WP 13 Task 13-2-2. Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes.

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
COsmic Ray Telescope at Orsay (CORTO) Andrii Natochii CORTO team: V. Puill, L. Burmistrov, V. Chaumat, D. Breton, F. Campos, C. Cheikali, J. Maalmi, J.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Aging Study for SiD Hcal and Muon System RPCs (University Linear Collider Detector R&D, project 6.19) Changgo Lu, W. Sands, K. T. McDonald, A.J.S. Smith.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
Report of activities in T1049 (M6-FTBF) Introduction Test beam set-up Preliminary results Conclusions.
Proposal for large-area high- rate Time-of-Flight and Muon Telescope Detector with MRPC technology for EIC Zhangbu Xu (BNL) BNL, Rice, UCLA, Tsinghua,
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
R&D for single gap -Use the HARDROC ASICs, SiGe technology (well tested and available) HARDROC : 64-channel, 2-bin readout (3 comparators, 3 thresholds),
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Micromegas Bulk Demonstrator One type of Bulk: Active area; 115 mm for 288 strips, 500 mm long Material: 100 µm PCB, 5 µm Cu, 18µm mesh, 20µm Mylar Two.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
ASU boards for RPC detectors Production status. Presentation outline Active Sensor Unit electronic board for GRPC detectors – quick reminder – board functional.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.
Construction of RHIC-STAR TOF and high rating MRPC Wang Yi Department of Engineering Physics, Tsinghua University Beijing,100084, China.
14.4. Readout systems for innovative calorimeters
Imad Laktineh IPN-Lyon On behalf of the CMS muon group
E.Bechetoille, M.Dahoumane , I.Laktineh, H.Mathez
RPC with strip readout Last results from test of timing glass
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
Results achieved so far to improve the RPC rate capability
Performance of timing-RPC prototypes with relativistic heavy ions
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
standard THGEM versus FLOWER
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
10/month is the present production rate 2 FTE + sporadic contributions
Conceptual design of TOF and beam test results
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
High time resolution TOF for SoLID
AIDA KICK OFF MEETING WP9
Study of timing properties of single gap high-resistive bakelite RPC
Presentation transcript:

WP 13 Task

Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes  Conception and construction of large detectors  Use of ASIC with small time jitters  Use of TDC (either on FPGA or ASIC built-in) with excellent time resolution  Conception and realization of large PCB  Develop DAQ system  Use different kinds of materials (glass, bakelite, low- resistivity materials) to build the detectors  Test the system with cosmic ray and beam conditions. GOALS

Detector : Good expertise with large single gap RPC Work to develop large MRPC is being pursued ASIC : with time jitters < 25 ps is availble (PETIROC) TDC : with time resolution in the range ps exist (Lyon TDC) Work to build TDC within the ASIC is one of the goals of WP4 PCB with pads and strips adapted impedance are being designed Combination of all pieces to achieve time resolution better than few hundreds ps is the most important challenges

partnerTask/interest IPNLLarge GRPC, PCB, TDC, TB LPCLarge MRPC, PCB GWNULarge MRPC, TB OMEGAASIC LIPLarge RPC, TB INFN-BariLarge RPC, TB

4-year plan 1st yearConception and construction of large RPC/MRPC, Test of PETIROC, TDC 2d yearDesign of optimized PCB for RPC/MRPC, integration of TDC into PETIROC (in collaboration with WP4) 3d yearRealization of a prototype, development of DAQ system ( in collaboration with WP5&WP14) 4 th yearBeam test and validation & final report

 Construction of large size RPC and MRPC Single RPC with large size (1-2 m 2 ) IPNL MRPC (1 m 2 ) GWNU&LPC&IPNL  Tests of PETIROC (32 channels) OMEGA&IPNL A test board is conceived and will be used for this purpose  Test of new TDC IPNL Preliminary tests have been done. Improvement on the TDC performance is expected this year  Study of an optimal PCB for timing LPC&IPNL medium-size PCB were already produced and are under study to obtain better understanding for larger PCB First year plan

IPNLIN2P3(CMS upgrade) + WP4 GWNUNRF OMEGAIN2P3+WP4 LPCIN2P3 LIP ? BARIINFN (CMs upgrade)

1250 mm 1550 mm LIP IPNL LPC GWNU

Jitters < 25 ps Time resolution better than 66 ps OMEGA IPNL

LPC IPNL

Telescope time resolution ~50ps LIP