Irradiations at Birmingham cyclotron Procedure 1.

Slides:



Advertisements
Similar presentations
The Scientific Method:
Advertisements

BANANA PACKAGING FARM TO RETAIL NEXT GENERATION PACKAGING.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
Solar Bake Off. PROCEDURE 1.1 st person traces a flap in the top of the box. Use the ruler and marker to measure a 1½” border around the lid, on the.
AGFA’s Packing Plates Instructions The AGFA slide show will demonstrate how to pack plates securely to assure the plates will not be damage during shipment.
How to Make a Hot Air Balloon
Specification section 3.3
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
EPFL, Design and first Prototype for a B eam P ipe D istance M onitoring Safety Switch.
Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC Karlsruhe IEKP - Universität Karlsruhe (TH)
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.
How to build a small inexpensive low-tunnel hoop house.
TP4-ENERSOL-TD/PV double function
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
LINEAR MEASUREMENT.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Can Challenge Emily and Amina The Silver Demon. Materials.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Wood Construction CTC-375.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
1. Plastics. Properties of Plastics Good chemical and weather resistance Do not corrode or rust Long lasting Good insulator or electricity Easy to bend.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Workshop Sponsored by: Home Grown Food Rain Barrel for Under $40.
X-Ray Box Imran Awan Experimental High Energy Physics November 12, 2015.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
ROLLING Rolling is a process of reduction of the cross-sectional area or shaping a metal piece through the deformation caused by a pair of metal rolls.
Slump Molds Double Bowl Sphere. Slump Molds Drape mold o A form on which a piece of plastic material can be shaped o Types: Hump, slump and press.
How to build a small inexpensive low-tunnel hoop house
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
GSI, for the CBM Collaboration
Ladder Assembly All tools and jigs produced Glue dispensing works
Service channels between Tracker and PP1
Layout of Tools Tools must be laid out in definite order.
NOVA DESK RANGE.
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Designing a Solar Cooker
C.Clerc ILD session, ALCPG /03/2010
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Perforator process.
Louisiana Tech University
Template as part of temporary Services Support
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Making a simple steady hand game
Fasteners & Closures Objective 3.03.
Neutron guide Shielding Concept
Remove all labels from supplies and box
Single Detector Design
Presentation transcript:

Irradiations at Birmingham cyclotron Procedure 1

Carbon fibre frame + Al plate 2

Carbon fibre frame (0.3mm thick, mass = nn g) 3

Al plate (2mm thick; mass = xx g) 4

C fibre fame, taped to Al plate; small strips of kapton tape overlaid over frame and plate to avoid sensors slipping between the plate and frame. 5

Tools required 6

Fresh sensor from Hamamatsu envelope 7

Kapton tape, partly overlapped. One side sticky Both sides not sticky Both sides non- sticky 8

Sensor lying in cutout of frame (cutout =11mm sq while sensor is 10mm sq). 9

Sensors, placed in cutouts of 3x3 frame; held in place by double sided kapton tape, with sticky edge on C fibre frame. One side sticky (on frame) Both sides non- sticky, overlapping edge of sensor 10

Threads prevent sensors falling out of cutouts. 11

Ensemble placed in plastic bag for safe-keeping. 12

Nickel foils place in another 3x3 C fibre frame, in locations corresponding to those of the sensors. (for fluence determination). 13

Frame + sensors fixed to top lid of cold box. Nitrogen gas pipe L shaped perspex fixing pieces, screwed into box lid. Frames clip into these pieces. Spring clips 14

Frame + sensors fixed to top lid of cold box. 15 Cold box lid, upside down Incident protons Al plate downstream of sensors

C fibre frames, one for Ni foils and one for sensors, fixed to lid of cold box. Incident protons Sensors Ni foils 16

Frames fixed to top lid of box (side view; lid upside down) Beam collimator 17

Looking downstream, side view of frames, attached to lid of cold box. Lid of cold box sides of cold box Incident protons 18

Looking upstream, side view of frames, attached to lid of cold box. Al plate, downstream of sensors Nitrogen gas pipe Frame with Ni foils 19

Inside cold box: nitrogen inlet pipe + polystyrene packing. 20 Upstream window of cold box Length of pipe in cold box to ensure to cool nitrogen sufficiently.

Sensor frame with Gafchromic film attached. 21

Sensor frame with Gafchromic film after exposure to beam burst. Beam spot in HOME position Y_offset X_offset 22

Scale, sizes. 23