NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX Team Meeting June 25, 2010 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
PCS Navigation D. Mueller January 26-28, 2010 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Non-axisymmetric Control Coil Upgrade and related ideas NSTX Supported by V1.0 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
Second Switching Power Amplifier (SPA) Upgrade Physics Considerations Discussion S.A. Sabbagh 1, and the NSTX Research Team 1 Department of Applied Physics,
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
Xp705: Multimode ion transport: TAE avalanches E D Fredrickson, N A Crocker, N N Gorelenkov, W W Heidbrink, S Kubota, F M Levinton, H Yuh, R E Bell NSTX.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
Development of Improved Vertical Position Control S.P. Gerhardt, E. Kolemen ASC Session, NSTX 2011/12 Research Forum Location Date NSTX Supported by College.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting December 4, 2008 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting –Masa Ono May 1, 2015 NSTX-U Team Meeting May 1, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
Implementation of a 3D halo neutral model in the TRANSP code and application to projected NSTX-U plasmas S. S. Medley 1, D. Liu 2, M. V. Gorelenkova 1,
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U Team Meeting August 14, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI NFRI KAIST POSTECH Seoul National U ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin NSTX-U Supported by

NSTX NSTX Team Meeting –Masa Ono August 15, 2014 Time: 1:30 ~ 3:00, August 15 (Friday), 2014 Place: LSB 318, PPPL General Items (10 minutes) Program Items (25 minutes) Upgrade Project (30 minutes) Engineering Operations (10 minutes) Research Operations (15 minutes) NSTX-U Team Meeting Agenda 2

NSTX NSTX Team Meeting –Masa Ono August 15, 2014 ES&H Issues (J. Levine) NSTX-U operational preparation activity (e.g., diagnostic installation) is commencing and we need to be extra cautious regarding safety! With nice spring weather, the outdoor activities could bring hazards - Proper protective clothing (e.g., long sleeve shirts and pants) - Mindful of Ladder safety - Gloves, mask, and eye protection - Watch out for bees and other insects Safely, Safely, Safely 3

NSTX NSTX Team Meeting –Masa Ono August 15, 2014 We had a challenge related the aquapour issue which caused a CD-4 delay of ~ 3 weeks. CD-4 in late February still allows scheduling of the research campaign up to 18 run weeks (Base – run weeks and Incremental – 2 run weeks). ~ 2 month period is allocated between CD-4 and the research plasma operation. The CD4 schedule is obviously getting very tight for planned research operation. Please make sure that you are ready for research operation by March 2015! Aiming for Extended Research Operation in FY15 Research operation preparation on going in parallel with Upgrade Project 4 Research Plasma Operation 12 – 16 Run Weeks Nov. 2014Dec. 2014Jan. 2015Feb. 2015Mar. 2015Apr. 2015May 2015Jun. 2015Sep. 2015Jul. 2015Aug 2015 Bakeout2 Run Weeks May 2015 ISTP/Co mm CD4 Run Plan for FY 2015