M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
March 24th 2010MICE CM26 - Riverside1 Beam Line Paper m. apollonio – Imperial College.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Walaron Diagnostics MICE Collaboration Meeting Berkley 9/2/ Beamline Diagnostics Kenny Walaron University of Glasgow / RAL.
M.apollonio/j.cobbMICE UK meeting- RAL - (9/1/2007) 1 Single Particle Amplitude M. Apollonio – University of Oxford.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Edwin Chng. Contents Decay Solenoid Electron Peak Muon Peak Slab Hits Appendix Slide 2.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
26 Oct 2010PC Physics Requirements of Software from Chris R ~19 Oct. My.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
Mark Rayner – Analysis SessionCM25, 4 November Beam characterization by the TOFs Mark Rayner The University of Oxford MICE CM25.
Mark Rayner 26/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Measuring emittance with the TOFs Data: –G4MICE has been used to obtain transfer.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
Mark Rayner – Analysis SessionCM25, 4 November The TOF detectors: Beyond particle identification Mark Rayner The University of Oxford MICE CM25.
(one of the) Request from MPB
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE Operations Scenario Run 1
MICE: First Beam Emittance Results w/Particle Detectors
Luminosity Monitor Status
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
MOM Report + RUN PLAN m. apollonio – Imperial College
Presentation transcript:

m. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …

7/7/2010CM27 - RAL22 what a summer …  target dips into ISIS …  particle triggers  1500 runs  16 hours shift rotas  MOMs  BLOCs  experts  and to finish with …  … fireworks at 10V ! VERY IMPORTANT: system was really stable, reliable And it looks like data are in good shape

7/7/2010CM27 - RAL3 The MICE Beam-Line

7/7/2010CM27 - RAL4 (x0,y0)(x1,y1) M: transfer matrix Infer x0’ and x1’ from x0,x1 Reconstruct: - P - phase space - Twiss Parameters - emittance TOF0 and 1 play a crucial role in this analysis TOF (0,1,2)

7/7/2010CM27 - RAL5 OnLine Phase Space Reconstruction Beam Line Online Tuning Tried also an OL optimisation (very slow)

7/7/2010CM27 - RAL6 Analysis - Commissioning and calibrating the beam line detectors a)Luminosity Monitor b)TOF0, 1, 2 / CKOVa, b c)FermiLab Beam Profile Monitors - Commissioning the BL magnets - determine the (e,P) matrix - compare data to simulation - Beam rate vs Target Depth Procedure: - data taking campaign at many different optics - mainly scan of quadrupoles/triplets to study the effect on ph-space - scan of DS - monitoring of main scalers / detectors (TOFs) - Use of Reference Runs to monitor optics stability - mu- / mu+ configurations

DS scan [E. Chng, IC] DS current reference at 669 Amps(run 2200) DS current varied from -15% to +20% TofTree and TofTrace ran on data to extract mean of x,y and the spread of the beam (σ) at TOF1 Run Number Current / Amps Ref. Current 7/7/2010CM27 - RAL7

7/7/2010CM27 - RAL8 Beam Characterization [M. Rayner] - Cumulative spectrum of Dt - Comparison Feb./Aug. TOF Calibrations - Change in shape due to TOF0 Partially “blind” & BL dispersion e-/e+ peak monitoring - position & width should be stable

7/7/2010CM27 - RAL9 Few points: - a shift in calibration (10 ps) between Feb. and Aug. - RMS nearly constant: 120 ps ≠ (60 ⊕ 50) - so we are not exploiting the full potential of TOFs resolution

7/7/2010CM27 - RAL10 M.R. Feb. calibration Aug. calibration E.C. Same pattern, shift of 0.5 ns due to wrong calib file used (debugging now) E.C. gauβ fit To e- peak

7/7/2010CM27 - RAL11 Beam Characterization [R.R.Fletcher] - Neutral Particles responsible for an apparent Trigger inefficiency BL+ with D2=0 BL+ with D2 ON

7/7/2010CM27 - RAL12 Beam Characterization [A.Dobbs] - Adam had a chance at 10 V … and he did not miss it! - soon in a MICE-note

7/7/2010CM27 - RAL13 Quadrupole Scan(s) [S. Blot] Q789 (- / +) and Q456 (+) I(triplet) = 050% to 175% of the nominal value See effect on beam profiles and phase space

7/7/2010CM27 - RAL14 Q789 (-) G4BeamLine DATA

7/7/2010CM27 - RAL15

7/7/2010CM27 - RAL16

7/7/2010CM27 - RAL17

7/7/2010CM27 - RAL18 MC (G4Beamline) DATAM Phase Space study for some Matrix Points

7/7/2010CM27 - RAL19 MC (G4Beamline) DATAM

7/7/2010CM27 - RAL20 DATA M G4Beamline P=[200,210] P=[210,220] P=[220,230] P=[230,240] P=[210,220] P=[220,230] P=[230,240] ??? This result is in disagreement with what found previously … needs some investigation

7/7/2010CM27 - RAL21 Many matrix points have been produced which need to be analysed In particular for (6,200) we have: M0 (starting optics) M1 (GA optimisation) M2 (Minuit Optimisation)

7/7/2010CM27 - RAL22 A small army is fighting through the data My apologies if I forgot some name) I am sure more want to be involved. Good agreement DATA vs G4BeamLine (apart from the last result shown) BUT still a lot of work - Many people involved in the analysis of these data (MA, SB, CR, MR, EC, …) -We need - to analyze DATA and produce simulations for … 1500 runs ! (surely less than that but quite a number) -TOF0-1 distance CRUCIAL for P and ph-space reconstruction - At present we could be wrong by cm - TOF0,1 exact location? - survey in due course

7/7/2010CM27 - RAL23 Homework for the 6 months to come - Complete the analysis of the JUL-AUG campaign - Understand how well we can predict the beamline M. Littlefield is modeling the entire beamline in G4MICE Interesting project: should help us understand TOF PH-SPACE reconstruction

7/7/2010CM27 - RAL24 The end

7/7/2010CM27 - RAL25 STEP I - Commissioning and calibrating the beam line detectors a)Luminosity Monitor b)TOF0, 1, 2 / CKOVa, b c)FermiLab Beam Profile Monitors - Commissioning the BL magnets - determine the (e,P) matrix - compare data to simulation -

7/7/2010CM27 - RAL26 Layout - Goals for STEP I - MICE Beam Line - detectors - DAQ - Beam Characterization - data taking campaign - Tracker for the next phase - Software

7/7/2010CM27 - RAL27 Luminosity Monitor - Particle Rate close to Target point - PoT as function of Target Depth (independent from BLMs) - installed in the ISIS vault and commissioned - coincidence to reduce spurious counts - correlation LM vs BLM