PAC Meeting, December 12, 2003 - Prebys 1 The Problem.

Slides:



Advertisements
Similar presentations
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Booster Operation in Support of the Collider Program
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
The “Run II Era” The proton source is very close the the specifications in the Run II Handbook. Although it’s the highest priority, support of collider.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
The Proton Source (mostly Booster) in the “Collider Era” Eric Prebys February 3, 2003.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Economics Eric Prebys FNAL Accelerator Division.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Presentation transcript:

PAC Meeting, December 12, Prebys 1 The Problem

PAC Meeting, December 12, Prebys 2 Formulating a Plan  The plan is to do what we can reasonably do to maximize the throughput and reliability of the existing proton source (incl. MI), under the assumption that a Proton Driver will eventually be built.  Scope largely determined by the budgetary guidance:  FY04: $0-2M depending on whom you ask and when you ask them.  FY05: $6M  FY06: $5M  FY07: $5M  FY08: $2.5M

PAC Meeting, December 12, Prebys 3 Comment on the Budget  This budget is more than enough to do the basic things that we must do to keep the proton source going, provided some of it appears this year!  It precludes certain ideas that have been suggested:  New Linac front end, or any significant 200 MHz upgrade.  Decreasing the Main Injector ramp time Which means there will be very little to do with the Main Injector.  There are some “big” (>$1M) projects that must be discussed.

PAC Meeting, December 12, Prebys 4 Near Term Priorities (Booster)  Optimizing Booster for improved lattice:  Tuning and characterizing 400 MeV line (Linac to Booster).  Tuning Booster orbit to minimize losses.  Commission Collimators:  Estimate another month or so to bring into standard operation.  Aperture Improvments:  Alignment (see next slide)  Orbit control Abandoning our original global plan in favor of local control at problem spots for the time being.  Prototype RF Cavities Two large aperture prototype cavities have been built, thanks to the help of MiniBooNE and NuMI universities. We will install these as soon as they are ready to replace existing cavities which are highly activated.  It’s hoped this work will allow us to reach the MiniBooNE baseline this year.

PAC Meeting, December 12, Prebys 5 Vital Projects This Year  Alignment:  Continue with the alignment of the Booster and Booster network.  Not a lot of money, but needs priority during access opportunity.  Collaboration with AMG very successful so far this year.  Long 13 work:  Replace MP01 and ML01 with new septa In addition to helping lattice problems, addresses a critical spares vulnerability.  Implement “dogleg fix” Build new dogleg magnets with spares on hand. Build new stands (Argonne will pay).  When we’re done, the dogleg lattice distortion will be >4 times smaller than it was to begin with.  In good shape for summer shutdown.  ORBUMP Power Supply  This addresses a significant vulnerability and paves the way for high rep. rate operation if we solve our loss problems.  Design well under way for a new supply capable of higher currents at a full 15 Hz.  New switch network close to completion.  Can be ready for summer shutdown with aggressive schedule and priority.

PAC Meeting, December 12, Prebys 6 Vital Projects (cont’d)  ORBUMP Magnets (Run II plan??)  Address significant vulnerability.  Allow for higher rep. rates  Along with new power supply, will solve injection slewing problem, effectively increasing aperture.  New design well along based on new generation of ferrites: cheaper and easier to build.  Can be ready for summer shutdown with aggressive schedule and priority.  We’re working on accurate costs, but the total cost of all of these projects will be the order of $600K. This is smaller than the “virtual” $2M, but cannot fit under my existing budget.  I consider these projects “no-brainers” and would like to get a go-ahead soon on all of them.

PAC Meeting, December 12, Prebys 7 Maintenance, instrumentaion, and reliability projects  Linac instrumentation  Proceeding with high-speed digitizers on old linac.  Considering upgrading BPM system.  Booster LVPS replacements (particularly the Power-10’s).  Upgrading Booster BPM readout system.  Improved Booster tune measurement system.  Linac shielding?  If we are able to send more beam to Booster, we will begin to trip Linac rad. monitors.

PAC Meeting, December 12, Prebys 8 Some “Big” Ideas being considered  Significant Booster RF improvements  New, large aperture cavities?  New, solid state PA’s?  2 Additional cavities?  Adding higher harmonic to magnets:  Similar to extra RF?  Still being studied?  New Linac QUAD power supplies?  A reliability issue.

PAC Meeting, December 12, Prebys 9 Selected R&D Projects  Ion source notching.  Use for pre-notching beam into Booster  Not compatible with current cogging scheme, but maybe with MiniBooNE.  37MHz laser chopping  Reduce capture losses.  A recommendation at the DOE review  Booster transition jump  The future of the Booster and maybe it always will be.  Some concrete commitment from Argonne.  Radiation Robot  Lots of university interest and support ($$)  Looks like it might be cheaper than we thought.

PAC Meeting, December 12, Prebys 10 My Schedule for the Plan  By end of February:  Gather data  Complete project “skeleton”, including every conceivable task being discussed at least at some level.  Have accurate cost and resource estimates for the things on my “vital” list, as well as the smaller maintenance items.  By “the summer”  Gather enough information to make a recommendation on the bigger items Booster RF Linac shielding and Quad power supplies Other things that come up.

PAC Meeting, December 12, Prebys 11 Some Questions that I have  Which does the lab consider to be a priority?  Accurate costs and schedules for the “vital”, near term projects.  A “big picture” and infrastructure, i.e. a full project format.  Is this “plan” primarily supposed to be about money, or does it also include things like studies and optimizations?  What do I do with things that are now under Run II:  ORBUMP Magnets (but not power supply)?  LLRF upgrades?  Beam cogging?