: J.L. Borne - acceptance tests before shipment: J.L. Borne + S. Rangod N.B. responsibility for eventual further modifications: CERN to be defined: Tests at LAL Tests at CERN