Voting Protocol – Samples Gas Pipeline Advisory Committee December 17, 2015.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

1 CDBG Citizen Participation For Grant Administrators.
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
36 CFR 218.  Moves projects documented in an Environmental Assessment (EA)/Decision Notice (DN) or Environmental Impact Statement (EIS)/Record of Decision.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
An Overview of Federal Agency Rulemaking Meeting of The Secretary’s Advisory Committee on Human Research Protections October 27, 2008 Christian C. Mahler,
Dr. Carol Clarke Research Staff Officer USDA-APHIS Animal Care
OSEP QUARTERLY CALL WITH PARENT CENTERS PART B FINAL REGULATIONS RELATED TO PARENTAL CONSENT FOR THE USE OF PUBLIC BENEFITS OR INSURANCE Office of Special.
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Accessibility Regulation Scott Windley, PROW Team Leader Dennis Cannon, Transportation Specialist Lois Thibault, Research Coordinator.
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Public Rights-of-Way 1/Accessibility Regulation Lois Thibault, Research Coordinator U.S. Access Board Capital Region Council of Governments Hartford,
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
Liquid and Gas Pipeline Advisory Committees
Assessing the Impact of a Toll-Free Number for Reporting Side Effects in Direct-to-Consumer Television Ads: Proposed Study Design Kathryn J. Aikin, Ph.D.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
February 19, Recent Changes and Developments in USPTO Practice Prepared by: Office of Patent Legal Administration (OPLA) Robert J. Spar, DirectorJoni.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Bulletin Guidance and Resources. BUL Format Provides a table of contents Organizes School Site Council (SSC), Compensatory Education Advisory.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
Federal Data Collection Clearance and Comment Process February 2006.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Presented by: Yolanda Chavez, RN, BSN Policy Rules and Curriculum Development Unit DADS Regulatory Services 1 DADS REGULATORY UPDATE March 2013.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Proposed Regulation for the Measurement of Agricultural Water Deliveries Department of Water Resources Water Use and Efficiency PUBLIC.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 190 NPRM: Administrative Procedures - 1 -
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
UPDATING RIGHT OF WAY MANUALS FLORIDA’S PROCEDURES.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
FACA and Ethics Issues ADVISORY COMMITTEE ON WATER INFORMATION 2006 Annual Meeting - January 18.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Periodic Updates of Regulatory References to.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
1 Mike Israni Senior Technical Advisor Manager: National Standards July 30, 2009.
Rulemaking Process and Cost Benefit Analysis
1 Responding to Comments Janet Cox TMDL/Planning Communications Region 2.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Distribution Integrity Management Program
The simulated plenary session. What you have to do - 6 steps 1.Study the opinion 2.Choose your group (1 student per group), draft and submit amendments.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
Department of Health and Human Services1 Update: October 2006 Public Meeting on Emergency Research Diane Maloney, J.D. Associate Director for Policy FDA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Advisory Committee Voting Protocol Advisory Committee - Voting.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
1 Audit Entrance Conference China May 11, 2004 U.S. Department of Agriculture Food Safety and Inspection Service.
PPIS TRAINING 2017.
Content of Tender Dossier - Instructions to Tenderers - Tenders
Water Quality Standards Submittal & Review Process
An Overview of the Small Business Advocacy Review Panel Process
2017 Amendments to the INCITS Organization, Policies and Procedures
The Rulemaking Process
PPIS TRAINING 2017.
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
AGA Positions on Current PHMSA Rulemakings
What is OAL? The Office of Administrative Law (OAL) ensures that agency regulations are clear, necessary, legally valid, and available to the public. OAL.
A Chronology Tribal Transportation Self Governance Program (TTSGP)
Presentation transcript:

Voting Protocol – Samples Gas Pipeline Advisory Committee December 17, 2015

Proposing a Change The proposed rule, as published in the Federal Register, and the Draft Regulatory Evaluation are technically feasible, reasonable, cost-effective, and practicable if the following changes are made: (members insert language of proposed change). Member(s) should prepare and submit written language to Designated Federal Official (DFO) for insertion. 2

Sample 1: Curb Valve Accessibility for First Responders NPRM Proposed Text: § Manual service line shut-off valve installation. (a)Definitions. As used in this section: Manual service line shut-off valve means a curb valve or other manually operated valve located near the service main or a common source of supply that is accessible to first responders and operator personnel to manually shut off gas flow to the service line in the event of an emergency. 3

Sample 1: Curb Valve Accessibility for First Responders Example Revised Proposed Text (adapted from AGA’s comments): § Manual service line shut-off valve installation. (a)Definitions. As used in this section: Manual service line shut-off valve means a curb valve or other manually operated valve located near the service that is accessible to first responders and operator personnel to manually shut off gas flow to the service line in the event of an emergency. 4

Sample 2: Curb Valve Maintenance NPRM Proposed Text: § Manual service line shut-off valve installation. ***** (c) Manual service line shut-off valves for any new or replaced service line must be installed in such a way to allow accessibility during emergencies. 5

Sample 2: Curb Valve Maintenance Example Revised Proposed Text: § Manual service line shut-off valve installation. ***** (c)Manual service line shut-off valves for any new or replaced service line must be installed in such a way to allow accessibility during emergencies. 6

Sample 3: Notification Documentation NPRM Proposed Text: § Excess flow valve installation. ***** (f)Operator evidence of customer notification. Each operator must maintain a copy of the customer EFV notice for 3 years. This notice must be available for inspection by the Administrator or a State agency participating under 49 U.S.C or

Sample 3: Customer Documentation Example Revised Proposed Text (adapted from 2008 regulations): § Excess flow valve installation. ***** (f)Operator evidence of customer notification. Each operator must maintain a copy of the customer EFV notice for 3 years. This notice must be available for inspection by the Administrator or a State agency participating under 49 U.S.C or <(i) A copy of the notice currently in use; and (ii) Evidence that notice has been sent to the service line customers set forth in paragraph (d) of this section, within the previous 3 years.> 8

Sample 4: Customer Notification NPRM Proposed Text: § Excess flow valve installation. ***** (e) Operator notification of customers concerning EFV installation. *** (1) Except as specified in paragraph (e)(2) of this section, each operator must provide written notification to the customer of their right to request the installation of an EFV within 90 days of the customer first receiving gas at a particular location. 9

Sample 4: Customer Notification Example Revised Proposed Text (from SPPC comments): § Excess flow valve installation. ***** (e) Operator notification of customers concerning EFV installation. *** (1) Except as specified in paragraph (e)(2) of this section, each operator must provide written notification to the customer of their right to request the installation of an EFV within 90 days of the customer first receiving gas at a particular location. 10