HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19, 2014 1.

Slides:



Advertisements
Similar presentations
MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Advertisements

Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
RF Cavity / Coupling Coil Module
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements and feedback form LARP structure review Ruben Carcagno February 2,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN, 11th November 2011 Hi-lumi meeting
P. Ferracin on behalf of the MQXF collaboration
Resource Loaded Schedule and Budget Profile
HL-LHC Magnet components and assemblies
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Mike Anerella December 17, 2013
Coil Design and Fabrication
Crab Cavities Contribution from the U.S.
11 T Dipole Integration & Plans M. Karppinen
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
QXF schedule and milestones
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,

HiLumi-LARP Annual Meeting November 2014 Outline US-HiLumi Magnets Preliminary: – Scope – Top-Level Schedule – Fabrication Plan – Early US Project Milestones – Summary 2

HiLumi-LARP Annual Meeting November 2014 Preliminary US-HiLumi Magnet Scope Five Q1 Cold Masses (LMQXFA) and Five Q3 Cold Masses (LMQXFB) – Each cold mass includes two ~ 4.8m Nb3Sn magnets (MQXFA) installed in a SS helium vessel with end domes, ready for insertion into a cryostat by CERN 3 MQXFA LMQXFA (Q1) LMQXFB (Q3)

HiLumi-LARP Annual Meeting November 2014 US-HiLumi Magnets Timeline Tentative plan: – Assumes Q1 and Q3 tunnel installation in CY-2024 – Provides 3.5 years for CERN Q1 and Q3 scope (cryostating, test, etc) – Production Coil winding must start in January 2018 (US Critical Decision 3 DOE approval, CD-3) – Two years of preparations needed for strand and series production tooling procurements, start cable fabrication, etc. – Production throughput based on June 2013 MQXF fabrication plan 4

HiLumi-LARP Annual Meeting November 2014 US-HiLumi Preliminary Top Level Schedule Assumes Q1 and Q3 tunnel installation in CY2024 First LMQXFA/B cold mass delivered to CERN summer 2020 Last LMQXFA/B cold mass for tunnel installation delivered to CERN summer 2022 Last LMQXFA/B cold mass spare delivered to CERN summer

HiLumi-LARP Annual Meeting November 2014 Preliminary Fabrication Plan Plan is based on the production plan presented by M. Anerella during the June 2013 DOE review of LARP plus additional information Nb3Sn – First strand delivery one year after placing purchase order. Last delivery 2 years later. A total of 9,400 Kg will be needed for 90 coils Cable and Insulation (LBNL) – Starts three months after first strand delivery – Throughput starts at 2 UL/month, ramping to a peak rate of 3 UL/month – A total of 90 ULs are needed for 90 coils – Insulation by vendor – Total duration ~ 3 years 6

HiLumi-LARP Annual Meeting November 2014 Preliminary Fabrication Plan (Cont.) Coil Fabrication – Two production lines (FNAL and BNL) – Peak rate: 1 coil every 15 working days First two coils in each facility assumed to take twice as long First 4 coils: 8 months after coil production starts – Total duration for 90 coils ~ 3.5 years – Additional tooling needed at each production line to sustain throughput: One additional winding mandrel assembly Two additional reaction fixtures One additional impregnation fixture 7

HiLumi-LARP Annual Meeting November 2014 Preliminary Fabrication Plan (Cont.) Magnet Assembly (LBNL) – Starts ~ 8 months after coil fabrication starts As soon as a set of four coils are delivered – Includes Yoke/Shell structure assembly, coil pack insert assembly, and magnet assembly – Two production lines. In each line, peak rate: 1 coil pack insert every 60 working days 1 yoke/shell assembly every 75 working days (concurrent) 1 magnet assembly every 34 working days – Peak overall rate: 1 magnet every ~ 2.2 months First magnet assumed to take twice as long – Total duration for 20 magnets is ~ 4 years 8

HiLumi-LARP Annual Meeting November 2014 Preliminary Fabrication Plan (Cont.) Magnet Test (BNL) – Test and train each magnet in BNL vertical test stand prior to cold mass assembly Needed quantity under consideration It takes ~ 38 working days for a production vertical test Cold Mass Assembly (FNAL) – Connection of two magnets, installation of stainless steel skin and end domes, heat exchanger, bore tube, etc. – Peak rate: 1 cold mass every ~2 months First assembly assumed to take 3 months Cold Mass Test (FNAL) – Insert cold mass in re-usable cryostat and test cold mass in Fermilab’s Horizontal test stand – Peak rate 1 cold mass test every ~3.5 months First test assumed to take 1.5 times longer, second test 1.25 times longer Assumes no prior magnet training Assumes 30 training quenches per magnet 9

HiLumi-LARP Annual Meeting November 2014 US-HiLumi Early Milestones Frozen Baseline: – Definitive scope – Detailed resource loaded schedule – Time-phased budget – EVMS-ready 10 Baseline must be frozen before March 2016 Earned Value Management System (EVMS) monthly reporting is required six months prior to the independent Director’s CD-2 review, which is required before a DOE CD-2 review EVMS requires a frozen baseline – Changes after baseline freezing require going through a change control and approval process – Monthly Cost/Schedule variances must be explained and corrective actions put in place

HiLumi-LARP Annual Meeting November 2014 Summary Plan is based on Q1 and Q3 tunnel installation in 2024 Q1 and Q3 cold masses delivered to CERN starting in summer 2020 – Last cold mass for tunnel installation delivered summer 2022 – Last spare delivered summer 2023 Plan requires start coil production (DOE CD-3 approval) in January 2018 DOE CD-2 approval needed by ~April 2017 – EVMS monthly reporting must start by March 2016 to support Director’s CD-2 review prior to DOE CD-2 review US-HiLumi project baseline must be frozen before March 2016 – Definitive scope, detailed resource-loaded schedule, time-phased budget, EVMS-ready This is a preliminary plan, more details and analysis needed (e.g., incorporate rework/re-test activities) 11