1 James N. Bellinger 26-Feb-2008 DCOPS DAQ Control Main DAQ Runs on Linux Data directly to Oracle Controlled via DIM Errors presented via DIM PVSS component.

Slides:



Advertisements
Similar presentations
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Advertisements

Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Control and monitoring of on-line trigger algorithms using a SCADA system Eric van Herwijnen Wednesday 15 th February 2006.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 James N. Bellinger University of Wisconsin-Madison CMS Week June 2010 Coordination: Things to do Coordination: James N. Bellinger CMS week 2010.
Scalable Systems Software Center Resource Management and Accounting Working Group Face-to-Face Meeting June 13-14, 2002.
Your Final Project Write an application: Language of your choosing Occupies rest of semester Individual project May NOT be: a work-for-hire for another.
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Umesh Joshi Fermilab Phase 1 Pixel Upgrade Workshop, Grindelwald August , 2012 CMS Pixel & HCAL Databases (An Overview)
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Franco Carbognani, EGO LSC-Virgo Meeting May 2007 Status and Plans LIGO-G Z Software Management.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Root – LHCb Online meeting Eric van Herwijnen Thursday June 14, 2006.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
Source Controller software Ianos Schmidt The University of Iowa.
ProShell Procedure Framework Status MedAustron Control System Week 2 October 7 th, 2010 Roland Moser PR a-RMO, October 7 th, 2010 Roland Moser 1.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
15 Copyright © 2004, Oracle. All rights reserved. Debugging Triggers.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
What is a Laser Mouse? Laser Mouse is a tool that will enable users to control a mouse on a projection screen using a laser pointer. Users will no longer.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
1 James N. Bellinger University of Wisconsin-Madison 30 January 2008 DCOPS Software Report.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
Clara Gaspar, February 2010 DIM A Portable, Light Weight Package for Information Publishing, Data Transfer and Inter-process Communication.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin at Madison
University of Wisconsin at Madison
ICE Monitoring – status 10 February 2010
CERN-Russia Collaboration in CASTOR Development
Systems Design, Implementation, and Operation
University of Wisconsin at Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Presentation transcript:

1 James N. Bellinger 26-Feb-2008 DCOPS DAQ Control Main DAQ Runs on Linux Data directly to Oracle Controlled via DIM Errors presented via DIM PVSS component CMS_ALIGN_ENDCAP_DCOPS Control of DAQ and error monitoring

2 James N. Bellinger 26-Feb-2008 DCS Hierarchy branch CMS_ALIGN CMS_ALIGN_ENDCAP CMS_ALIGN_ENDCAP_ANAL CMS_ALIGN_ENDCAP_DCOPS (*) CMS_ALIGN_ENDCAP_LV

3 James N. Bellinger 26-Feb-2008 DCOPS PVSS Milestones Package fwDCOPS component: Testing Integrated with CMS’ PVSS hierarchy: Testing Install component on CMS machine: at CERN Successful DCOPS control in situ : at CERN Successful generic control by hierarchy : at CERN Successful readback of data w/ final chain : at CERN Package accepted by DCS Non-expert successfully operates panel : at CERN

4 James N. Bellinger 26-Feb-2008 PVSS Controls Time Estimates Package fwDCOPS component: Testing as of 24-Feb Integrated with CMS’ PVSS hierarchy: Testing as of 24-Feb Install component on.CMS machine: XiaoFeng coordinates Successful DCOPS control in situ: Same day as above Successful generic control by hierarchy: Included in above Successful readback of data w/ final chain: Day after successful test above Package accepted by DCS: No idea Non-expert successfully operates panel: Should be easy to find a volunteer

5 James N. Bellinger 26-Feb-2008 Panel In Use Communicating with fake readout at Wisconsin DAQ control buttons DAQ Status area Monitor ports: warn if all DCOPS failed on a port Clickable bars for stations Schematic view of selected station Error display area Reserved for profile displays Two views of transfer DCOPS: 1 for each laser

6 James N. Bellinger 26-Feb-2008 Upgrades Requested Online display of profiles Modify Main DAQ to support profile thumbnails Creation Buffering (present on demand) Space reserved on panel, needs coding No effort is scheduled for this project Expert control interface Turn off/on readout for unused DCOPS Turn off/on writing profiles to database Requires 1-2 days of documentation if we use DID Transfer line display 1-2 days