17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.

Slides:



Advertisements
Similar presentations
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD RF Exposure and Modular Equipment Considerations.
Advertisements

Doc.: IEEE Submission July 2007 John Notor, Cadence Design Systems, Inc.Slide 1 Overview of FCC ET FNPRM ISM Band Spectrum.
RF Safety Program - Guidelines for Compliance - Understanding
GSC: Standardization Advancing Global Communications For Information and Discussion Standardization development in the IEEE is carried out under the oversight.
Review of NC Toxic Air Pollutant Rules (pursuant to Session Law ) North Carolina Division of Air Quality Stakeholder Meeting September 25, 2012.
Presented to AICC Meeting September 10, 2013 By John Prendergast Blooston, Mordkofsky, Dickens, Duffy & Prendergast, LLP.
M ULTISPECTRAL S OLUTIONS, I NC. Ultra Wideband RFID Technology Rob Mulloy Vice President & COO Multispectral Solutions, Inc. Multispectral Solutions,
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
ACB Module Assessment and Integration FCC and IC Michael Derby ACB Europe7 April
OSHA Requirements for Tower Construction Related to RF Radiation
5/9/2015TCB Council1 TCB Sharing of FCC KDBs Michael Derby TCB Council Chairman 9 th April 2014.
RF Safety By Bob Buus, W2OD. Certification 6) Amateur Applicant/Licensee certifies that they have READ and WILL COMPLY WITH Section 97.13(c) of the Commission’s.
Slide 0 National Spectrum Managers Association Unlicensed Devices – An Update Mitchell Lazarus May 22, |
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Mike Wood & Jack Rowley EMF Technical Group Leaders,
GSC: Standardization Advancing Global Communications Resolution GSC-10/05: (GRSC) Facilitating Liaison in Relation to Measurement Methodologies for Assessing.
Radio Frequency Safety. Purpose Provide: Basic Technical Understanding Overview of FCC Regulations and Compliance Issues Hazard Recognition Skills Awareness.
RADHAZ Material Outline Introduction and Background Standards and Applications Prediction of Electromagnetic Fields Measurement of Electromagnetic Fields.
DTR/H&D Joint Venture1 Radio Frequency Exposure and Compliance Issues for a Shortwave May 2008 Matthew W. Folkert, MSEEE Stephen S. Lockwood, P.E. dTR/H&D.
Doc.: 19-11/81r1 Submission July 2011 Junyi Wang, NICTSlide Liaison Report Notice: This document has been prepared to assist IEEE It is.
Technician License Course Chapter 9 Lesson Module 21 Radio Frequency Exposure.
Introduction to Radio Frequency Radiation Robert Curtis, USDOL/OSHA Directorate of Science, Technology and Medicine March 2003.
January 2005 Abbie Mathew, NewLANS Slide 1 IEEE /054r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
Telecommunications Law 1. 2 Summary of Proposed Amendments To Scarsdale Zoning Code PRESENTED BY: Joseph Van Eaton.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Doc.: IEEE COEX-02/011r0 Submission March 2002 Jim Lansford, Mobilian CorporationSlide 1 Simultaneous Transmission: Some comments from FCC Jim Lansford.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
Doc.: IEEE /1012r1 Agenda August 2015 Rich Kennedy, MediaTek IEEE /15 Regulatory SC Teleconference Plan and Agenda Date: Authors:
1 2 nd INDUSTRY CONSULATION ON PROPOSED UNIFIED LICENSING FRAMEWORK IN KENYA: KCCT 19 th March 2008 Frequency Issues Communications Commission of Kenya.
Radiation Safety Plan Recommended by OSHA Elements of Plan  Site Specific Issues  Personnel Training  Safety Procedures  Definition of Controlled and.
RF Exposure Evaluation for Amateur Radio Operators Marc C. Tarplee, Ph.D. Technical Coordinator, SC Section.
Time Frame. Opportunities To Comment Today October 15 th - Urban Stakeholders Committee November 9 th – California Water Commission Formal Rulemaking.
Doc.: IEEE /1171r0 SubmissionRich Kennedy, MediaTek Summary of FCC Administrative Changes Proposed in NPRM FCC Date: Authors:
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
Committed to Connecting the World March 2011 Geneva, March 2011 Presentation of the Recommendation ITU-T K 100: Presentation of the Recommendation.
NSMA Working Group Conference Report Larrie Sutliff, Chair NSMA Spectrum Management /16/2012.
Doc.: IEEE j Submission July 2011 Dave Evans, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /455r0 Submission July 2002 Mika Kasslin, NokiaSlide 1 Harmonized Standard from BRAN#29 Mika Kasslin.
Spectrum Sharing in 3.5 GHz Band
Overview of International guidelines concerning Human exposure to RF radiation From GSM Base Stations Eng. Nasser Al-Nasser Communications and Information.
RF Exposure and Limits A Basic Overview. Background Recent developments in the electronics industry have led to the widespread use of radio frequency.
Fifth SADC Preparatory Meeting for the WRC-15 AGENDA 1.18 To consider a primary allocation to the radiolocation service for automotive applications in.
Standards and Regulations Team Daedalus. Standards and Regulations 1.FCC – Part 15 2.Advanced Encryption Standard Description Prescriptions and Standards.
EMF GUIDELINES AND STANDARDS
FCC Regulations for Spread Spectrum Devices
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
Test Requirements and Procedures
GSM Base Station Antennas
Resolutions on Radio Microphones and Cordless Audio Standardization
MHz FCC Action Date: Authors: March 2005
RF Safety for the Radio Amateur
Summary of FCC’s Cognitive Radio Proceeding
GSC: Standardization Advancing Global Communications
TRTR Briefing September 2013
WELCOME.
TV white space FCC action
TV white space FCC action
Submission Title: [Regulatory Update]
Spectrum for Public Safety TIA Regulatory Update
GSC: Standardization Advancing Global Communications
What is the International Telecommunications Union (ITU)?
What type of radiation are VHF and UHF radio signals?
Project: IEEE P Working Group for Wireless Personal Area Networks
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
SOURCE: TIA TITLE: Unlicensed Products and Services in Television White Spaces – TIA Regulatory Update AGENDA ITEM: GRSC4 5.7 Software Defined Radio and.
GSC: Standardization Advancing Global Communications
MHz FCC Action Date: Authors: May 2006 May 2006
The Control of Electromagnetic Fields at Work Regulations 2016
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding AGENDA ITEM:GRSC Item 5.2 CONTACT:Bill Belt, TIA, GSC9/GRSC_021b

GSC-9, Seoul217/03/2016 FCC Inquiry The FCC is proposing modifications in its rules to provide more efficient, practical, and consistent application of compliance procedures. Specifically, the FCC is proposing to: 1) revise and harmonize the criteria for determining whether transmitters used in a number of services are subject to routine evaluation for compliance with the RF exposure limits or are categorically excluded from such evaluations; 2) clarify the procedures for evaluating RF exposure from mobile and portable devices, including modular transmitters; 3) add more specific definitions and compliance procedures relating to RF exposure of workers (occupational exposure); 4) develop consistent labeling requirements to ensure the compliance of certain types of RF devices; 5) consider certain issues related to spatial averaging of exposure, including how to account for localized exposures whose spatial peak measurements might exceed the exposure limits; 6) make certain changes in its rules to eliminate inappropriate references or to make evaluation procedures consistent and complete; and 7) provide a transition period for the implementation of any new rules. The FCC invites comment and suggestions on these proposals and on certain additional issues related to compliance with RF guidelines.

GSC-9, Seoul TIA Response Comments TIA urges the Commission to continue in its efforts to ensure that the public is appropriately protected from any potential adverse effects from RF exposure, while avoiding the creation of any unnecessary burdens in complying with the RF exposure rules TIA supports the FCC efforts to revise and clarify the responsibilities of licensees and grantees in order to ensure compliance with the FCC RF exposure limits in a more practical, consistent and efficient manner Routine evaluation should be required for facilities where the separation distance from publicly accessible areas is less than 10 meters and the transmitting power is 100 watts ERP or greater for services operating at frequencies below 1.5 GHz or 200 watts ERP or greater for services operating at frequencies at 1.5 GHz and above

GSC-9, Seoul TIA Response Comments Fixed transmitting facilities should be categorically excluded from routine evaluation if the separation distance to publicly accessible areas is 10 meters or greater Very low power fixed transmitters, devices mounted in such a way that persons are normally not closer than 20 cm from any part of the radiating structure, should have a categorical exclusion threshold of 1.5 W ERP if operating at frequencies at or below 1.5 GHz and a categorical exclusion threshold of 3 W ERP if operating at frequencies above 1.5 GHz The FCC should adopt a Supplier's Declaration of Conformity (“SDoC”) process for approval of very low-power transmitters The FCC should require SAR evaluation of “higher power” consumer devices that use of spread spectrum transmitters operating in the MHz, MHz and MHz bands and are designed for use within 20 cm of the body, if the maximum output power exceeds 100 mW