TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, 26.05.2009Steffen Döbert.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
1 Accelerator R&D for Future Large Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
ESS DTL beam commissioning
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Luminosity expectations for the first years of CLIC operation CTC MJ.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CLIC Decelerator Instrumentation - Ideas and outlooks – non exhaustive - Erik Adli, July 9, 2008.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
TBTS Test Program & Schedule G. Riddone
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
The CLIC Decelerator Beam Dynamics 3rd CLIC Advisory Committee (CLIC-ACE) Erik Adli, CERN/University of Oslo, September 3 rd 2008 Lots of input by D. Schulte.
FP7: EuCARD after a year of preparation… A.Jeremie.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CLIC Parameter Working Group Two Beam Module Design
The Engineering Test Facility for nLC
Phase Feed-Forward Piotr Skowroński (CERN)
CLIC module working group
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
RF Power Generation and PETS Design
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
The CLIC Decelerator Beam Dynamics
LCWS 2017 – 26th October C. Rossi
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Advanced Research Electron Accelerator Laboratory
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert

Goals and Requirements o High energy spread beam transport, low losses (Bench mark simulations) o RF Power Production, Stability (End Energy <50%, 2.6 GW of RF power) o Alignment Active Quad alignment with movers (Test procedures for BBA, DFS) 100 microns pre-alignment for PETS o Drive Beam Stability, Wake fields (no direct measurement of the wake fields) o ‘Realistic’ show case of a CLIC decelerator o Industrialization of complicated RF components

TBL integration into CLEX

TBL cell

Status Installation of prototype beam line completed, waiting for beam (3 Quads on movers, 3 BPM’s and 1 PETS tank with undamped PETS) Beam line without PETS tanks will be finished this fall Prototyping: PETS tank: engineered and manufactured by CIEMAT (low level measurements performed and accepted) BPM’s: smaller version of CTF3 type BPM, made by IFC Valencia Electronics from UPC Barcelona and LAPP Annecy ( basic tests with beam done) Quads: Designed at CERN and manufactured by BINP Russia Quad-Movers: engineered and manufactured by CIEMAT (tests demonstrated the micron level accuracy)

TBL prototype beam line spring 2009 Beam line girders First part, prototype module

PETS tank assembly at CIEMAT Happy Team after finishing the first tank

TBL prototype beam line spring 2009 BPM, Quad Mover, Quad, PETS-tank

The current plan for TBL Due to the long lead time to produce the PETS structures TBL can’t be completed before 2011 Organize and launch production of at least 7 more PETS with our collaborations to be commissioned with beam in Approach: parallel fabrication at CIEMAT and CERN using multiples vendors CDR demonstration measurement milestones at the end of 2010 Assuming continuous production with two vendors in parallel TBL could be completed in 2011 profiting from first series experience Second batch has to be launched early 2010 Full demonstration of drive beam decelerator end of 2011

Status of series production (batch of 8) Market survey for PETS bars launched MS-3642/BE/CLIC Specification meeting Call for Tender Closing of Tender Pre series, October PETS installed in CLEX, August 2010 ! We still have not identified the damping material to be used in the PETS

What can we expect in 2010 for the CDR Unlikely to install more than 8 PETS until mid 2010 Can we declare feasibility with only 8 PETS ? 8 PETS only E 0 = 130 MeV I=28 A Eff = 33 % (was 65% for 16) 1.2 GW of rf power E 0 = 100 MeV I=28 A Eff = 42 %

TBL beam dynamics 1m ~ 3 ns

TBL versus CLIC TBL CLIC

TBL versus CLIC – quad kicks Effect of  quads = 20  m CLIC: r c = 16 mm TBL: r c = 2.1 mm Precise quadrupole alignment is also required for the TBL.  quads = 20  m leads to small increase in beam envelope while  quads = 100  m implies that BBA might be required  TBL with  quads = 100  m

TBL versus CLIC – transverse wakes Effect of  PETS = 100  m CLIC: r c = 0.6 mm TBL: r c = 0.5 mm Precise PETS alignment (100  m) is also required for the TBL Transverse wake amplification CLIC Transverse wake amplification TBL 

A 3-sigma transport through TBL looks like a difficult task, but if we come close to it, it will be a great step towards proving feasibility of the CLIC decelerator Energy, Current issues Maximum beam size after 16 PETS for different energies and currents

TBL diagnostics What can we measure in TBL: Power production: Energy balance % level, rf-pulse stability (amplitude % level, phase ~1 deg order of magnitude worse than needed in CLIC) Efficiency: Low loss beam transport % level Transverse Phase Space: Beam size, Emittance; 10 % level Energy spread compared to simulation: %-level Time resolved energy spread: 10 ns Longitudinal profile: streak camera; ps-level Is this sufficient ?

Experiments with TBL in 2009 Evaluation of PETS tank prototype with beam and high power (Ideal: produce > 100 MW = 24A) Produce > 20 A drive beam (~ 80 MW) Resolution measurement of BPS (5 microns specified) Beam based quad alignment with mover (5 micron level) Commission beam line and diagnostics Transport beam with 2 or 3 PETS installed Measure beam properties, transverse and longitudinal

Experiments with TBL in 2010 for CDR Produce nominal 28 A beam and nominal CLIC power (135 MW) with at least 8 PETS and 100% transmission (120 MeV from CTF3) This corresponds to 35 % power extraction Beam based quad alignment with movers to optimize transmission and transverse beam parameters Detailed energy and energy spread measurements to verify deceleration. Streak camera measurements before and after TBL Monitor rf power production stability, amplitude and phase (% level in amplitude, 1 degree in phase) Measure beam properties and compare with simulations Controlled misalignment of quads, measure effect ? Controlled beam offset in PETS, measure effect ?

Conclusions and Outlook TBL with 8 PETS for 2010 possible but on a tight schedule Basic set of measurements possible for CDR with a reduced scope Impressive set of hardware for power production Important exercise towards a CLIC decelerator Some more reflection and simulations needed for the experiments Very nice effort of the CTF3 collaboration Finish up TBL with 16 PETS and demonstrate stable operation, complete measurements (end of 2011) Emerging plans to use TBL for power production in TDR phase