The Trigger and Data Acquisition System for the KM3NeT neutrino telescope Carmelo Pellegrino Tommaso Chiarusi INFN - Sezione di Bologna VLVnT 2015 | Rome,

Slides:



Advertisements
Similar presentations
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
Advertisements

Tsunamis Detection The Mission  Tsunamis Detection can help to minimize loss of life and property from future tsunamis. Mission Introduction Mechanism.
Kay Graf University of Erlangen for the ANTARES Collaboration 13th Lomonosov Conference on Elementary Particle Physics Moscow, August 23 – 29, 2007 Acoustic.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. The Power of Data Driven Triggering DAQ Topology.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
KM3NeT IDM/TeVPA conference 23  28 June 2014, Amsterdam, the Netherlands Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
CEA DSM Irfu The ANTARES Neutrino Telescope A status report Niccolò Cottini on behalf of the ANTARES Collaboration 44 th Rencontres de Moriond February.
Piera Sapienza – VLVNT Workshop, 5-8 october 2003, Amsterdam Introduction and framework Simulation of atmospheric  (HEMAS and MUSIC) Response of a km.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
ANTARES  Physics motivation  Recent results  Outlook 4 senior physicists, ~5 PhD students, ~5 technicians M. de Jong RECFA 23 September 2005.
KM3NeT International Solvay Institutes 27  29 May 2015, Brussels, Belgium. Maarten de Jong Astro-particle and Oscillations Research with Cosmics in the.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Disk WP-4 “Information Technology” J. Hogenbirk/M. de Jong  Introduction (‘Antares biased’)  Design considerations  Recent developments  Summary.
Online Reconstruction used in the Antares-Tarot alert system J ü rgen Brunner The online reconstruction concept Performance Neutrino doublets and high.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
NESTOR SIMULATION TOOLS AND METHODS Antonis Leisos Hellenic Open University Vlvnt Workhop.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
CEA DSM Irfu Reconstruction and analysis of ANTARES 5 line data Niccolò Cottini on behalf of the ANTARES Collaboration XX th Rencontres de Blois 21 / 05.
The ANTARES detector: background sources and effects on detector performance S. Escoffier CNRS Centre de Physique des Particules de Marseille on behalf.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The ORCA Letter of Intent Oscillation Research with Cosmics in the Abyss ORCA Antoine Kouchner University Paris 7 Diderot- AstroParticle and Cosmology.
KM3NeT – ORCA Measuring Neutrino Oscillations and the Neutrino Mass Hierarchy in the Mediterranean Sea J. Brunner CPPM.
Florida Institute of Technology, Melbourne, FL
Status of Control Unit Software Cristiano Bozza – 26/8/2015.
Disk Towards a conceptual design M. de Jong  Introduction  Design considerations  Design concepts  Summary.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Online Control and Configuration KM3NeT Design. KM3NeT Detection Units VLVnT2011 S. Anvar, CEA Irfu Saclay – KM3NeT 2.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
LM32 DEVELOPMENTS ONGOING WORK ON TDCs AND OTHER ISSUES (LM32) Diego Real David Calvo CLB group online meeting, 27 March
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
G. Larosa, M. Ardid (for the KM3NeT Consortium) Institut d’Investigació per a la Gestió Integrada de les Zones Costaneres - Universitat Politècnica de.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
A proposal for the KM3NeT Computing Model Pasquale Migliozzi INFN - Napoli 1.
Generic and Re-usable Developments for Online Software Slow Control, Configuration, Data Format & Online Processing Shebli Anvar, CEA Irfu January 12,
GPUs in HEP INFN Pisa & Physics Department of Pisa 1 Parallel Neutrino Triggers using GPUs for an underwater telescope KM3-NEMO Bachir Bouhadef, Mauro.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
WPFL General Meeting, , Nikhef A. Belias1 Shore DAQ system - report on studies A.Belias NOA-NESTOR.
Pre-Production Models for KM3NeT
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
Deep-sea neutrino telescopes
“FPGA shore station demonstrator for KM3NeT”
Pasquale Migliozzi INFN Napoli
Robert Lahmann VLVnT – Toulon – 24-April-2008
T. Eberl for Robert Lahmann and the Erlangen acoustic group
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Bachir Bouhadef, Mauro Morganti, G. Terreni (KM3-Italy Collaboration)
Els de Wolf 20 February 2012, Catania
Acoustic Position Calibration of the KM3NeT Neutrino Telescope
Controlling a large CPU farm using industrial tools
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
Systematic uncertainties in MonteCarlo simulations of the atmospheric muon flux in the 5-lines ANTARES detector VLVnT08 - Toulon April 2008 Annarita.
Characteristics of Reconfigurable Hardware
Presentation transcript:

The Trigger and Data Acquisition System for the KM3NeT neutrino telescope Carmelo Pellegrino Tommaso Chiarusi INFN - Sezione di Bologna VLVnT 2015 | Rome, September |

2 KM3NeT: one experiment, two sites Astronomy Research with Cosmics in the Abyss (ARCA) Oscillation Research with Cosmics in the Abyss (ORCA) 115 strings in the French site vertical spacing: ~6 metres 2 x 115 strings + 8 towers*-deep core in the Italian site vertical spacing: 36 metres The common element is the Detection Unit (DU): vertical structure hosting 18 Digital Optical Modules (DOMs, talk of D. Real) each one equipped with 31 3” PMTs and 1 piezo acoustic sensor for the positioning system. *Talk by M. Favaro in this session

Control Unit (Slow Control) “Broadcasting” WR Switch Receiving Switch Infrastructure TriDAS Core (Fast Acquisition) TDC, Acoustic, Monitoring Slow Control and WR PTP optical splitting of downward SC stream (broadcast) Shore Station Transport Protocol: UDP for both SC and Fast Acquisition 3 Sea network Broadcast fibre Network infrastructure Asymmetric network layout DOM uplink fibre

4 Data throughputs Optical data Acoustic data ARCA (230 strings) (Gbps) (ORCA equivalent) ARCA (230 strings)

Time-slicing performed off-shore by DOMs Frame i Frame i+1 Frame n Frame... TS i TS i+1... TS n Time ΔTS: O(100 ms) A DOM frame contains all data from its 31 PMTs occurring in a TS Frame i Frame i+1 Frame n Frame... DOM k DOM N One full optical TS (data from all the detector) is sent to a specific filtering process (see ahead...) Time-slicing 5 Frame i Frame i+1 DOM j Frame i Frame i+1 Frame n Frame... DOM 1 Frame n Frame... ΔTµ: O(1 µs) ΔTS >> ΔTµ Probability of a muon split into 2 TS < 10 -5

Trigger and Data Acquisition System (TriDAS) 6 On-shore computing Off-shore elements

The DataQueue (DQ) is the software component of the TriDAS which provides the data aggregation and distribution layer for both acoustic and optical data. DataQueue Read-out of the data frames (UDP) from a predefined number of CLBs Reassembling of the Time Slice (TS, which is compiled by the off- shore electronics) Distribution of the TSs to the proper DataFilter 7

Route the data collected from all DQs referring to a precise Time Slice to the very same oDF. Acoustic data must be sent in a continuous stream, addressing all data from one DQ to a single aDF. Optical WorldAcoustic World DataQueue: Two flavours 8 If needed more Filtering Power, just add it!

The main task of the optical DataFilter (oDF) is to reduce the data-stream coming from the DOMs' PMTs by selecting events that are interesting for physics analyses. Apply trigger algorithms that find space-time correlations between hits. Keep a buffer of raw data for dumping in case of an external alert (follow-up trigger, e.g.: GRB...) Send data to the Data Writer Optical DataFilter 9

Detection a im Topologica lTrigger Simple Causality Trigger Sky Scan Trigger Tracking Stack- Analysis Vertex / Inertia muon ✔✔✔✔✔✔ showers ✔✔✔✔✔ slowly moving particles ✔✔✔✔✔ sources ✔✔✔✔ Other algorithms are under development... Filtering algorithms B. Bakker Thesis, Trigger studies for the Antares and KM3NeT neutrino telescopes, Nikhef Overall throughput reduction factor ~10 -4

The DataWriter collects the filtered data coming from the various oDFs and performs write operation on permanent storage media in a ROOT compatible data format. DataWriter 11

The acoustic DataFilter (aDF) performs online calculation of the Time-Of-Arrival (TOA) of the acoustic signals emitted by the ground-based acoustic beacon array. Calculate the TOA using the data from all the sensors (piezo + hydrophone) collected on-shore by a DQ Send data directly to the DB Writer Acoustic DataFilter 12 Talk by F. Simeone yesterday in the C session

Control Unit The CU controls the offshore detector and the onshore processes via a Finite State Machine Talk by C. Bozza in this session 13 The Control Unit (CU) is composed of 4 elements: Master Control Program (MCP): –Controls the Detector Manager, the Database Writer and the TriDAS Manager Detector Manager (DM): –Performs complete configuration of the CLBs (PMT HV, instruments, etc…) –Records all parameters and the occurring events –Provides online monitoring of sensible parameters/measurements –Controls the power system TriDAS Manager (TM): –Operates the TriDAS core computing farm DB Writer –Performs write operation to the remote Data Base

Monitoring Tools: ROyWeb, Rainbow Alga, ROyFit Python-based web server Python and C++ API classes Demo - Restless Oyster Web reached a usable status Rainbow Alga prototype ready to be used, but put on hold for now ROyFit is still in a redesign phase 14 Talk by T. Gal in this session

Conclusions KM3NeT will perform continuous data taking for at least 20 years in two sites, reaching a total throughput up to 500 Gbps per site; challenging techniques: Multi-PMT, Asymmetric network, Hybrid WR; the TriDAS has been designed to be modular and to scale with a growing up detector; it will be tested very soon, after the deployment of DU-1 in the Toulon site and of DU-2 in the Capo Passero site. 15

Thank you for your attention!