Eurocontrol ASAS / ADS-B Activities Getting Closer to Implementation Mr. Bo Redeborn Director ATM Strategies.

Slides:



Advertisements
Similar presentations
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Advertisements

1 The EPO Co-operation Programme to reorient patent information centres Heidrun Krestel European Affairs, Member States 4 October 2010.
The Just Culture Initiative
ICAO TEM/NOSS Symposium November 2005
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
The framework of the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
The European Strategic Safety Initiative NARAST and SEARAST Meetings Nov 07 J. Vincent, EASA Safety Analysis and Research Head M. Masson, EASA Safety.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Swedish National Board of Trade - Christer Arvíus MARS Group meeting Bratislava, Slovak Republic 10 – 13 October 2007 Christer Arvíus Chairman UNECE WP.6.
The Convention on Long-range Transboundary Air Pollution and EMEP (The Cooperative Programme for Monitoring and Evaluation of the Long-range Transmission.
EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH.
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Nigel Makins EUROCONTROL
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
EUROCONTROL European Organisation for the Safety of Air Navigation.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
The CASCADE Programme Validation Results ASAS TN2 27 September 2005 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL European Organisation.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Christos Rekkas ADS Programme Manager EUROCONTROL
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Progress under the Convention on Long-range Transboundary Air Pollution Twenty-ninth meeting of the Task Force on Integrated Assessment Modelling
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Workshop on preparations for ANConf/12 − ASBU methodology
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
Unique in Europe. Across Europe.
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Eurojust cases involving crimes against children
ICAO AMCP WG-M/1 meeting, December 2000
Ag.no.16 A65 country manuals and country assessments
Report on WISE Art.8 and GIS issues
Towards ASAS Implementation The Role of the CASCADE Programme
Programme adoptions Cohesion Policy:
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
EuroGroups register First results of measures on advancement
STEM Education Policies and Practices in Europe
The Convention on Long-range Transboundary Air Pollution
LAMAS Working Group June 2015
Presentation transcript:

Eurocontrol ASAS / ADS-B Activities Getting Closer to Implementation Mr. Bo Redeborn Director ATM Strategies

EUROCONTROL Mission To harmonise and integrate Air Navigation Services in Europe, uniform Air Traffic Management System aiming at the creation of a uniform Air Traffic Management System for civil and military users, in order to achieve the safe, orderly, expeditious and economic flow of traffic throughout Europe. (Article 1 of the revised Convention) TOWARDS A SINGLE PAN-EUROPEAN SKY

Towards a Common ATM Target in Europe Road Map & European Convergence and Implementation Plan (ECIP) Window of Opportunity Continuation of Current Plans Elaboration of Future Plans Target Concept & Architecture

ATM Strategy: Implementation Steps 2012 & beyond : redistribution of tasks (human/machine; controller/pilot); integrated air/ground systems; integrated planning and management Full Concept : optimised use of airports & airspace; accelerated integration of ATM information & systems; advanced support tools; airborne traffic situational awareness Accelerating Integration : capacity management; enhanced surveillance; increased support to controller Increasing Productivity Up to 2004 : focus on safety and capacity; airspace organisation; traffic flow management; human resources management; best practice Improving Capacity

STEP 2 Implementing the ATM Strategy STEP 4 STEP 1 departure clearance digital-ATIS oceanic clearance delivery Classical Radar ADS-B ground surveillance initial trajectory negotiation airborne traffic situation awareness spacing applications more flight info services more airborne parameters CASCADE STEP 3 transfer of control clearances microphone check Link basic and enhanced surveillance (heading, speed, selected flight level) Mode S SUR COM airborne separation applications trajectory negotiation autonomous separation Eurocontrol Domains Evolutionary SAFE change

EATM Organisation SD MIL Military ASR Agency Safety Regu- latory Unit BPS Business Planning & Support ESC European ATM System & Convergence HUM Human factors Management ATS Air Traffic Services AFN Airspace/Flow Management & Navigation SSM Safety & Security Management AEM Airports & Environment Management CSM Communication & Surveillance Management NET Network Capacity APT Airport Throughput SPR Sector Productivity SAF Safety Enhancement DIA Data and Information Analysis SIS Stakeholder Implementa- tion Service DAS Directorate ATM Strategies DAP Directorate ATM Programmes SD Senior Director Agency EATM Service Business Unit

ASAS/ADS-B in the EATM OCD

OATA Target CNS Architecture

The CASCADE Programme CASCADE –Cooperative ATS through Surveillance & Communications Applications Deployed in ECAC Goal –Implementation of Cooperative ATS for the Step 3 of ATM Approach –Redefine ATS tasks, roles and responsibilities to Improve pilot/controller and controller/controller task distribution (no bottlenecks) Optimise use of advanced automation (better planning, intervention by exception) Cascade AOC ADS-B CPDLC DFIS DAP

The CASCADE Programme AGC ADS CASCADE Cooperative ATS through Surveillance & Communications Applications Deployed in ECAC Programme Development Programme Pre- Implementation and Operations Validation Programme/ Implementation and Operations Planning Programme Implementation Co-ordination

Providing Gate to Gate Benefits Situational Awareness for Pilots and Controllers - traffic and vehicle surveillance - meteo: winds, turbulence, etc. - airport maps, taxi routings - intent and preferences New ATC instructions to redistribute ATC tasks REMAIN 8NM BEHIND TARGET Extensive use of automation potential - Use of aircraft trajectory information - Automation and extension of CPDLC

ATS BD ASAS Activities Operational Requirements –Package 2 and 3 Feasibility of future Packages Proposal for future Implementation Programmes Package II –Enhanced Package 1 Applications –ADS-B as sole surveillance means –Airborne Separation –Airborne Self-separation (low density) Package III –Enhanced Package 2 Applications –Airborne Self-separation

CSM BD ASAS/ADS-B Activities ADS-B support for Package 1 implementation Mobile Subnetworks capability analysis Mobile Subnetworks Roadmap Support to Package 2 Application development

Mobile Subnetworks Roadmap Capacity CPDLC Ph 1 VDL M2 ACARS AOA VDL M ES VDL M4 Arinc 623 CPDLC Ph 2 Capacity ADS-B Systems outside VHF band: Next Generation Satellite and Wide band Terrestrial Surveillance services Communication services 2003~2006>2010> >2010

International Standardisation Activities ICAO –OPLINP, SASP, ACP, SCRSP Eurocontrol –ODIAC, RFG, Action Plan 10 Eurocae –WG 51, WG 53 ETSI AEEC And more…

International Standardisation Coordination Annex 1 – Training Annex 2 – Rules of the Air Annex 4 - Charting Annex 10 – Aeronautical Telecommunications Annex 11 – Air Traffic Services Annex 13 - Aircraft Accident and Incident Investigation Annex 15 - Aeronautical Information Service PANS-ATM – Doc 4444 PANS-OPS – Doc 8168 PANS-ABC – Doc 8400 RNP Manual - Doc 9613

Package 1 Standards Coordination

ARTAS V7 ARTAS Conventional Radars (PSR, SSR, Mode S Elementary) Mode S Enhanced ADS-B Reports Conventional Broadcast Track Output New Format Broadcast Track Output Inter-ARTAS Cooperation CAT 1, 2, 34, 48 CAT 48 CAT 21, 23 CAT 30,31,32,252 CAT 62,63,65,252 CAT 62, 65, 252, 32 New Format Point-to-Point Track Output CAT 62,63,65,252,32 May 2003 Contract Signature July 2003 ARTAS V7 Specifications Dec 2003 ARTAS V7.0 Beta July 2004 ARTAS V7.0U (FAT) V7.0L (Beta) May 2005 ARTAS V7.1U (FAT) V7.1L (FAT) Phase 1Phase 2Phase 3 Oct 2004 V7.0L (Beta)

TIS-B Server

ADS-B/TIS-B Validation Testbed eCockpit A-SDPD EAT/EDEP MCS/eCockpit

Needs ECIP ATM2000+ Strategy Institutional Arrangements EATM Programmes Implementation & Operations European ATM Planning LCIPs Return from experience Implementation Planning Process Overview

ASAS/ADS-B ECIP Objectives Tentative: SUR05 –Implement ground-based surveillance of continental airspace and airports via ADS- B. From Under Development: ATC11 –Improve controller/pilot ATS task sharing effectiveness. From 2008.

Currently under discussion CRISTAL sites Trial/Study sites & areas FI GE AM AZ EE UA MD TR CY FR LV LT NL DE GB IE BY RO AL MK BG GR CH IT AT HU YU ES PT DK NO SE PL CZ MT BA MA DZTN SY IQ IR KZ RU LU SK SI HR BE FI GE AM AZ EE UA MD TR FR LV LT DE GB IE BY RO AL MK GR IT AT HU YU ES PT DK NO SE PL CZ BA MA DZTN SY IQ IR KZ RU LU SK SI CR CH CRISTAL countries BE NL Discussions planned The CRISTAL Trials

CoSpace Simulations

Airspace and Simulation Area RTS 1 non simulation area simulation area Frankfurt S&M Simulation

Conclusions Current Situation –Increased International Coordination –Stakeholders aligned on Package 1 –Validation on track –Focus on Implementation EUROCONTROL Committed to continue steering the ADS-B implementation

Eurocontrol ASAS / ADS-B Activities Getting Closer to Implementation Mr. Bo Redeborn Director ATM Strategies