Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
1M. Ellis - MICE Tracker Meeting - 12th February 2007 Readout Electronics & DAQ  Introduction  DAQ Spreadsheet u VLSB_DAQ Sheet u Initialisation u Bias.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Florida Institute of Technology, Melbourne, FL
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Station Acceptance Test Update
Preparation for Station Acceptance Test
Hideyuki Sakamoto CM22, RAL 19/10/08
Tracker Station QA Acceptance Test Rig Status
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Station Acceptance Test

22/02/2007 M. Takahashi 2 Lab Layout at IC

22/02/2007 M. Takahashi 3 Source Scan Co57 (122keV photon, O(10 2 ) events) self-trigger on the front end board micro-positioning XY stages to excite 1 channel at a time (1.5 mm width) relative Light Yield for all channels + fibre uniformity check Cosmic Transportable light tight box (will be shipped for station 5 test at FNAL) External trigger using scintillation counters Absorber to filter out < 200MeV/c  extrapolate LY at MICE Test Methods counter0 cosmic box absorber counter1

22/02/2007 M. Takahashi 4 Hardware Prototype cryostat with one cassette (water-cooled compressor to supply He, with+ chiller for water circulation) Special self-trigger mode in AFEIIt VLSB readout and slow control via SBS810 VME-PCI Software Communication to front-end, DAQ and stage control in VB (Excel) Independent chiller monitoring in LabView C++ based offline reconstruction and analysis Readout System VLPC cassette (1024 ch) 2 x AFEIIt 2 x VLSB 1 station (600 ch) 1553 slow ctrl DAQ + ctrl + monitoring

22/02/2007 M. Takahashi 5 Run Move the source perpendicular to the fibre run on each view 200 micron steps x 3 lines  13k points to scan Aim for 10k events per ch in total = ~20 sec per 100Hz  1 day per 100Hz Analysis Offline zero suppression in G4MICE Store in a root file for each station –histograms for each channel (raw, raw-ped-cm) & cm per MCM –Ntuple with [ x, y, ch, hit ADC, hit PE] for all events Key numbers to go into database: # dead ch, LY mean + sigma Data Taking (Source Test)

22/02/2007 M. Takahashi 6 Cosmic test for Station 5 at FNAL in second half of March –DAQ comissioning –LY at MICE The entire readout system will be shipped to IC at some point after the cosmic test at FNAL Acceptance test for all production stations + 1 prototype (station 4) –~1 month for commissioning at IC –~1 month to test all the stations (15+1) source 1 day per station for characterisation cosmic test for selected stations for LY check Outlook

END