S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
MDT PS DCS for ATLAS Eleni Mountricha
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Slow Control System at experiment D. Egorov Slow Control System at V. Shutov, D. Egorov, R. Nagdasev 1/15.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
PVSS an industrial tool for slow control
ATLAS MDT HV – LV Detector Control System (DCS)
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

S.Sergeev (JINR)

Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system  LV system  Gas system  Thermo-sensors

Only “CERN Standard” solutions PVSS II + JCOP framework as a basement for DCS development PVSS II is a SCADA toolkit for high level control system development  Visual programming (active pictures)  Object-oriented (data point)  encapsulation  inheritance  member fields  Event-driven  Events related to a change of a data point element (member field) value  Interpretive system  Language – some mixture of C, C++ and Pascal  Distributed system

 Straw tracker needs 4 HV (2 HV?) channels per view => 64 HV channels (32 channels)  Possible HV power supplies  CAEN HV modules A1832 – 12 channels, 6KV, 1 mA or A1535 – 24 channels, 3.5 KV, 1 mA  CAEN mainframe SY2527LC (up to 6 modules)  If Mainframe SY1527LC is used => could be shared with other sub-detectors

Windows PC OPC server PVSS II Windows or Linux PC Could be single PC TCP/IP COM/DCOM (TCP/IP) OPC client Ethernet

 Should be used Wiener power supply  Current per plain (view) ~3A  Wiener MPV 4008L could be used  4 channel per module => one unit per station  0V... 8V  5A  40W per channel  12bit control DAC, ADC  <10mV pp  Communication by TCP/IP, USB, CAN-bus

Windows PC OPC server PVSS II Windows or Linux PC Could be single PC COM/DCOM (TCP/IP) OPC client Ethernet Terminator CAN-Bus Interface (Quasar XXXX) CAN-Bus

 JCOP framework + CERN Gas working group  CERN Standard 2-component gas mixer  For safety (working in vacuum)  Up to 32 gas segments per view (???)  Two electric valves per plane (station???) with 2 flow meters to cut the gas in case of broken straw + manual valves to cut off the segment with the broken straw Open questions

 View (plane), 60 measurements in total, 0.5C  1 temperature measurement per cover on the bottom of the PCB (to measure gas and board temp)  1 voltage measurement per cover  4 temperature measurements for mechanics. There are 28 covers/view  Station  4 views  240 measurements/station (112 volt, 128 temp)  6 ELMBs  Detector  4 stations  24 ELMBs total

Windows PC OPC server PVSS II Windows or Linux PC OPC client Ethernet 4 stations CAN-Bus Interface (Quasar XXXX) CAN-Bus 6 ELMBs per station, 24 ELMBs in total, 4 CAN-bus branches Wiring is not clear, 8 ELMBs per station?

Any detector DCS has three trees  Hardware tree in terms rack-crate-board- channel. Used for geographical addressing of infrastructure units  Logical tree in terms detector-subdetector- station-plane-channel-parameter. Used for navigation in the detector view  FSM tree. Used to propagate commands from top layer to bottom layer and states from the bottom to the top. Usually it is similar to the Logical tree

NA62 Root Tracker Station1 View X LV HV1 HV4 Cover1 Cover28 Temp. Voltage LV Voltage Current Temp. HV Voltage Current Temp. Ramping Trip TO

Proposed states of the Straw tracker  DOWN, color – BLACK. All power supplies are OFF Available command – STANDBY  OFF, color – BLACK. Some power supplies are on. Available commands – STANDBY, DOWN  STANDBY, color – BLUE. All LV power supplies are ON, all HV power supplies are OFF Available commands – ON, DOWN  NOT_READY, color BLUE. ALL LV power supplies are ON, some HV power supplies are ON. Available commands – ON, DOWN  ON, color GREEN. ALL power supplies are ON. Available commands – STANDBY, DOWN  Error, color RED. Some power supplies are in TRIP state, overheating etc. Available commands – ON, STANDBY, DOWN, RESET(?)

 It seems reasonable at the beginning of the work to use individual Windows PC for Tracker DCS running PVSS system (UI manager, DB manager, Event manager, Distribution manager) and all OPC servers. This PC should provide access to all tracker GUIs.  After the development is finished it seems to be reasonable to port Tracker DCS to common DCS PC (both PVSS panels and servers. To be confirmed)  To avoid crowds at a single Central DCS PC screen we plan to run tracker GUIs (PVSS UI manager) at the tracker PCs leaving the PVSS system at the central DCS PC.  To allow simple maintenance the tracker panels, functions etc. should be converted to the JCOP framework component.