Catherine LeCocq, SLAC 09-27-06 Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.

Slides:



Advertisements
Similar presentations
Alexander Temnykh Cornell University, Ithaca NY, USA
Advertisements

Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
LCLS LCLS-II Survey & Alignment
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Sector 0 To improve the performance of FACET, sectors 2-6 and (a total of 900m beam-line) were realigned using the laser alignment system as their.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
The LCLS-II project consists of a new gun, a new superconducting linac, and new variable gap undulators. Civil construction will be at a minimum, and existing.
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Undulator System Installation
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Introduction [Documents and Parameters]
Undulator Assembly and Installation Planning
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
LCLS Undulator Magnetic Measurements
Presentation transcript:

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine LeCocq, SLAC September 27, 2006 LCLS Overview Undulator Component Alignment Tolerances Support Undulator Hall Construction Plan Assembly of Girders Plan Tunnel Installation Sequence Alignment Possibilities after Installation LCLS Overview Undulator Component Alignment Tolerances Support Undulator Hall Construction Plan Assembly of Girders Plan Tunnel Installation Sequence Alignment Possibilities after Installation

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,2 Linac Coherent Light Source Near Hall Far Hall SLAC LINAC Undulator Injector

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,3 Undulator Layout ParameterSymbolValueUnit min. fundamental wavelength r 1.5Å undulator period length u 3.0cm nom. undulator parameterK3.5 peak fieldB­ pk 1.25T undulator segment lengthLsLs 3.4m number of segmentsNsNs 33 full undulator lengthLsLs 132m nom. undulator full pole gapg6.8mm long break lengthLlLl 0.898m short break lengthLsLs 0.470m number of quadrupolesNQNQ 33 number of BPMsN BPM 33+3 From Heinz-Dieter Nuhn

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,4 One Segment- Wall Side

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,5 One Segment- Aisle Side

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,6 Physics Requirements The x-ray FEL process requires: 1.Straightness of the electron beam trajectory: 2 μm rms through the LCLS undulator system 2.Alignment of the individual undulator segment with respect to the beam axis: 80 μm rms vertically 140 μm rms horizontally

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,7 Quadrupole Alignment Tolerance Budget

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,8 BFW Alignment Tolerance Budget

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,9 LCLS Construction Support

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,10 Magnetic Measurement Facility Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) LCLS-TN-04-1LCLS-TN-04-1 "Requirements for the Construction of the LCLS Magnetic Measurements Laboratory“ by Z. Wolf and R. Ruland. LCLS-TN-05-4LCLS-TN-05-4 "Earth's Magnetic Field Measurements for the LCLS Undulators.“ by K. Hacker and Z. Wolf. 4/3/06: MMF Beneficial Occupancy 7/3/06: MMF Qualified & Ready to Measure Production Undulators.

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,11 Kugler Bench for Undulator Tuning Construction in 2 parts: 2.0 m and 5.5 m Test for qualification: Verification of flatness and straightness of guide beam using a bi-axial auto-collimator with a resolution of 0.05 µrad. Verification of probe location accuracy using interferometric measurements and wire to better than 1 µm over the travel range.

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,12 Undulator Measurement Steps from Zack Wolf, Head of the Magnetic Measurement Group 1)Place undulator 2)Mechanically align undulator to bench 3)Magnetically align Hall probe to undulator 4)Perform any required large gap adjustments and re-align 5)Straighten the X and Y trajectories 6)Minimize phase errors 7)Perform phase matching 8)Determine K vs X, move probe to the X value which gives the specified K 9)Add fiducialization magnets to undulator ends, locate center of fiducialization magnets 10)Move undulator to CMM, finish fiducialization LCLS-TN-03-07: “ANL and DESY Undulator Tuning Procedures“ by Z. Wolf. LCLS-TN-05-10: “Test of Coordinate Transfer from Magnetic to Mechanical Reference for LCLS Undulator Fiducialization.“ by Y. Levashov and Z. Wolf.

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,13 Leitz Reference Model CMM Facts: Measuring range is 0.9 x 1.5 x 4.5 m Weight capacity is 3000 kg Resolution is 0.1 μm Repeatability is 1 μm Test for qualification: Accuracy formula:1.5μm+d(mm)/350 Weight test (2400 kg) Magnetic test (50 Gauss)

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,14 Tunnel Installation Sequence Establish survey network in empty UH Mark bolt-hole floor positions for pedestals Align pedestals Align girder without undulator segment Map all girder components including undulator segment Measure with portable HLS and WPM Perform the required moves Final map & initialization of ADS: ready for BBA

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,15 Undulator Hall Monument Layout wall monuments (with removable spherical target) floor monument (with removable spherical target) 6’ 1‘ stay-clear From Brian Fuss

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,16 Tunnel Network Simulation sD = 30 μm sh = 30 μm / D sv =50 μm /D sdh = 50 μm sz = 22 μm sx = 47 μm sy =46 μm UH Tunnel Start STA ft m SLOPE UH Tunnel West Side Thermal Barrier STA ft m Undulator Hall Tunnel BTH Beam Dump 24” Vertical Penetration (approx. position)

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,17 Alignment Diagnostic System (ADS) Goal: Monitoring of X, Y Position of each Quadruple Roll, Pitch and Yaw of each Undulator Segment Component Monitoring ToleranceValueUnit Horizontal / Vertical Quadrupole and BPM Positions0.7µmµm Roll of Undulator Segment1000µrad Pitch of Undulator Segment16µrad Yaw of Undulator Segment30µrad Composition: 2 wires spanning the whole undulator hall 1 water level system

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,18 Resolution< 100 nm in X & Y Direction Instrument Drift < 100 nm per day Moving Range ±1.5 mm in X & Y Direction Accuracy0.1 % of full Scale Availability Permanent, no Interrupts Wire Position Monitor System (WPM) Hydrostatic Leveling System (HLS) Precision < 1  m Instrument Drift ~1-2  m / month Accuracy < 0.1 % of full Scale Capacitive Sensor Ultrasound Sensor Precision < 0.1  m Instrument Drift potentially no drift Accuracy < 0.1 % of full Scale Availability: 10 minutes settling period after movement X and Y can be measured Y can be measured Alignment Diagnostics System – Sensors Owner: Franz Peters Owner: Georg Gassner

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,19 ADS Installation - Hardware HLS Piping CPVC (FM4910) 2” and 1” schedule 40 Pipe is supported by Unistrut® to avoid sag Bellows Gortiflex® GF-100B Small: max length 2”, min 1” Long: max length 10”, min 2” Bracket Nickel plated steel, machined out of standard angle 0.5” thickness WPM Wire Stainless Steel Gold plated (0.5 mm diameter) Frequency 100KHz Weight 35 kg Tube Brass 10 mm diameter

Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,20 End of Presentation