GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
1 Monitor of Isobutane Content in the RPC Gas Mixture Changguo Lu, Kirk McDonald Princeton University (10/22/2008)
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
1 April 7, 2009 C. Lu Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Characterization And Testing Of 2m X 2m Glass Resistive Plate Chamber Mohammed Salim M Aligarh Muslim University.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Summer Updates- Summer Student Report Emine Altuntas Stephen Fee Supervisors: Mar Capeans, Ivan Glushkov, Roberto Guida Gamma Irradiation Facility.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
The RPC Closed loop Gas System Slides from Bianco and Guida.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
MICROMEGAS General Meeting GAS DISTRIBUTION SHCEMES FOR THE MICROMEGAS DETECTORS OF THE NSW OF ATLAS NTUA T. Alexopoulos, S. Maltezos, S.
Festo in BiotechPharma and Cosmetics
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Gas flow studies on MicroMeGaS Detectors for the NSW Upgrade Stathis K. Karentzos National Technical University of Athens, NTUA HEP 2014 – Conference on.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
The Next Generation of a Gamma Irradiation Facility GIF++
Detector status and commissioning: LUCID
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
CMS gas systems meeting
Aachen Status Report: CO2 Cooling for the CMS Tracker
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
352MHz Klystron Control for the 3MeV Linac test stand
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
EN-CV: P8 systems and Detector Cooling
Aachen Status Report: CO2 Cooling for the CMS Tracker
Presentation transcript:

GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida, E. Regano PH-DT-DI1

 Start-up version: ▫2 mixing racks (cosmic and beam trigger) ▫1 closed loop gas systems (cosmic trigger) ▫2 analysis racks ▫1 control rack 14/1/2015R. Guida, E. Regano PH-DT-DI2 Gas service area Construction procedure/design as for LHC gas systems

Gas system fixed setup 14/1/2015R. Guida, E. Regano PH-DT-DI3 RPC cosmic and TGC beam trigger Connection to gas supply and distribution panels almost completed

Gas distribution panels 14/1/2015R. Guida, E. Regano PH-DT-DI4 Gas mixture distribution: Each distribution panel: 6 supply (outer diameter 8 mm) and 6 return (outer diameter 10 mm). The gas distribution is divided in: ▫ panels for neutral mixtures (type A) ▫ panels for mixtures that might contain flammable gases (type B). Gas service area ▫6 panels type A ▫2 panels type B Irradiation bunker ▫6 panels type A ▫2 panels type B Preparation area ▫3 panels type A ▫1 panels type B Installation completed Commissioning ongoing

Gas detection 14/1/2015R. Guida, E. Regano PH-DT-DI5 Installation ongoing for start up version based on (best guess) Source of potential hazard identified for the start up phase Same exercise need to be done very soon for the final operation: important to collect all info from detector communities Now easier thanks to beam time request New requirements to be submitted by beg-January

Detector Detector volume / Pressure (cm 3 ) / (mbar) Mixture and Concentration (% vol) Gas volume in racks /Pressure (cm 3 ) / (mbar) Total mixture flow (l/h) Required for commissioning fixed installations: Beam trigger TGC 2000 cm 1 mbar CO 2 55 % nC 5 H % (flammable mixture) Liquid nC 5 H cm 3 CO mbar 1 l/h Cosmic trigger RPC cm 1 mbar R134a 94.7 % iC 4 H % SF % (non-flammable mixture) Supply (iC 4 H 10 ): 30 cm 1.5 bar Mixture: 3000 cm 30 mbar 30 l/h Optional for Most probably required from beginning 2015: User CMS-GEM 5000 cm 1 mbar Ar 45 % CO 2 15 % CF 4 40 % (non-flammable mixture) Mixture: 3000 cm 30 mbar 10 l/h User ATLAS/CMS- RPC cm 1 mbar R134a 94.7 % iC 4 H % SF % (non-flammable mixture) Same rack as Cosmic trigger Additional: Mixture: 3000 cm 30 mbar 20 l/h User CMS-CSC cm 1 mbar Ar 40 % CO 2 50 % CF 4 10 % (non-flammable mixture) Mixture: 3000 cm 30 mbar 20 l/h 14/1/2015R. Guida, E. Regano PH-DT-DI6