Request for a Major Variance from the Neuse Riparian Area Protection Rules LBJ/Cary Associates, LLC Daycare facility Cary, NC January 8, 2014.

Slides:



Advertisements
Similar presentations
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Advertisements

Conservation Area Impact Permit Request Vf Horizon Investments, LLC District 1 July 16, 2013 Environmental Protection Division Environmental Protection.
TA Environmentally Sensitive Areas. Current Features: 1.Floodways, 100 yr 2.Floodplain, outside floodway, 100 yr 3.Jurisdictional Wetlands 4.Stream.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
________________________________________________________________________________________________________________________________________________________.
Final Plat Amendment for Kings Ranch
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Opposition to Proposed Building Height Variance in Case No. VA
Green Infrastructure Network Design Analysis Beaufort County, North Carolina.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Conservation Area Impact Permit Modification and Transfer Request DFD ONE, LLC Environmental Protection Division September 22, 2015.
Appeal of the Environmental Protection Commission’s Decision to Deny an After- the-Fact Waiver Request to Section (b) (side setback) for a Boat.
Board of County Commissioners PUBLIC HEARING June 9, 2009.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
Neuse River Basin Provided by Dr. D. Monreau to Dr. G
Board of County Commissioners PUBLIC HEARING June 24, 2008.
Board of County Commissioners PUBLIC HEARING January 13, 2009.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
FALLS LAKE NUTRIENT MANAGEMENT STRATEGY ( New & Existing Development Requirements) UNRBA BOD Meeting May 18, 2011 John Huisman – NC Division of Water Quality.
What are Property Rights? 1.What is Property Ownership? 2.The bundle of sticks: a.The right to occupy the property b.The right to exclude others c.The.
City of Talent VAR Suncrest Homes Planning Commission October 22, 2015.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Appeal to the Decision of the Environmental Protection Commission Mark Kassar November 11, 2008 Environmental Protection Division Environmental Protection.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
June 5, 2007 BCC CALLED PUBLIC HEARING ON BZA # VA , 4/5/07 APPLICANT: ICP Land Partners, LLC.
Community Development Department APPLICATION 2922 VARIANCE TO REDUCE LANDSCAPE BUFFER.
Conservation Area Impact Permit Request VF Horizon Investments, LLC - Seidel Road Realignment District 1 August 5, 2014 Environmental Protection Division.
 Consolidated Buffer Mitigation Rule 15A NCAC 02B.0295 January 7, 2015.
May 13, Site - USGS Topo SITE Source: 2013 Oriental USGS 7.5-minute Topographic Map.
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
permitting.
BOR Real Property Conveyances and Restrictions Anita Bain, Director Natural Resource Management Division August 18, 2006 Anita Bain, Director Natural.
Longhorn Steakhouse Variance Request Applicant has requested a variance to the Land Development Code watershed regulation that restricts impervious cover.
John Huisman – NC DWQ NC Water Quality Commission – January 11, 2012 NC Environmental Management Commission – January 12,
Charlotte Mecklenburg Utilities’ Request for Modification of Interbasin Transfer Certificate HEARING OFFICERS REPORT and RECOMMENDATIONS Toya Ogallo Division.
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
March 9, 2016 Request for a Major Variance from the Neuse Riparian Area Protection Rule R L Properties, LLC Parkway Pointe Office Park - Lot 5 Center.
Request for a Major Variance from the Neuse Riparian Area Protection Rules    Novo Nordisk Pharmaceuticals, Inc Powhatan Road Clayton, NC July.
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Ernest Floyd Foster Foster Seafood 70 Captain Tom’s.
Department of Environmental Quality Division of Water Resources
November 9, 2016 Request for an After-the-Fact Major Variance from the Neuse Riparian Area Protection Rule Belinda Keever 8005 Falling Leaf Court, Raleigh,
VR-SBK Rear Yard Setback 2 Felshire Lane Medeiros Property
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Harshavardhan Tummalpally 5201 Trinity Road Raleigh, NC January.
Request for a Major Variance from the Randleman Lake Water Supply Watershed Riparian Area Protection Rules    Blue Diamond Investment Company, LLC Kernersville.
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Mohamed Ali and Reem Darar 734 Old Pamlico Beach Road.
Request for a Major Variance from the Randleman Lake Water Supply Watershed Riparian Area Protection Rules    Blue Diamond Investment Company, LLC Kernersville.
Request Permission to Proceed to the EMC for Approval of Delegation of the Neuse Buffer Program to the Town of Hillsborough.
May 10, 2017 Request for a Major Variance from the Tar-Pamlico Riparian Area Protection Rule Peter Warlick 74 Northpoint Road, Ocracoke.
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Jeffrey Gunter 7701 Greentree Court Raleigh, NC March 12, 2014.
Dane County Farmland Preservation Plan Planning Areas
Preliminary Draft 2019 Operating and Capital Budgets
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    LBJ/Cary Associates, LLC Daycare facility Cary, NC Karen Higgins.
Consolidated Buffer Mitigation Rule 15A NCAC 02B .0295
Environmental Management Commission January 2014
Department of Environmental Quality Division of Water Resources
Request Permission to Proceed to the EMC for Approval of Delegation of the Neuse Buffer Program to Johnston County and Delegation of Further Approval Authority.
Environmental Protection Division
12 A: 113 Crestview Circle Variance Request City Council June 18, 2018
Presentation transcript:

Request for a Major Variance from the Neuse Riparian Area Protection Rules LBJ/Cary Associates, LLC Daycare facility Cary, NC January 8, 2014

Site – Topo 2 SITE Source: 2013 Cary USGS 7.5-minute Topographic Map

Site –Soil Survey 3 SITE Source: Natural Resources Conservation Service Wake County Soil Survey Map

Site Setting 4 Source: Wake County GIS

Lot 5 Source: Wake County GIS

6 Upstream Downstream

Stream and Buffer 7

Site Plan – March 2013 Proposed Impacts: Zone 18,047 sqft Zone 27,140 sqft 8 Stormwater Plan Use existing stormwater wetland Mitigation Required 8,047 x 3 = 24,141 7,140 x 1.5 = 10,710 Total = 34,851 Mitigation Proposed Bank Credits = 34,851

Site Plan – January Proposed Impacts Zone 18,047 sqft Zone 27,140 sqft Mitigation Required 8,047 x 3 = 24,141 7,140 x 1.5 = 10,710 Total = 34,851 Mitigation Proposed Bank Credits = 34,851 Stormwater Plan Will be approved by the Town of Cary

Findings of Fact  Pursuant to 15A NCAC 02B.0233 (9)(c), the Division of Water Resources makes the preliminary finding that the major variance request demonstrates the following:  practical difficulties or unnecessary hardships are present,  the harmony and spirit of buffer protection requirements are met, and  the protection of water quality and substantial justice have all been achieved. 10

Findings of Fact - (9)(a)(i)  Practical difficulties or unnecessary hardships are present: The applicant cannot make reasonable use of the property without impacting the protected riparian buffer. The hardship results from the application of this rule rather than from other factors. The hardship is due to the physical nature of the applicant’s property. 11

Findings of Fact - (9)(a)(i) The applicant did not cause the hardship by knowingly or unknowingly violating this Rule. The applicant purchased the property on June 1, 2004, which is after the effective date of this Rule. The hardship is unique to the applicant’s property. 12 x

Findings of Fact - (9)(a)(ii)  The variance is in harmony with the general purpose and intent of the State’s riparian buffer protection requirements and does preserve its spirit.  In granting the variance, water quality has been protected and substantial justice has been done. Findings of Fact - (9)(a)(iii) 13

DWQ Recommendation  The Division recommends that the Water Quality Committee approve this Variance request with the following conditions:  Mitigation Provide mitigation for the proposed impacts by purchasing 34,851 buffer credits  Stormwater Management Plan (SMP) Provide one copy of the approved SMP, including plan details on full-sized plan sheets, with proof of the Town of Cary’s approval 14

Questions? 15