TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: 2016-01-18 to 2016-01-22 Agenda Item: TP21, Item.

Slides:



Advertisements
Similar presentations
Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
Advertisements

WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Test WG (WG6) 2015 Planning TST 15 Source: JaeSeung Song, TST WG Convenor (TTA), Meeting Date: TST WG6_2015_planning.
Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
Analysis of Available oneM2M Certification Models TST 15.3 Source: JaeSeung Song (WG6 Chair, Sookhyun Jeon (TTA,
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Interoperability event proposal Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Developing MARCOM and Outreach activities Group Name: MARCOM Source: Gerry McAuley, Ultan Mulligan Meeting Date: Agenda Item: n/a.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
ARIP Technical Committee Convener Call 07 April
PROMCODE Technical Committee Convener Call 14 February
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Interoperability event Sept 2015 Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
Discussion for the next oneM2M release Group Name: TP Source: JaeSeung Song, KETI, Jaeho Kim, KETI,
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Meeting Date: TST #21 Document.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
A discussion on Release duration TP #14 Source: JaeSeung Song, KETI (TTA), Meeting Date: TP Discussion_on_Release_duration.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
Call for input from WGs on things to test Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date:
Conformance Test Development Process discussion Group Name: TST WG Source: InterDigital Meeting Date: TST Conformance_Test_Development_Procedures.
Feedbacks on oneM2M certification Group Name: TP Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda Item:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Discussion points for 2 nd Interop Event Group Name: TST WG Source: Keebum Kim, TTA, Meeting Date: TP#22.
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Discussion on Certification Group Name: TST WG Source: JaeSeung Song, WG6 Chair, Meeting Date: TST #21.
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
2 nd oneM2M Interoperability Event Prof. Song JaeSeung (KETI, TST WG Chair) TST Introduction-to-2 nd -interop-event.
Discussion for Testing related Activities Group Name: TP Source: JaeSeung Song, KETI, Meeting Date: Agenda.
TST TTCN-3_development_plan TTCN-3 development plan Group Name: TST WG Source: Easy Global Market (EGM) Meeting Date:
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Issues on TST #28 (Overview)
6 March 2015 Webex IPv6 over the TSCH mode of IEEE e Chairs:
Semantic testing in oneM2M
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
Presentation transcript:

TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item 10, Reports from Working Groups TP R01-TST_status_report_to_TP_21

Issues for DECISION in TP 2 Approval of TS-0013 and TR-0025 as part of Release 1 Rattification of TS-0013 and TR-0025 prior to publication by the PT1s – TP request_for_approval_of_TS-0013 – TP request_for_approval_of_TR-0025

Issues for REQUEST in TP 3 In order to develop Test Cases (using TTCN-3), TST WG requires a repository. GitLab (github-like, can be hosted locally, provides same functionality but more intuitive, easier, user friendly) As TST WG will start work on developing test cases (as part of TS-0019), the repository is required ASAP. TST WG requests TP to approve this so that FC will discuss this.

Items for INFORMATION  TTA and ETSI propose to co-organize the 2 nd consecutive oneM2M Interop. test event.  Time: A week before TP#23 from Tuesday afternoon (10.May) to Friday (13.May)  3 days and half  Location: TTA, Seongnam-city, Korea (close to Seoul, 20 mins)  Scope: Test specification: TS-0013 TS-0001, 0004, 0008, 0009 and 0010: The recommended specs. Version will be notified 1 month earlier at least. Conformance Testing Tool Demo (if available)  ASK MARCOM and each SDO advertise this actively TP

Items for INFORMATION TP TP23 TP22TP Online registration -NDA sign -Organizing test sessions - To Update and be stable Spec Preparing official report in TP Interop Follow ups after the event Test Event TP20 Start to discuss 2 nd event Announcement in TP21

Items for INFORMATION  Meeting objectives summary Testing requirements analysis (derivation, annotation, etc.)  DONE Managing TS/TR  DONE Discussion on certification  DONE  SC Certification Ad-Hoc Date: 28 th. January TP

Next Steps TP TP # TP # TP # TP # TP # TP # Initial development Reqs. annotation and collection Part TPs development Extend TPs and reassessment Reqs and core TPs 2 nd Interop 3 rd Interop TTCN-3 for small set of TPs Develop TTCN-3 TTCN-3 structure Interop. testing Rel-2 Interop. spec.

Action Items Status #Action Item DescriptionOwnerStatus A-WG6-TP20-001Test related requirements analysisMiguel Angel Reina Ortega ONGOING A-WG6-TP20-002Prepare the updated TS-0013 and TR-0025 Laurent VelezDONE A-WG6-TP20-003Prepare 2 nd Interop. test eventSookhyun JeonONGOING A-WG6-TP21-001TP developmentVolunteersSTARTED A-WG6-TP21-002Testing env. & system tutorialRichardSTARTED A-WG6-TP21-003TTCN-3 developmentMiguel Angel Reina Ortega STARTED A-WG6-TP21-004Plan for Rel-2 interop. specLaurent VelezSTARTED TP

Next Meetings / Calls Conference Calls – TST#21.1: 2016-Feb-2, UTC 13:00-15:00 – TST#21.2: 2016-Feb-23, UTC 13:00-15:00 Face-to-Face – TST#22.0: March 14-18, EU – TST#23.0: May 16-20, Seoul, Korea TP