Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Overview of GRETINA I-Yang Lee Lawrence Berkeley National Laboratory GRETINA Auxiliary Detector Workshop Washington University January 2006.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Elton S. Smith University of Virginia October 25, Overview Bremsstrahlung Tagging Spectrometer and Photon Beam Review Elton S. Smith Jefferson Lab.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
The GlueX Experiment Curtis A. Meyer Carnegie Mellon University The GlueX Collaboration 8/23/10 1 GlueX Experiment 12 GeV electrons 40% lin. Pol. Uncollimated.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.
Experiment HUGS 2011 – Jefferson Laboratory Hussein Al Ghoul Department Of Physics Florida State University ᵠ.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
1 Charged Kaons at the Main-Injector Measuring |V td | with K +   + Peter Cooper, Fermilab March 26th, 2003 P5 Review. I.Experimental Technique. II.Activities.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Collaboration Meeting Alex Dzierba Indiana U March 16-17, 2001 at JLab 1.Progress since our last meeting 2.NSAC Issues 3.Preparing the Conceptual Design.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1. Progress Report Science of Confinement The spectroscopy of light mesons led to the quark model and QCD: mesons are quark-antiquark color singlet.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
The May 2010 GlueX Collaboration Meeting Curtis A. Meyer Carnegie Mellon University.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
XFEL In-kind Review Committee Meeting, 11 May 2009 Parliament British Museum XFEL clock and control system In kind contribution proposal Development and.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
The Lead Glass Detector Overview, Experience and Direction.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
Organization and Goals for the Workshop
Detector for GlueX JLab PAC 23 Jan 20, 2003 Beamline Hall D GlueX
CLAS12 First Experiment Workshop Report
Samples of Hall B Results with Strong Italian Impact
Preparations for a Lehman Review
Status, Misc Elton Smith Feb 21, 2003.
Preparation of the CLAS12 First Experiment Status and Time-Line
The PrimEx-I Experiment
Tagger Microscope Detector & Electronics Status
Presentation transcript:

Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003

GlueX Budget Proposal for FY03 Cardman suggests that we develop a budget proposal assuming a timely approval of CD-0 and Alternate strategy if approvals are delayed

ItemFY03FY04 Robotics and Electronics200 Data Acquisition and Trigger10 Computing26 Solenoid Refurbishment2520 Tagger (Guangliang)35 TOF shields and slab prototype45 Forward calorimeter Barrel calorimeter module (Vitaly)26535 Upstream Veto20 FDC10 CDC Fiber tracker53 Cerenkov Counter Civil Designer65 Total675234

ItemFY03FY04 commitments FY04 budget Robotics and Electronics200 Data Acquisition and Trigger10 Computing26 Solenoid Refurbishment Tagger (Guangliang)+ collimator35 50 TOF shields and slab prototype45 Forward calorimeter50 Barrel calorimeter module (Vitaly) Upstream Veto20 FDC1060 CDC25 Fiber tracker43 Cerenkov Counter Jlab staff70 Designer65 Total

Contract Status FIU: Contract awarded  JLab to purchase VLPC cassettes from Fermi UConn: Computer equipment ordered  Need iteration on drawings of active collimator IUCF: extension of present work approved IU: blanket order in place for electronics DAQ/Dartmouth: contract finalized(?)

Large ticket items SolenoidCD-0 Barrel calorimeterCD-0 CivilCD-0 Robotics facilitypurchased Forward calorimeterCD-0 CerenkovR&D required TrackingR&D required Taggerdesign?

We need clear definition of Front-end Signals (from Electronics Review)

Suggestions from electronics review Work on Front-ends  Tabulate specifications and requirements driven by the physics  Look at existing solutions (e.g. PHENIX, ATLAS, etc)  Prototype FE coupled with detector R&D.  To be developed are the vertex tracker, FDCs, CDCs (assuming barrel calorimeter finds an appropriate solution) Conceptual design of entire system including cabling, grounding, etc. Develop time distribution synchronization method DAQ: parallel event builder, L3 farm

Consider supporting personnel? JLab Cost sharing of post-doctoral positions

Actions and prerequisites

Discussion Large budget items require CD-0, unless exceptions are made to move them forward Any (small) R&D should certainly be supported by our budget allocation Support for manpower may be an effective way of using some of our funds  This will usually imply commitments for future years

Hall D Physicists Year SystemMan-yr Group Leader Proj Man7 Coordinator (Computing/DAQ) Proj Man7 DAQ Online Offline Level 3 Farm 1111Online4 Slow Controls Coordinator (Detector/Electronics) Proj Man7 Tracking Calorimetry 1111Calor4 PID Electronics 11111trig5 Beamline/tagger Beamline6 Total351013

Project phases and federal budget

Notes to Typical Project Phases Correlate with the Federal Bubget Process

Impact of budget profile on schedule Fiscal years Constant-effort budget continues thru FY03 * 10 CD-0 CD-1CD-4CD-2CD-3 Orig. schedule Constant-effort budget in FY02 * & O * Assumes increases beyond constant-effort in subsequent years.

Jlab R&D Budgets FY02 JunNovFebNotes Civil Construction0500 Solenoid0300 Dismantling and shipping Detector Tracking CDC120200Spending FY01 Tracking FDC0300Detector group Start Counter41400Spending FY01 Barrel Calorimeter Cerenkov Counter Forward Calorimeter55400 Time-of-Flight Wall2000 Computing160800latest request Electronics Draft MOU Photon Tagger04580Add 35K for Glasgow postdoc Assembly postdoc LQCD000Memo to Cardman, Gross Jlab designer000Request for 65k Total