MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
MPS External ReviewMarkus Zerlauth September 2010 Magnet Powering System Magnet powering and Protection Commissioning of Powering Protection Systems Failures.
PIC configuration (maskable/unmaskable circuits) I. Romera MPP meeting –
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Failure mode impact studies and LV system commissioning tests
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Machine Protection backbone: Upgrades Session 5: Machine Protection and availability 5 th Evian Workshop – 2-4 June 2014 I. Romera Ramírez Acknowledgments:
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
B. Todd et al. 25 th August 2009 Observations Since v1.
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
 Software Tools for MPS Kajetan Fuchsberger MPP Workshop, 2013, Annecy Many thanks for input from M. Zerlauth, J. Wenninger, R. Schmidt, G. Kruk, V. Baggiolini,
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
LHC circuit modeling Meeting 2 March PSpice Electrical modeling of the various LHC circuits, as a tool to: Describe the ac behavior of magnets Better.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Injectors BLM system: PS Ring installation at EYETS
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
LV Safe Powering from UPS to Clients
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
MPS relevant changed during TS
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
V.Chareyre/H.Thiesen/I.Romera/M.Zerlauth
M. Zerlauth, I. Romera 0v1.
Machine Protection System Commissioning plans
1v1.
Review of hardware commissioning
SPS Injection BIS - Draft requirements
Presentation transcript:

MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1

MPS – Powering interlocks 37 Powering Interlock Controllers 1600 electrical circuits ~10000 superconducting magnets REMINDER: No critical upgrades during LS1, just relocation of 9 controllers in UL14/16 and USC55 MPP Workshop, 12 June 2015, I. Romera (TE-MPE)2

Commissioning status of magnet interlocks Powering test campaign – 5000 interlock tests executed during the Powering Tests to commission the SC circuits – Clients involved in the test: QPS, PC, CRYO, UPS, AUG and LASS – Most of the commissioning steps integrated in ACC_TESTING and validated using automated analysis tools in PMEA framework MPS commissioning during machine checkout phase – Commissioning steps described on the MPS procedure (EDMS ) – Verification that faults on the powering system are propagated to the BIS – Validation that each individual circuit can trigger a beam dump request to the BIS (through automated sequence to verify correct configuration, redundancy and timing delays) – All 32 BIS user interface boxes (CIBUs) have been electrically tested (in situ with BIS team) Powering interlock controllers reconfigured for RUN2 requirements – ESSENTIAL-UNMASKABLE: RB, RQD, RQF, RQX, RD1-4, RQ4-RQ10 – AUXILIARY-MASKABLE: RCS, RQT%, RSD%, RSF%, RQSX3, ROD, ROF, RCBXH/V and RCB% – NONE-NO_IMPACT: RCD, RCO, RQS%, RSS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)3

Non-conformities on electrical circuits Circuits superlocked and removed from the PIC configuration: – RCOSX3.L2: Open circuit (EDMS ) – RCOX3.L2: Open circuit (EDMS ) – RCSSX3.L3: Open circuit (EDMS ) – RCOSX3.L1: Open circuit (EDMS ) – RSS.A34B1: Short to ground in DSLC (LHC-MP3-EN-0005) Circuits repaired during LS1 and put back as AUXILIARY/MASKABLE: – RCBCHS5.L8B1 Circuits repaired but still having no impact… – RCO.A12B2 – RCO.A81B2 – RQS.R3B1 Faulty quench heaters => RQ4.R2 and RQ4.L8 are operating with 7 out of 8 heaters MPP Workshop, 12 June 2015, I. Romera (TE-MPE)4

Powering-related interlocks via software (1/2) Redundant opening of the 13kA EE switches through SIS – Implementation to request the opening of the 13kA EE switches via software to increase the reliability of the EE system – Exploits the existing interlock signals on PIC to monitor the status of the Quench Interlock Loop and force the opening of the EE switches – ECR which describes the motivation and details of the implementation (EDMS ) – Implementation ready and to be commissioned during TS1 Quench interlock loop – Main dipole circuits MPP Workshop, 12 June 2015, I. Romera (TE-MPE)5

Powering-related interlocks via software (2/2) QPS checks before beam injection through SIS – Mechanism to verify the healthy state of the QPS systems before beam injection – Observed during operation that QPS_OK signals can toggle and inhibit injection – Temporary solution was to mask the interlock on the SIS – QPS experts are investigating the problem and a possible solution Quench heater power supply monitoring through LHC Circuit SCADA (WinCC) – Monitors the status of the quench heater power supplies and removes the QPS_OK in case of circuit protection risk – Automatic mail notification warning about degraded situation does not work anymore MPP Workshop, 12 June 2015, I. Romera (TE-MPE)6

MPS – Fast Magnet Current Change Monitors 26 monitors in the LHC and SPS-TLs No critical upgrades during LS1, just relocation of RD1.LR5 monitor in point 5 and control system renovation in SPS-TLs MPP Workshop, 12 June 2015, I. Romera (TE-MPE)7

Commissioning steps described on the MPS procedure (EDMS ) – All 26 user interface boxes (CIBUs) have been electrically tested (with BIS team) – Validation of dump thresholds at nominal current with no beam – Commissioning steps integrated in ACC_TEST for status tracking FMCM commissioning (1/2) 2015 (6.5TeV equivalent)2012 (4TeV equivalent) FMCMInom (A)Itrip (A)ΔI/I (%)Inom (A)Itrip (A)ΔI/I (%)ΔI/I (%) limitConformity SR3.RD OUT OF RANGE SR3.RD IN RANGE SR3.RQ IN RANGE SR3.RQ IN RANGE SR7.RD OUT OF RANGE SR7.RD IN RANGE SR7.RQ IN RANGE SR7.RQ IN RANGE UA23.RBXWTVL IN RANGE UA23.RBXWTVR IN RANGE UA67.RMSD IN RANGE UA67.RMSD IN RANGE RD1.LR IN RANGE RD1.LR IN RANGE Comparison between relative current deviations on LHC monitors (2012 – 2015) - FMCMs thresholds have been set for 7TeV operation (for max ΔV scenario) - Therefore sensitivity at 6.5TeV equivalent current is higher than at 4TeV MPP Workshop, 12 June 2015, I. Romera (TE-MPE)8

FMCM commissioning (2/2) Verification of orbit deviations and beam losses (at injection and flat-top) with pilot beams – All FMCMs have been commissioned at injection (no need to precycle the magnets) – Most critical circuits (RD1s and RD34s) tested as well at flat-top as EOF test – Test consists in verifying the trajectory evolution after switching OFF the PC Test on Trajectory over 1024 turns at the same BPM with no visible changes on the beam orbit MPP Workshop, 12 June 2015, I. Romera (TE-MPE)9

Access Powering Interlocks Interlock that allows for short access with magnets powered at low current During LS1 a new PLC-based system has been installed in the CCR aiming to increase the dependability of the interface between the LASS and SIS System deployed and fully operational since May 2014 New Kontron computer installed in the CCR and FESA class to be deployed in TS1 Access Powering Interlocks MPP Workshop, 12 June 2015, I. Romera (TE-MPE)10 Courtesy of J.Wenninger

Validation of UPS distribution network Test campaign to validate the redundant UPS power distribution network for the LHC equipment systems (joint effort between EN-EL and TE-MPE) Tests carried out during the Powering Tests in all 8 LHC sectors including tunnel and service areas Important non-conformities on Machine Protection Systems – QPS: Some quench heater power supplies on same UPS (FIXED) – LBDS: LBDS2 Re-trigger crates connected to the same UPS (FIXED) – BPMs: Some BPM racks powered by normal network (PENDING) – ….. Full report available on EDMS Some tests already organised during TS1 to validate conformity of powering (e.g. LBDS1) MPP Workshop, 12 June 2015, I. Romera (TE-MPE)11

Summary MPS commissioning on powering interlocks successfully completed Experience during first weeks of operation was very positive and magnet interlock systems were successfully running with no major problems Interventions/tests scheduled during TS1: – Test of redundant opening of the 13kA EE switches through the SIS – Deployment of new FMCM FESA class to solve an issue with timestamping of PM buffers – Deployment of FESA class on a dedicated machine for the Access Powering Interlocks With regard to the UPS tests => It is highly recommended to follow the recommendations written in the test report and we urge equipment owners to follow with EN-EL the non-conformities related to powering MPP Workshop, 12 June 2015, I. Romera (TE-MPE)12

THANKS FOR YOUR ATTENTION! MPP Workshop, 12 June 2015, I. Romera (TE-MPE)13

FMCM thresholds on SPS-TLs 2015 (6.5TeV equivalent)2012 (4TeV equivalent) FMCMInom (A)Itrip (A)ΔI/I (%)Inom (A)Itrip (A)ΔI/I (%)ΔI/I (%) limitConformity RBI CNGS not used IN RANGE RBI CNGS not used IN RANGE RBIH IN RANGE RBIH IN RANGE RBI IN RANGE MSE6183M IN RANGE MST6177M IN RANGE RBIH IN RANGE MSE4183M IN RANGE MBB.6608M IN RANGE MBS.6600M IN RANGE RBI IN RANGE RBIH IN RANGE RMSI.L2B IN RANGE RBIH IN RANGE RMSI.R8B IN RANGE MPP Workshop, 12 June 2015, I. Romera (TE-MPE)14