1 ECS CALO LED Control System CALO Piquet Training Session 21.10.09 Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Laurent Locatelli LHCb CERN Calo commissioning meeting 16th April 2008 Trigger Validation Board PVSS control status 1.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
LHCb Configuration Database Lana Abadie, PhD student (CERN & University of Pierre et Marie Curie (Paris VI), LIP6.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Analog FE circuitry simulation
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring and control System.

2 Introduction The main aim of the LED monitoring system is to monitor the PMT gain in time of data taking. Other important role of the system will be in time of the detector commission and testing in the LHC machine stops. There are three sub-detectors (PS/SPD, ECAL, HCAL) and each of them has some specifics: number of grouping channels per LED, LED light variation range, requirement of a LED light stability monitoring The LED monitoring consists of three functional parts: 1. Subsystem for a LED intensity control and signal distribution, based on HV_LED_DAC boards common for HV and LED control. 2. Subsystem for a LED trigger pulse control and distribution based on LEDTSB boards. The LEDTSB boards are included into six DAQ projects: PRSDAQA1, PRSDAQC1 on front end PCs PSDAQHVA01W and PSDAQHVC01W; ECDAQA1, ECDAQC1 on front end PCs ECDAQHVA01W and ECDAQHVC01W; HCDAQA2, HCDAQC1 on front end PCs HCDAQHVA01W and HCDAQHVC01W; 3. LED drivers with LV power distribution ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

3 ECS CALO LED Control System The 64 channels LED triggering pulse board - LEDTSB has been developed. The board produce the pulses for LED flashing synchronously with a broadcast Calibration command. LED triggering HARDWARE 15 LEDTSB boards have been fabricated and 12 boards installed into the FE crates on the electronics platform. The boards are connected to the SPECS bus through the CROC. For configuring this boards a lbLEDTSB framework component has been developed and integrated into six calorimeter sub-detector DAQ projects. Photo of the ECAL FE crate with two LEDTSB boards cabled to the LED drivers HCAL-A DAQ top level panel with integrated to FSM LEDTSB board CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/

4 ECS CALO LED Control System Top level panel (Control Unit) of the sub-detector LED triggering boards LEDTSB There are two level of panels for LEDTSB board. One is the sub-detector top level (Control Unit) panel and others are the expert panels. The LEDTSB boards configuration is performed by standard FSM way with the commands of DAQ partition. There is flexibility for preparing or modifying a LEDTSB recipe: The LEDTSB top level panel allows to load new values from a configuration file or from the dedicated CALO Data Base. The LEDTSB parameters could be modified with using the expert LEDTSB panels too. After updating the recipe content one can save the recipe with specified name (if no name specified the default type PHYSICS is applied). CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Not implemented yet Options for recipes creation

5 ECS CALO LED Control System Device Unit panel of the LEDTSB triggering pulse sequence configuration Device Unit panel of the LEDTSB delay triggering pulse configuration Two LEDTSB expert panels CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ One channel settings Load settings from file System Info Editing steps: 1.Edit table 2.Update DPs 3.Apply to HW

6 CALO HV and LED monitoring Control CALO ECS meeting Anatoli Konoplyannikov [ ITEP / LAPP ] ECS LED control improvements Last time the LEDTSB projects were improved in sense of ERROR handling and more informative presentation of the status was added. Screen- short of the LEDTSB control panel defining flashing sequence. Device name appears when apply action is finished

7 ECS CALO LED Control SystemLED intensity HARDWARE 40 HV_LED_DAC boards are used for powering the ECAL/HCAL LED drivers and control LED light intensity. These boards are placed on chariot under detectors and four HCAL board on the electronics platform. For configuring LED intensity this hardware is included into HV control PVSS projects. lbCaloHv framework component has been developed and integrated into six calorimeter sub-detector HV projects. Photo of the ECAL-HCAL HV- LED intensity control board. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Eight connectors are used for powering LED drivers and control light intensity.

8 ECS CALO LED Control System Panel of the ECAL/HCAL LED intensity configuration (reachable from HV project) Panel of the PS/SPD LED intensity configuration (reachable from HV project) LED intensity control is performed from sub-detector HV projects. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ One channel settings Load settings from file

9 ECS CALO LED Control System Conclusion Additional information about LEDTSB operation could be found on LHCb twiki page: The standard DEFAULT recipe for LEDTSB has been created. This recipe has the LED triggering delay values optimized for PHYSICS settings of the Front-End electronics. For LED timing scan runs the dedicated recipe PHYSICS|TimeScan has been created too. The PHYSICS recipe for HV- LED intensity control boards has been created. This recipe is loaded in the same time with loading HV control values for CW bases. CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/