1 Heinz Pernegger / LHCC 16/11/10 IBL TDR : Questions and Answers H. Pernegger / CERN on behalf of the IBL collaboration.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Slides for Jörn Talk IBL Sensor Review Kick-off Meeting CERN, May,
1 Module and stave interconnect Rev. sept. 29/08.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
Annual Meeting WP2- Sensors Heinz Pernegger / CERN 20 November 2013.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Alice overview New detector and chamber ALICE TC.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Straw man layout for ATLAS ID for SLHC
IBL Technical Aspects H. Pernegger / CERN.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
LumiCal mechanical design, integration with LDC and laser alignment
Design and fabrication of Endcap prototype sensors (petalet)
Update on ATLAS insertable B-layer
Presentation transcript:

1 Heinz Pernegger / LHCC 16/11/10 IBL TDR : Questions and Answers H. Pernegger / CERN on behalf of the IBL collaboration

2 Heinz Pernegger / LHCC 16/11/10 Answers to questions We would like to thank the LHCC and reviewers for their time dedicated to the careful reading of the TDR. We give today a preliminary answer to most of the questions We have prepared a (nearly complete) draft document which summarizes our answers: ATU-GE-MR-0017 – The answers to a few questions we have to report at a later time, as tests are ongoing now.

3 Heinz Pernegger / LHCC 16/11/10 Analysis of W(H→bb) with IBL (Q 2-2) extension of IBL performance studies presented in TDR ➡ control effects of 2*10 34 cm -2 s -1 pileup on all aspects of analysis examples: ➡ jet-jet invariant mass resolution and jet veto against top ✓ new pileup noise correction recovers jet energy resolution ✓ so-called “Jet-Vertex-Fraction” allows to recover jet veto main backgrounds in WH analysis contain charm jets ➡ both in top events and as well in W+jets ‣ gain in charm and light rejection is important for significance ➡ developed special charm tune of ATLAS “JetFitter” tagger for IBL ✓ IBL improves charm rejection significantly compared to ATLAS cluster merging limits b-tagging in boosted H→bb jet(s) ➡ problem in Pixel clustering software identified ➡ Pixel Clustering Task Force in place ‣ goal is to have new clustering software in place for release 17 ‣ in time for February reprocessing of 2010 ATLAS data ‣ and will then be used for further IBL studies no pileup 2 clusters merged

4 Heinz Pernegger / LHCC 16/11/10 FE-I4 V1 chip received (Q 3-2, Q 11-1) FE-I4 Production 3 wafers received 27/9 7 more wafer expected by (2/12) - foundry is full: our production delayed 6 more held back One wafer partially diced 6 chips put on boards All 6 worked well First wafer fully probed Module qualification program has started IZM has started with FEI4 UBM First sensors already processed Expect V2 submission fall 2011 FE-I4 8” wafer FE-I4 die

5 Heinz Pernegger / LHCC 16/11/10 FEI4 Tests on-going and very encouraging First tests focused on digital/communication section, next on analog Wafer testing for first wafer completed with 41 good chips of 60 on wafer

6 Heinz Pernegger / LHCC 16/11/10 Sensors and Qualification Modules FEI4 and first Sensor Batches are at IZM for under-bump metallization and flip-chipping: –One wafer is IZM now for UBM and dicing –This wafer will remain thick –Goal for this wafer is to get a reasonable number modules with all three sensor technologies –Irradiations and test beam We will start to compile a list of tests that we want to have completed until next summer’s sensor choice –Including irradiations, testbeams, lab measurements, stability measurements –Document production, assembly, yield, losses at different steps This will serve as main input to the external sensor review prior to sensor technology choice. With those modules we will determine FEI4 operation parameters (e.g. minimal threshold for each sensor type) and basic module performance parameters (resolution, efficiency near columns, edges, signal before and after irradiation with FEI4) We will compile a sensor technologies’ overview table when we have the results (Q 3-14, Q 9-1)

7 Heinz Pernegger / LHCC 16/11/10 Bump bonding: ~3 months work plan at IZM Planar (Q 3-7) –Nov: CIS n-in-n 250  m conservative and slim guard ring: UBM is done, start bonding when FEI4 available in the following priority: 8 conservative SC, 8 slim SC, 1 DC conservative, 1 DC slim –Nov/Dec: CIS n-in-n 150  m, UBM done now, 2 SC bonding when time available(~ Dec) –Discuss 6 inch n-in-p offline (handling wafer question, availability) 3D –2 nd half Nov/DEC: FBK ds UBM followed by 8 SC modules bonding (Dec) –Dec: UBM for Sintef/Stanford ss and UBM for CNM ds –Jan/Feb: bonding of 8 Stintef/Stanford ss SC mods + 8 CNM ds SC mods Diamond –End Nov/Dec: UBM of 6 DDL SC diamonds followed by bonding of 4 DDL SC –Dec: now prepare 4 II-VI SC diamonds (thinning) to go to Bonn & IZM

8 Heinz Pernegger / LHCC 16/11/10 Sensor questions Q 3-3 & Q 3-4: Amplitude and efficiency on 3D –Tracks directly along column show lower signal –TB measured efficiencies with FEI3: (a) perpendicular tracks -> efficiency ~ 96.5% (B=1.6 T) ÷ 96.7% (B=0) % (b) for tracks inclined by degrees : ~99.9% –Very small fraction (<1%) with perpendicular tracks in  and  rad Tracks along column Very small fraction of tracks aligned with columns (most tracks inclined in  and/or 

9 Heinz Pernegger / LHCC 16/11/10 Further sensor questions Q 3-5: Maximum operation voltage of 1000V agreed with sensor R&D groups –Compromise of signal amplitude and system design specification –HV components, flex, cable, connector limitation due to very tight space constraints –Above 1000V more power dissipation to cool and less experience with long-term reliability of planar sensor operation well above 1000V Q 3-8: Change of signal amplitude with irradiation –Give in figures 45, 49a, 56 of TDR; further measurements to come of sensors with FEI4 –Expect S/S 0 at 3 x n/cm 2 : –Planar ~ 55% at regular thickness, ~70% if thin (~150  m) –3D silicon ~ 75% –CVD diamond ~ 75% Q 3-1: 3D sensor single chip –More complicated processing than planar, therefore plan on single chip modules for better sensor yield –In active edge 3D sensor: distance active edge to physical edge ~  m, therefore no real penalty in single chip modules Q 3-17 : Double chip modules –2 chips placed by pick & place on top of sensor, followed by re-flow –Present ATLAS pixel module done with 16 chips on one sensor

10 Heinz Pernegger / LHCC 16/11/10 Staves Stave baseline is frozen (Q 4-1) –Ti pipe 2mm ID, ~100  m wall thickness –Coolant = CO 2 Plan to build staves (Q 4-5) –Will build 2x more modules than installed –Enough modules for up to 28 Cooling pipe & connection (Q 4-2, Q 4-3) –Pipe Max Design pressure 100bar, ASTM code safety factor 1.5 –All qualification of pipe/joints have been done after 150bar pressure test and passed –Elastic limit 200bar, burst pressure 400bar –welding and braising considered for connection to inlet and outlet

11 Heinz Pernegger / LHCC 16/11/10 Stave loading Constructed stavelets for module loading tests and detailed procedure to attach modules and stave flex to modules (Q 4-4, Q 4-6, Q 4-7) –Module glued to stave but allow for removal –Soft glue, as used for present modules, not appropriate as glue surface 3x smaller –Use 2 glue dots for attachment of modules to staves and  m thermal grease for thermal conductivity –Flex wing folded on jig and glued to module flex, followed by wire bonding

12 Heinz Pernegger / LHCC 16/11/10 Beam pipe (Q 1-1, Q 5-1, Q 5-2) IBL beam pipe for 2016 was discussed with LEB group and other experiments again on November 4 –See presentations ATLAS has requested beam pipe with 45mm ID (over full length) –Old beam pipe radius of 29mm had 15mm mechanical tolerance included to take up any misalignment of LHC vs experiment –alignment of experiments is much better known and beam well centered, which allows to reduce this number significantly –Cavern floor moves less than expected With the TDR layout of IBL detector this will increase envelop clearance between beam pipe and IBL module sensor envelope from 1mm to 3.5mm We assume that ATLAS and CMS will go for same diameter and, following current spare beam pipe policy, that a center BP is available as spare in the future LEB is studying this request currently –Aim at “go-ahead” this year so that IBL Beam pipe can be available as ATLAS spare from the shutdown 2012 onwards –Present beam pipe alignment will be measured again in this shutdown

13 Heinz Pernegger / LHCC 16/11/10 Beam pipe and clearances Layout : –Beam pipe Ø 45 ID (ID50mm is max. possible for IBL) –IBL with 14 staves –IST Ø : 85mm ID - 87mm OD The ATLAS beam pipe was mechanical inserted at -1.5 mm in Y and at 0 in X –to anticipate possible cavern movements, which are smaller than expected The beam spot analysis tell us that the precision of this operation was at least 0.5mm Adjustment, if necessary is done by adjusting calorimeters 13 Beam Pipe ØID 45 + Isolation IBL Package IBL IST Pixel Layer 0 Clearance = radius 2 mm Clearance = ID 45mm Fit: Center of beam pipe ~ (-0.2,-1.9)

14 Heinz Pernegger / LHCC 16/11/10 Beam pipe bake-out (Q 10-1, Q 10-2) Bake out of present beam pipe with Pixel Stave and modules at low temperature during all times –See note in additional documentation Precautions for IBL cooling plant interrupt: –Interlock to beam pipe heater system –In case of cooling plant failure, the system turns automatically to “blow-off” CO2 system to maintain cooling of modules (see document for details) Tests: currently build test mockup to verify FEA simulation –Beam pipe includes thermal insulation foam (currently 3mm), which could be increase in thickness  Convection top/bottom ~6C B-Layer (cooled) Heaters Off L2-Layer (not cooled directly)

15 Heinz Pernegger / LHCC 16/11/10 Installation (Q 7-1, Q 7-2, Q 7-3) Procedure of Beam pipe extraction and IST installation: Main risks associated with (a) Touching the B-Layer -> damage on B-Layer and (b) Loss of support wire Exercise extensively on IBL 1:1 mockup in Bat 180 IST supported on 4 points, with 2 close to middle, sagging in middle < 0.3mm from FEA

16 Heinz Pernegger / LHCC 16/11/10 Off-detector electronics Q 6-1: rack and service space requirements are with ATLAS TC. Empty racks are identified and service routing on-going -> no show-stopper Q 6-2 : The IBL ROD could be used for Pixel and could provide some advantages in monitoring, calibration and synchronization. However the costs for upgrading the Pixel system are significant. Q 6-3 : Opto-links improvements: Consider to use commercial VCSEL packages on BOC for TX links to detector. Up-sending VCSELs are located out side pixel package in an accessible place. Furthermore consider an opto-redundancy scheme (some prototyping started)

17 Heinz Pernegger / LHCC 16/11/10 Summary FEI4 chip received and first tests look very promising Several prototype sensors available in different technologies already Established work program with IZM for bump-bonding to give us planar, 3D and diamond modules. First modules expected just before christmas, which will be evaluated before sensor review in summer IBL beam request has been transmitted to LEB (45mm ID). We hope to get positive feedback this year still to launch fabrication soon We hope that we could answer most questions, much further detail is available in the draft EDMS document ATU-GE-MR-0017, which we hope to complete soon. We would like to thank LHCC and reviewers.