Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
SciFi Tracker Beam Test outline The performance TOF which is needed to Beam Test & Guide7 Simulation TOF calculation TOF ACC estimation test for Beam Test.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
TOF/ACC test Overview M. Yoshida Osaka Univ.. TOF / ACC in the prototype test For the prototype test in May, we will need PID: –TOF counter Distinguish.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
AFE II Status First board under test!!.
Preparation for Station Acceptance Test
Tracker Software Status
Presentation transcript:

Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th

Tracker MICE Note The full version of Tracker MICE note released – acker-volume/ Design / Construction of the first prototype of SciFi tracker is described The result from cosmic-ray test at D0 test-stand is reported The reconstruction tools are explained WBS

Talks on the scifi tracker Parallel tracker session on Wed. is focused on the KEK beam test scheduled in May and later. Time-of-flight counters and ACC is newly developed, and tested at KEK-PS secondary beam line Status of the tracker / waveguide fabrication and electronics/DAQ work is reported Simulation work on the beam test has been started On the second day, design and preparation for the full tracker is reviewed. In the plenary session on Fri., Malcolm showed a excellent progress on emittance measurement with the tracker Efforts on the KEK beam test is summarized in the following slides.

Sci Fi Performance Malcolm Ellis MICE Collaboration Meeting Feburary 11 th 2005

Uncorrected 4D Emittance

Corrected 4D Emittance

Bias vs Resolution

KEK beam test Test for the SciFi tracker with 1T solenoid magnetic field p/  /  /e  test beam line in KEK-PS Slow extraction from the internal target in 2-sec flat top of a 4-sec spill Add 4 th station to the prototype tracker Newly developed Cryostat with Cryocooler –2 VLPC cassettes embeded

Phase Ⅰ setup ( Apr 2005, KEK pi2 ) 5x5 hodoscpe

Phase Ⅱ setup (Oct 2005, KEK pi2) ・ μmomentum : 300~400MeV /c ・ low beam rate ・ but, defuser makes many condition of beam

TOF and ACC performance test & low momentum beam rate measurement for KEK beam test Atsushi Horikoshi (Osaka Univ.) Ken’ichi Sakai (Univ. of Tokyo)

TOF design unit : mm ・ very long light guide ⇒ to avoide strong magnetic field ・ PMT:R6504S fine mesh PMT (used by BESS, 19DY, strong resistance of magnetic field)

TOF construction scintillator & light guide is wrapped by Aluminized Mylar(50μmthin) scintillator EJ230(BC420) EJ204(BC404)

position dependence of resolution (preliminary) good resolution~ pos

Measurement on low momentum beam Muons come in ~0.3Hz or more at 0.3GeV/c  can use for Phase-II

ACC light yield for pi/mu/e   e 0.5Gev/c 0.6Gev/c ACC pulse height Time of flight

Preparation for KEK beam test SciFi tracker (G. Barber) Waveguide (M. Yoshida) Electronics (P. Rubinov) Cryostat (R. Rucinski) DAQ (M. Yoshida) Simulation (K. Yonehara)

G.Barber KEK Test Beam Update, Berkeley 9 Feb 2005 Prototype Layout All of the components that make the space frame assemblies have been or are in the process of being manufactured. There is still detail design to do to complete the assembly a list of outstanding items is on the next slide

G.Barber KEK Test Beam Update, Berkeley 9 Feb 2005 Station Progress The 4 th station is now under construction. The layout has a total of 30 connectors, 10 per view. Each connector has 22 holes instead of the previous 18 but all of these are not used in every connector. All 3 planes are glued and the ‘connectorisation’ is under way and will be finished by the end of this week. It will then undergo extensive checking before being potted.

G.Barber KEK Test Beam Update, Berkeley 9 Feb 2005 Space Frame Components All of the components that make the space frame assemblies have been or are in the process of being manufactured. Tooling The jigs that align the space frames are all manufactured. One further development?

G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress To do list Final detail for the outer casing including the brackets to fix the assembly during transport and into the magnet. The modification that will allow the original prototype stations to be married to the new space frames A new patch panel to be made or the existing one modified. The space frames to be assembled Polishing of the 4 th station

VLPC Cryo Status Cryo-Cooler Version

Preliminary fit up - good

Status Summary  Real assembly should start this week.  Many miscellaneous parts ordered and most here. (o- rings, bolts, cryo grease, fittings, copper strips)  Compressor for Cryo cooler wired up. Extending control cables.  Run Cryo cooler only – week of 2/21?  Cool cassettes – week of 2/28 or later?  Ship in March

DAQ for the KEK beam test Standalone DAQ system for VLPC Standalone operation of Cryostat Readout TOF counters and the other. –CAMAC ADC/TDC Readout AFEII on VLPC cassette –In KEK beam test, ~1k particles / spill –MICE beam ~600 muons / 850 usec –Existing system used for cosmic-ray test is rather slow ~40 events / pulse –Need memory module to store data in MICE situation with fast LVDS data links

VLPC backplane Linux PC PCI-VME (SBS Bit3) SASeq #2 SASeq # LVDS-FIFO# 3 LVDS-FIFO # 4 AFE II (L) AFE II (R) VLPC Cassette #2 VLPC Cryostat AFE II (L) AFE II (R) VLPC Cassette #1 VME BUS DAQ System for KEK beam test CAMAC-VME CAMAC ADC/TDC 6U Serialized ADC DATA Slow Control Trigger Control 1024 ch 8x64 ch 4 4x8bit = 32 bit / board 8x64 ch LVDS-FIFO #1 LVDS-FIFO # 2 4 4 4

An idea of the DAQ architecture Bit3 SASeq#1 SASeq#2 SASeq#3 SASeq#4 SERDES#1 SERDES#2 SERDES#3 SERDES#4 SERDES#5 SERDES#6 SERDES#7 SERDES#8 VLPC #1 L VLPC #1 R VLPC #2 L VLPC #2 R VLPC #3 L VLPC #3 R VLPC #4 L VLPC #4 R Tracker Collector Upstream Tracker Collector Downstream Tracker Builder PID Builder Beam Builder MICE Builder MICE Storage MICE Control Bit3 SASeq#1 SASeq#2 SASeq#3 SASeq#4 SERDES#1 SERDES#2 SERDES#3 SERDES#4 SERDES#5 SERDES#6 SERDES#7 SERDES#8 Tracker Control Bit Tracker Slow Ctrl VLPC #1 L VLPC #1 R VLPC #2 L VLPC #2 R VLPC #3 L VLPC #3 R VLPC #4 L VLPC #4 R Upstream TrackerDownstream Tracker 4096ch 4kBytes/event 8MBytes/spill 4kBytes/event 4MBytes/spill Cryosat Ctrl/Monitor

 First AFEII prototype is now on the cryostat and taking data.  Next 4 slides show the AFEI problems that AFEII is designed to solve: u SVX saturation. u SVX tick to tick ped variation. u DISCR to SVX data cross talk. AFEII prototypes

AFEII proto: Results  Discr to ADC xtalk: it is impossible to make a plot like this with AFEI Plot from AFEII with 30% discr occupancy. Compare to AFEI with 32% discr occupancy many chan…

LVSB Board VME LVDS SERDES Buffer (Serializer-Deserializer)

VME LVDS SERDES Buffer (VLSB)  The D0/MICE VME64 LVDS SERDES Buffer (D0 VLSB) is a VME64 single wide 6U module SERDES (SERializer- DESerializer)  It can be used for Read out and testing the AFEII boards. The module is a custom LVDS  SERDES Buffer with 4 LVDS inputs channels and can be operated stand-alone with minimal additional hardware.  The design allows system expansion to multiple modules.  A D0 VLSB module can receive/generate trigger signals over two Lemo connectors on the module front panel.  A normal test system configuration consist of a VME 64 subrack where slot 1 is occupied by a VME subrack controller and the D0 VLSB cards will occupy one or more of the remaining slots.

VME LVDS SERDES Buffer (VLSB)  The Boards (6) are now complete and ready for test and integration into the MICE DAQ system (KEK and final system if we choose to do so)

Simulation for KEK beam test K. Yonehara IIT

Present status A field map for spectrometer was included. The spectrometer was tilted. Beam tracks were extracted. All above items were presented in the last MICE collaboration meeting at RAL.

K. Long, 17 March, 2016 Discussion – Really action items in preparation for KEK tracker meeting – NEXT tracker meeting: KEK: 29 – 31Mar05

Issues/action items: Layout/mechanicalGeof Layout of area, including position of VLPC cryostat and clear-fibre run General layout and support Transfer alignment marks to can Default tracker specificationKatsuya Station order: 3, 2, 2, 3 Spacing: 150 mm, 250 mm, 550 mm Issue is to put it in the simulation and verify that performance is OK Plan for ‘fifth’ station Single fibre readout … how best to implement

Issues/action items continued: Electronics: Local ground for VLPCs at KEKKoji AFE backplane(s)Paul System test at FNALPaul Paul lead but all must seek to contribute! Mil 1553 modulesPaul Helium gas for VLPC cryostat at KEKKoji Vacuum pump for evacuating VLPCsKoji prior to back filling with He at KEK AFE power supplies:Paul Check operation at 50 Hz

Issues/action items continued: Trigger counters: SpecificationKoji FabricationFNAL Trigger/event numberMakoto

Actions towards finalisation of tracker design To be reviewed in the KEK tracker meeting in March Mechanical design –Detailed design of the support mechanism inside bore –Magnetic field monitoring –He-filled bore –diffuser –Detailed layout inside/ outside Cylinder / VLPC position / external fiber run –etc… Electronics/DAQ –Triggering / Event numbering scheme –Triggering by tracker hit?

Summary SciFi tracker group is aiming to test the prototype at KEK to check the fabrication procedure and the performance. Great efforts on the preparation is on-going. All the equipment will be delivered to KEK in March Tracker workshop will be held at KEK on of March, and hope to initiate the operation of the system.