TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
FAULT TYPE SELECTION Jeff Roberts April 6 and 9, 2005.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Distance Relay Specification WECC TSS January 23,2014 Amos Ang.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Motors & Motor Starters
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Composed By: Angel Aquino, Ph.D. Presented by : Mark Laufenberg, Ph.D. WECC Joint User Group February 10-11, 2015 Colstrip Acceleration Trend Relay Model.
Chapter 4 Synchronous Generators
Power System Analysis/ Power System 1 EEE 4113/ EEE 3131
Material used:  Tin  Lead  Zinc  Silver  Antimony  Copper  Aluminum.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Current Differential Relay Specification WECC TSS August 20,2014 Amos Ang.
Chapter 7 SYSTEM PROTECTION
EQUIVALENT CIRCUIT AND POWER EQUATION OF SYNCHRONOUS MOTOR
Chapter 11 AC Power Analysis
Motors in Power System Dynamics Studies John Undrill NATF - Dallas - June 2015.
PSRC Line Protection Subcommittee Working Group D4
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
KD Relay Application: Compensator distance relay that provides a single zone of phase protection for all three phases. It provides tripping for phase to.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Slide 1 Line Current Differential Application on Short Lines Presentation to SSCET October 26 th, 2012.
HydroFly: Flywheel Gavin Abo Nate Stout Nathan Thomas.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Announcements Read Chapters 10 and 11
Submitted to: Submitted by:
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Protection of Power Systems
Protection of Power Systems
Power System Protective Relaying-Part One
Power System Protective Relaying-Part Two
Lesson 18 Synchronous Motor Operation and Applications
Announcements Design Project has firm due date of Dec 4
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Protection of Power Systems
Western Electricity Coordinating Council
Percentage Differential Protection Prepared by Viren B Pandya
Protection of Power Systems
Proposal to Remove from Service the PV-COI RAS
Automatic Voltage Regulator
PRESENTED BY:AMOD SHAKYA. Power Circuit –connectoin with motor using contactor Control Circuit-using switch make a holding circuit.
Presented by: LADWP November 14, 2017
Series Capacitor Compensation
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Power Plants By: Stephanie Mercer.
Specifications Updates and Approval
Distributed Energy Resources (DER) Experiences at CenterPoint Energy
CMPLDWG Composite Model with Distributed Generation Approval
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
UNIT V STABILITY ANALYSIS 9
Power System Protective Relaying-Part One
CMPLDWG Composite Model with Distributed Generation Approval
Project WECC-0100 Update Reliability Subcommittee
Distance Relay Specification
Proposal to Remove from Service the PV-COI RAS
Andrew Christensen, SRWG Chair
Presentation transcript:

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 2 Agenda  Purpose  Background  Relay Model Specification  Next Steps

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Purpose  To get approval from TSS for model specification  To model relay behavior in powerflow and transient stability analysis  To model interactions between RAS / SPS and Protection relays  To facilitate transfer of information from System Protection to Transmission Planner  To satisfy the new TPL standards of modeling the actions of protection relays for compliance 3

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Background  Non-directional overcurrent relays were approved in a previous TSS meeting  M&VWG approved the specifications in December 2013  Increasing the functionality of the models that we have, then we can model the functions of these relays more precisely 4

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Relay Model Specification  Directional Sub-Model  Load Encroachment Sub-Model 5

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Directional Element Sub-Model  The directional element is defined by its characteristic angle shown in the figure 6

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Consideration for Electro- Mechanical Relays  Electro-mechanical relays do not have a setting to enter a characteristic angle  The way to translate the settings to the characteristic angle – Determine the angle between voltage and current at unity power factor for the relay connection used – Determine the angle that the current must shift to achieve maximum torque, normally this angle will be lagging the unity power factor – The angular shift in a lagging direction from unity power factor to maximum torque is the characteristic angle or angle of maximum torque on the R-X diagram 7

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Load Encroachment Sub-Model  Function is to prevent relay from operating when load current comes into the detection zone 8

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Modification to Existing Overcurrent Relay Models  To implement the directionality and/or load encroachment functionality to the existing overcurrent relays – Add the function of torque control which activates the overcurrent relay’s tripping function including the timer function after the direction and load encroachment have been evaluated 9

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Next Steps  Phase 2 – Modeling in the unbalanced phase environment 10

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Any Questions? 11