Status Presentation Group 7: 1394b Receiver Aparna Trimurty Stancil Starnes Jeff Shlipf March 28th, 2002.

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

Kit Building Class Lesson 4Page 1 R and X in Series Inductors and capacitors resist the flow of AC. This property is called reactance. Resistance also.
CHAPTER 3: SPECIAL PURPOSE OP-AMP CIRCUITS
Arduino Guitar Pedal Ian Andal IME 458 Dr. Pan.
By: Alex Sowa Electrical Projects April 10 th, 2013.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Dual H-Bridge L298N Breakout Board By Marcelo Moraes BIGDOG1971.
Jan. 15, Safety Board Review (Rev D) Safety Board PCB Review (Rev D) Eric Warmbier.
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Bringing Gigabit Ethernet to the Masses Supervisor: Dr. Martin.
The following schematic displays the general setup of the Dunk Probe test. The Aluminum sample tested during this run (DSAT3) had a thickness of 200nm.
1 DC ELECTRICAL CIRCUITS ELECTRONIC TRAINER AND BREADBOARDING.
(LF Transmitter Module, High Power) Development Prototype
© 2001 By Default! A Free sample background from Slide 1 Gigabit Optical Ethernet ECE 4006C – Spring 2002 – G1 Team Ryan.
ECE 4006 Presentation on Preliminary Results Group: G3 Member: Karen Cano, Scott Henderson, Di Qian.
Power Line Communication using an Audio Input
Objectives How Microcontroller works
Senior Design 4006C Group G7 Design Presentation 1394b – Receiver The new generation of FireWire. Luke Starnes (gte874d) Aparna Trimurty (gt9794a) Jeff.
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Progress Report of Gigabit Ethernet Design ECE 4006A October 18, 2001 Ashley Lee Shaun Rosemond.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r Astou Thiongane,
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
JMC – Joint Motion Controller Complete guide to building and testing each JMC.
Senior Design 4006C Group G7 Final Report 1394b – Receiver The new generation of FireWire. Luke Starnes (gte874d) Aparna Trimurty (gt9794a) Jeff Schlipf.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Results Status Presentation Receiver Group.
Circuit Lab. Experiment-1 Int. To Circuit Components Lab. Devices and Voltage Measurement.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
ECE 352 Electronics II Winter 2003 Ch. 8 Feedback 1 *Feedback circuit does not load down the basic amplifier A, i.e. doesn’t change its characteristics.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Final Report 1394b:Optoelectronic Data Communications Group G9: Tiffany Lovett, gte291r Tornya Moore, gte668r Mareisha Winters, gte824t ECE 4006C April.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
ILC Hybrid MOSFET/Driver Module Update T. Tang, C. Burkhart September 29, 2011.
Lab instruments ELCT 201 Digital Multimeter Voltage Tester
Operational Amplifiers The operational amplifier, also know as an op amp, is essentially a voltage amplifier with an extremely high voltage gain. One of.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
1394b Gigabit Ethernet The transmitter Group (G8) Design Proposal Mubin Ansari Zubair P. Siddiqui February 14, 2002.
Laser Drive Needs Total laser current –I TOT = I BIAS + I MOD BIAS Current –Keeps I TOT > I TH (laser “on”) –I BIAS – I TH related to speed Modulation.
Information for the assembly of the test board w/ PMT and preamps
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Gigabit Ethernet – Design Plan ECE 4006 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Field Effect Transistors (2)
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Receiver Group G1 David Gewertz Ryan Baldwin.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Receiver Circuit Testing Test setup Eye diagrams BER measurement Eye - BER relationship.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Voice Controlled Home Automation System Group 13 Zhe Gong Hongchuan Li.
How to Build a Digital Physical System - Lab Lecture 2.
ECE Group Members Samantha Starr BME Arduino Arianna Weinshel BME Sensors, Circuits Eden Woldemichael CE AM Radio Taylor Brooke EE Instrumentation,
Basics of Bypass Capacitor, Its Functions and Applications.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Classification of PAs: linear vs. switching
Setup for automated measurements (parametrization) of ASD2 chip
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Basic MOS Amplifiers: DC and Low Frequency Behavior
555 Timer EEE DEPARTMENT KUMPAVAT HARPAL( )
Optical Gigabit Ethernet
AC Inlet & AC Input Filter
Enhancing and Implementing an Improved Gigabit Ethernet Card
1394b Design for Gigabit Optoelectronic Data Communication
Receiver Circuit Testing
Receiver Circuit Testing
Dual H-Bridge L298N Breakout Board By Marcelo Moraes BIGDOG1971.
GIGABIT ETHERNET DESIGN ECE Spring 2004
Task List Group management plan Background studies
Laser Drive Needs Total laser current BIAS Current
Presentation transcript:

Status Presentation Group 7: 1394b Receiver Aparna Trimurty Stancil Starnes Jeff Shlipf March 28th, 2002.

Objective of presentation To report modifications and advancements to the project since the design report.To report modifications and advancements to the project since the design report. Status: stages 1 and 2 completed, stage 3 in progressStatus: stages 1 and 2 completed, stage 3 in progress

Stage 1 Purpose: testing an optomodule out of its original environment(TI card) by placing it on a evaluation board built by the group.Purpose: testing an optomodule out of its original environment(TI card) by placing it on a evaluation board built by the group. Opto module used: Agilent technologies HFBR-53D5Opto module used: Agilent technologies HFBR-53D5 Status : CompleteStatus : Complete

Stage 1: Design details

Stage 1: Test setup GTS 1250 GBIC test system pattern generatorGTS 1250 GBIC test system pattern generator Textronic TDS 7154 Digital Phosphor OscilloscopeTextronic TDS 7154 Digital Phosphor Oscilloscope

Stage 1: Test results Ch2 K28.7 Ch 2 PRBS7Ch 2 PRBS7

Stage 2 Purpose: testing the Maxim Receiver evaluation kitsPurpose: testing the Maxim Receiver evaluation kits MAX 3266 – transimpedance amplifier(TIA) MAX 3266 – transimpedance amplifier(TIA) MAX 3264 – limiting amplifier MAX 3264 – limiting amplifier Status: Complete.Status: Complete.

Stage 2: Design details MAX 3266 power connector design- can connect to a regular AC adaptor.MAX 3266 power connector design- can connect to a regular AC adaptor. MAX changed connectors of ac adaptor to match board connector.MAX changed connectors of ac adaptor to match board connector. Caused by a lack of accurate 5V power supplies.Caused by a lack of accurate 5V power supplies.

Stage 2: Testing

Stage 3 Purpose: the design and fabrication of a functional and cost effective receiver board based on the MAXIM boardPurpose: the design and fabrication of a functional and cost effective receiver board based on the MAXIM board Status: in progressStatus: in progress

Stage 3: modified design New designNew design Old designOld design

Stage 3: Modifications 1. The Level pin was grounded on the 3264 to maximize output voltage.1. The Level pin was grounded on the 3264 to maximize output voltage. 2. The Squelch pin was grounded on the 3264 to disable squelch. It is important to see all signals in testing, no matter how small they may be.2. The Squelch pin was grounded on the 3264 to disable squelch. It is important to see all signals in testing, no matter how small they may be. 3. The CAZ1 and CAZ2 pins on the 3264 are left open. In the specification sheet it is stated that for gigabit Ethernet these pins should be left open.3. The CAZ1 and CAZ2 pins on the 3264 are left open. In the specification sheet it is stated that for gigabit Ethernet these pins should be left open. 4. The Filter pin was left open on the 3266 to enable DC cancellation.4. The Filter pin was left open on the 3266 to enable DC cancellation. 5. The Loss-of-Signal circuit was omitted to further simplify the board. This also allowed for the TH pin to be left open as this simply sets the threshold of the LOS circuit.5. The Loss-of-Signal circuit was omitted to further simplify the board. This also allowed for the TH pin to be left open as this simply sets the threshold of the LOS circuit.

Stage 3: Modifications 6. The power filtering inductors were omitted. This was possible based on the fact that three separate supplies will be used and long power cords will be used between the board and the power supplied.6. The power filtering inductors were omitted. This was possible based on the fact that three separate supplies will be used and long power cords will be used between the board and the power supplied. 7. A single 1nF capacitor is used for decoupling the power supplies. Based on the use of three separate supplies 1nF should suffice.7. A single 1nF capacitor is used for decoupling the power supplies. Based on the use of three separate supplies 1nF should suffice. 8. Decoupling capacitors for the input and output of the circuit as well as between the TIA and LA chips were left in to maintain a good signal.8. Decoupling capacitors for the input and output of the circuit as well as between the TIA and LA chips were left in to maintain a good signal.

Stage 3: PCB layout and design considerations Red squares are power supplies. The input power is for the TIA, the 2 output ones are for LA ( as LA has 2 stages of amplification) 3 separate power supplies are used to reduce noise on board. Board layout assumes front pin of connector is ground and the inner pin is VCC. Power supplies not following this assumption will be modified to work with the design.

Proposed part list #Part DescriptionManufacturer Part Number Price (all) To Obtain 4.01uF capacitor – 0805 ECJ-2VB1H103K$.97Order from Digikey 31nF capacitor – 0805 ECU- V1H102MEN $.97Order from Digikey 1.1uF capacitor – 0805 ECJ-2VF1E104Z$1.06Order from Digikey 2100 Ohm resistors – 0805 ERJ-6GEYJ101V$.80Order from Digikey 167 Ohm resistor – 0805 ERJ-6GEYJ680V$.80Order from Digikey 150 Ohm resistor – 0805 ERJ-6ENF49R9V$.90Order from Digikey 3SWC Power Supply Connector RAPC722$3.12Edgar ordered some 3Jameco SMA connectors N/aA bag in lab

Future Considerations 1.Verifying the functionality of PCB board design. 2.Having Bob House create the board using the gerber file 3.Order part list. 4.Work on fixing the errors in our Agilent board that are ouputing an erroneous eye. 5.Solder, test, and troubleshoot the new board in a similar manner as the MAXIM kits. 6.If board produces a good eye it should be tested in conjunction with the 1394b transmitter board and OE board.