The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

The Importance of ILC Communications Barry Barish Communications Workshop VLCW06 17-July-06.
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
News from the ILC Barry Barish Users’ Meeting Fermilab 9-June-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Personal Perspectives on the ITRP Recommendation and on the Next Steps Toward the International Linear Collider Barry Barish PAC Annual Meeting Knoxville,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Strategies for Future Acclerators Barry Barish Elba 23-May-06.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
Report from the GDE Barry Barish ACFA Workshop EXCO, Daegu, Korea 11-July-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
Concluding Remarks Dongchul Son Center for High Energy Physics Kyungpook National University.
20-Jan-09 Madrid, Spain Global Design Effort 1 Barry Barish Madrid, Spain 20-Jan-09 Designing the ILC ATF-2 Final Doublet System.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Report from ILCSC Shin-ichi Kurokawa KEK ICFA Seminar Daegu, Korea September 29, 2005.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Opening Remarks: ICFA and Governments Presented at Special Evening Forum By Jonathan Dorfan.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
7-March-07 ILC-fest Fermilab Global Design Effort 1 International Linear Collider Barry Barish 7-March-07.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Report from the GDE Barry Barish ACFA Workshop EXCO, Daegu, Korea 11-July-05.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
9/17/041 The International Linear Collider Michael Witherell Presentation to The Funding Agencies for a Linear Collider September 17, 2004.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
The International Linear Collider Barry Barish ANL Colloquium 3-Jan-06.
Welcome Address Shin-ichi Kurokawa KEK ILCSC Chair International Accelerator School for Linear Colliders Hayama, Japan May 20, 2006.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Global Design Effort
The International Linear Collider
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
International Cooperation in High Energy Physics
Presentation transcript:

The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05

22-July-05 HEP Barish 2 International Technology Review Panel

22-July-05 HEP Barish 3 The ITRP Recommendation We recommend that the linear collider be based on superconducting rf technology –This recommendation is made with the understanding that we are recommending a technology, not a design. We expect the final design to be developed by a team drawn from the combined warm and cold linear collider communities, taking full advantage of the experience and expertise of both (from the Executive Summary).

22-July-05 HEP Barish 4 The SCRF Technology Recommendation The recommendation of ITRP was presented to ILCSC & ICFA on August 19, 2004 in a joint meeting in Beijing. ICFA unanimously endorsed the ITRP’s recommendation on August 20, 2004

22-July-05 HEP Barish 5 Starting Point for the GDE Superconducting RF Main Linac

22-July-05 HEP Barish 6 The Community then Self-Organized Nov 13-15, 2004

The Global Design Effort Formal organization begun at LCWS 05 at Stanford in March 2005 when I became director of the GDE Technically Driven Schedule

22-July-05 HEP Barish 8 GDE – Near Term Plan Schedule Begin to define Configuration (Aug 05) Baseline Configuration Document by end of Put Baseline under Configuration Control (Jan 06) Develop Reference Design Report by end of 2006 Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report

22-July-05 HEP Barish 9 Snowmass Workshop – Aug 2005

22-July-05 HEP Barish 10 Snowmass – GDE Takes Over

22-July-05 HEP Barish 11 Key Near-Term Design Choices Accelerating Gradient Positron Production mechanism Design of Damping ring Site-specific considerations: One or two tunnels? Shallow or deep?, etc Total cost will be a key determining factor in our ability to get the ILC built. Therefore cost optimization of all systems is of primary importance

22-July-05 HEP Barish 12 Accelerator Physics Challenges Develop High Gradient Superconducting RF systems –Requires efficient RF systems, capable of accelerating high power beams (~MW) with small beam spots(~nm). Achieving nm scale beam spots –Requires generating high intensity beams of electrons and positrons –Damping the beams to ultra-low emittance in damping rings –Transporting the beams to the collision point without significant emittance growth or uncontrolled beam jitter –Cleanly dumping the used beams. Reaching Luminosity Requirements –Designs satisfy the luminosity goals in simulations –A number of challenging problems in accelerator physics and technology must be solved, however.

22-July-05 HEP Barish 13 Three concepts under study Typically requires factors of two improvement in granularity, resolution, etc. from present generation detectors Focused R&D program required to develop the detectors -- end of 2005 Detector Concepts will be used to simulate performance of reference design vs physics goals next year. Detector Concepts and Challenges

22-July-05 HEP Barish 14 Remarkable progress in the past two years toward realizing an international linear collider: important R&D on accelerator systems definition of parameters for physics choice of main linac technology start the global design effort funding agencies are engaged  Many major hurdles remain before the ILC becomes a reality (funding, site, international organization, detailed design, …), but there is increasing momentum toward the ultimate goal --- An International Linear Collider. Conclusions