Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.

Slides:



Advertisements
Similar presentations
L1 Track Trigger for ATLAS at HL-LHC
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
(ATLAS) Higgs Prospects at HL-LHC. ATLAS CMS ALICE LHCb Center-of-Mass Energy ( ) 7 TeV Center-of-Mass Energy (Nominal) 14 TeV ? Center-of-Mass.
The ATLAS Upgrade Programme Thorsten Wengler ECFA High Luminosity LHC Experiments Workshop 1 st – 3 rd October 2013 Aix-les-Bains, France.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
The ATLAS Upgrade Plan (Preparing for the next 2 Decades of Data) V. Polychronakos, BNL DPF Providence, RI, 9 August, /9/2011ATLAS Upgrade Plan.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Summary of Opening Session Emmanuel Tsesmelis / CERN CARE-HHH-APD Workshop Arcidosso 2 September 2005.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
P. Dupieux (ALICE), A. Cardini (LHCb) M. Abbrescia, K. Hoepfner, A. Safonov (CMS) Ch. Amelung, O. Kortner, S. Veneziano (ATLAS) 4t meeting with the HL-LHC.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
ATLAS Upgrade Report ATLAS Upgrade Report (20/03/12) Planning Assumptions Phase-0 Plans Phase-I Plans - Letter of Intent Phase-II - LoI Planning Conclusions.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Technology and R&D Summary and next steps Burkhard Schmidt.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
Straw man layout for ATLAS ID for SLHC
Rainer Stamen, Norman Gee
L1Calo Upgrade Phase 2 Introduction and timescales
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Machine-Experiment Interface
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
The First-Level Trigger of ATLAS
Presentation transcript:

Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee

5-May Background LHC is designed for running at cm -2 s -1 (at present ~10 30 ) There are plans to increase the luminosity beyond this, to reach an ultimate value of perhaps 5x10 34.This gives an integrated luminosity of 3000 fb -1 by about 2030, starting to be defined as the end of LHC running There is a long programme of work to bring this to fruition In the LHC and its injectors: –LHC collimators, magnet replacements, crab cavities for levelling,… –New Linac; significant modifications to PS, Booster, and SPS –All this in addition to consolidation work in the present LHC In ATLAS (because detectors can’t handle high or accumulated doses): –Additional tracking layer (“IBL”) from ~2015. New inner detector (~2020) –Additional muon chambers to improve P resolution, plus shielding –Replacement of forward calorimetry and all calorimeter electronics

5-May Our strategy !? Phase - 0 Phase - 1 Phase - 2 Int. Luminosity year Shutdown requirements : Phase-0 : months (defined by the LHC consolidation) Phase-1 : 8-9 months (time necessary to install at least the new pixel b-layer) Phase-2 : months to install and debug the new ID detector What are the best dates? When should calo and TDAQ upgrades be done? DESY upgrade week was supposed to identify initial ATLAS preferences Consolidation + new beam pipe - Be ready for ultimate Luminosity - Insert new pixel b-layer - Upgrade various systems for a better and sharper LVL1 trigger Be ready for sLHC New ID + solve LAr end-caps problems L p < =10 34 L p < = L int ~ 1 fb -1 L int ~ 300 fb -1 to 3000 fb -1 L int ~ 50 fb -1 L p ~ From Marzio (added red text by NG)

5-May Norman Gee- TDAQ/Detectors Intro 4 Current Level-1 Hardware Trigger

5-May Norman Gee- TDAQ/Detectors Intro 5 Possible Phase I Level-1 Trigger Under study, not decided !!

5-May Norman Gee- TDAQ/Detectors Intro 6 Possible Phase-II Hardware Trigger Initial ideas, not decided

5-May Norman Gee- TDAQ/Detectors Intro 7 Comment on definition of L1 Latency

5-May Norman Gee- TDAQ/Detectors Intro 8 DESY - Overview Structure Monday – pre-meetings Tuesday - Parallel Wednesday - Plenary (am), Parallel (pm) Thursday - Parallel Friday, Saturday – Plenary Volcano: 171 names registered. I don’t think I saw more than about half this number at DESY in the meetings I attended Many people took part by EVO (at least 40 in some sessions). In general worked well (Nigel’s plenary comment: CERN should take note!). For example, radio headsets for speakers, so that sound quality was much higher with microphone in a sensible place rather than buried in clothes

5-May Norman Gee- TDAQ/Detectors Intro 9 Notes from Presentations Wednesday Plenary: –From initial collision data, particle density per unit eta is slightly higher than highest M/C estimate (Ian Hinchcliffe – see plot below) –No mention of future CERN LHC plans in the only talk from LHC –LHC prefers to run with 50nS bunches at higher luminosity LAr Parallel –R&D is needed to establish if the Rad-hard FADC and high-speed link can be made to work. This is a key issue for upgrade planning –There are development plans for a mini-FCAL insert (diamond technology) covering 3.7 < eta <4.7. Potentially interesting for the trigger

5-May April-2010Norman Gee- TDAQ/Detectors Intro 10 Lar/Tile/L1Calo LAr/Tile/L1Calo Parallel –Deadtime in the LAr system rises with L1 latency and L1 rate. –With 2.5uS latency, deadtime is 2% at 75kHz and 11% at 100kHz. Could perhaps reduce with CTP trigger rationing? Can improve with fewer readout samples –Detailed estimates of latency for digital system. Currently 2.995uS (nb at LAr), needs careful checking –Fine LAr strip data is essential for effective L1Track matching –GBT: Current Latency measurement is 400 nS for zero-length fibre; but believe that this can be reduced to about 250nS (still 10 clock ticks) in ASIC implementations

5-May April-2010Norman Gee- TDAQ/Detectors Intro 11 Plenary The hot TDAQ topic has been the hardware trigger Start to see Monte Carlo simulation results giving justification for trigger upgrades, even at design luminosity –Justification emerging for Phase I Topological trigger, Phase II Track Trigger, MDT-based tracking Excellent survey of latency from Thilo, we now know that there is 18 BC of spare latency in the current system (or perhaps only 10 in the LAr?) –Probably enough for proposed Phase-I Level-1 upgrade –Need to understand how to optimise this vs CTP leaky bucket algorithm

5-May April-2010Norman Gee- TDAQ/Detectors Intro 12 Plenary - Latency Beyond Phase I, we need to find a route through difficult (conflicting) boundary conditions in the hardware trigger –Rates from the existing trigger will eventually get too high –BUT can’t (and must not try to) control this by raising thresholds –Need on-calorimeter digitisation to access fine-grain info, + complete new L1 processor to tackle this, and Track Trigger needs fine-grain info –BUT the L0 latency is very close to Muon system limits, perhaps beyond –Rate from L0A trigger (500kHz?) is probably too high for Muon system –BUT track trigger regional readout scheme needs L0A –Latency of MDT trigger is close to (possibly beyond) 3.2 uS limit –BUT very desirable to leave some spare latency in the system

5-May April-2010Norman Gee- TDAQ/Detectors Intro 13 ROD Development When to Switch from existing ROD spec to a new ROD spec? –Not for IBL –But if LAr goes digital in 2017? Talks on these issues in TDAQ week (but need preparation before)

5-May Specific Issues for L1Calo We need to collect the best latency estimates we can make for all processing stages What is the earliest data we could have different phases of L1Calo ready to use –It is VERY IMPORTANT to define this by ATLAS week in Copenhagen Should we try to build parts of Phase-II early instead of building separate Phase-I?

5-May April-2010Norman Gee- TDAQ/Detectors Intro 15 Comments, questions?