MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.

Slides:



Advertisements
Similar presentations
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Advertisements

MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Bari Osmanov University of Florida MINERvA: neutrino cross-sections for the future EPS HEP July, Krakow, Poland Bari Osmanov, University of.
Lance Garrison R. Cooper, H.-O. Meyer, T. Mikev, L. Rebenitsch, R. Tayloe, R. Thornton.
Physics Topics in MINER A David Boehnlein - Fermilab for the MINERvA Collaboration Overview of MINERvA The high intensity of the NuMI beamline at Fermilab.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Cost of a Large Solid Scintillator Detector Jeff Nelson Fermilab.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
MINER A (FNAL E938) Gabriel Niculescu, JMU MINERA web site: Miner a Main Injector MINOS Near Detector NuMI Beam Where?  FERMILAB.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
Calibration of the MINOS Detectors Using Stopping Muons Jeff Hartnell University of Oxford & Rutherford Appleton Laboratory IoP Particle Physics 2004 Tuesday.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research Dubna, 25 th January, 2007.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
Experimental Method: 2 independent detectors on both sides of IP
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
IFR Status Summary W. Baldini on behalf of the IFR Group
Baby MIND Status on T9 E. Noah 6th July 2017.
IFR detector mechanics
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
Presentation transcript:

MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009

Reminder: Phase Diagram Deborah Harris AEM August 31, 2009 Construction Installation Calibration And Data Analysis

Construction Status Deborah Harris AEM August 31, 2009

Optical System Deborah Harris AEM August 31, Clear fiber in light-tight optical cables takes light to PMT box Blue-emitting extruded plastic scintillator with a hole for a WLS fiber: Wavelength Shifting (WLS) fiber mirrored, then glued into scintillator “ODU” (Optical Decoder Unit) takes light from optical cable to PMT 100% 85% 83% 90%

Electronics and Data Acquisition Deborah Harris AEM August 31, PMT Bases –All ~550 have been assembled, tested, calibrated, put into PMT Boxes Front End Boards –All 600 have been assembled –450/600 have been tested and calibrated (Pittsburgh) Chain Read-Out Boards, Interface Modules –12/14 CROC’s produced and tested –Interface modules (timing) done DAQ –Windows DAQ ready for commissioning full detector –Working on faster Linux DAQ for final data taking Light Injection System –Ready to flash! 100% 90% 100% 86%

From Scintillator to Detector Modules Scintillator Plane is surrounded by (scintillator-filled) steel frames Total of 116 frames (~93 built) 80 fully active tracking modules (33 built) 2 scintillator 17 mm each 10 ECAL modules (10 built) 2 lead 2 mm each 2 scintillator 17 mm each 20 HCAL modules (20 built) 1 steel 25 mm 1 scintillator 17 mm 5+1 Nuclear Target modules: Pb, Fe, C (all targets here, some assembly required) Deborah Harris AEM August 31,

Critical Path for Completion Deborah Harris AEM August 31, 2009 Scintillator PlanesOuter Detector Towers Fermilab Hampton William and Mary

Installation Status Deborah Harris AEM August 31, 2009

Installation since last AEM… Gabe Perdue showed our first neutrinos 4/6/09 Tracking Prototype (24 module) Data-taking: 4/15/09 to 6/15/09 Repair TP modules and move to side stand: 7/15-8/17 Move “half the detector” on beam stand: 8/17-late October Move rest of detector: January – March 2010 Deborah Harris AEM August 31, 2009

Taking Neutrino Data Deborah Harris AEM August 31, 2009

July 13, ready for repairs Deborah Harris AEM August 31, 2009

August 17, starting to reinstall Deborah Harris AEM August 31, 2009

Today, installing Deborah Harris AEM August 31, 2009

Lessons Learned from TP run (the dirty laundry slide) Be prepared for adverse weather conditions Be prepared to write out every buffer, no more no less Beware of cross-talk from wayward cookies Deborah Harris AEM August 31, 2009

Calibration/Analysis Status Remember: April 6 AEM Deborah Harris AEM August 31, 2009

MINERvA Sees! Took ~4 x10 19 POT April 15-June 15 15k events, publishable physics there Exclusive Channel reconstruction Following are real data events… Candidate reaction given below Deborah Harris AEM August 31, 2009  +n→  - +   +  +  +n→  - +p e +n→ e - +p p     p e

More interesting events… Events from steel target located 10” upstream of tracker modules Deborah Harris AEM August 31, 2009 Neutral and charged current events on Lead Photo-electron Scale: Notice “slice”!

Muon Spectrometer Performance Otherwise known as MINOS Near Detector Commissioning with beam since 2005… Deborah Harris AEM August 31, 2009 All tracks in MINER A (red) and MINOS (black), in MINER A coordinate system and MINER A Data Summary Tape

Track Matching between MINER A and MINOS Deborah Harris AEM August 31, 2009 Residuals (MINER A-MINOS) of Track Projections to front face of MINOS Near Detector Black: momentum of events with tracks in MINOS and MINER A Red: momentum of tracks with residuals <20cm <3GeV >3GeV

Argoneut Effect on Momentum Deborah Harris AEM August 31, 2009 Argoneut currently sits between MINER A and MINOS, intersecting ~50% of the muons in our dataset 2100 kg over 3m 2, very complicated geometry Average energy loss through Argoneut: 108 MeV, RMS of 200MeV Hard to measure muon momentum for half our   charged current events because of this during Spring ‘09 run Working to find solution for next run

Possible Solutions Do nothing –Compromise 50% of muon momenta measurements Move Argoneut 2.5’ to the side –Small loss in Argoneut Acceptance –Compromise 15% of muon momenta –3 days of mechanical technician crew –2 weeks of cryo technician Move Argoneut upstream of MINER A –Space upstream of MINER A for cryogenic target –MINER A provides tracking data to Argoneut –Liquid He target not here till Fall of 2010 Deborah Harris AEM August 31, 2009

Will soon enter the 4 th Phase Data-taking with ~half the detector (11/09 - 2/10) Construction forecast to end 1/10 Data-taking with full detector starting 3/10 On schedule and budget, thanks to your support! Deborah Harris AEM August 31, 2009