Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Lali Tchelidze Safety work package leader
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Proton Driven Plasma Wakefield Acceleration – AWAKE – Project
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Agenda : CLIC Civil Engineering and Services (CES) WG.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
1 1. Some recent views ( ) 2 Linac tunnel
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Outline Introduction Project organization AWAKE at CNGS
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
Introdcution to Workpackage/Activity Reflection D. Schulte.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
CERN AWAKE Project Status. Outline Introduction Project organization West Area and CNGS AWAKE facility studies Required input from the Collaboration Summary.
1 SLHC-WP5 Progress Contributions from I. Dawson, L. Nicolas (U Birmingham), S. Pospisil (ITU Prague) T. Kramer, B. Goddard, M. Benedikt, Helmut.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
O. Kester, NuSTAR annual meeting, 27/02/2013
Feasibility Study of the AWAKE Facility at CERN Edda Gschwendtner, Chiara Bracco, Brennan Goddard, Malika Meddahi, Ans Pardons, Elena Shaposhnikova, Helga.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
I. Bergevoet - Training preparation
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
CLIC / ILC Collaboration for CFS works
Plasma Wakefield Acceleration and a possible eP scattering Experiment MPP Retreat January 21, 2014 Allen Caldwell.
AWAKE proposals for BE/BI
Upgrade Strategy for the Experimental Vacuum Systems
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
LCLS Injector: Introduction D. H
Electron Beam Systems ETC and Methodology
Laser Und XFEL.EU Experiment
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2

Introduction Positive feedback after LoI to SPSC and CERN Research Board.  Deliverable: Conceptual Design Report  Timescale: by Autumn 2012  Includes detailed budget, CERN manpower and schedule plans for design, construction, installation and commissioning.  Setup CERN Project Structure to organize the CERN efforts for producing parts of the CDR that is under CERN responsibility. Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN3

Schematic PDPWA Layout Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN4

Introduction CERN Project Structure:  cross departments and groups – ‘Project Leader’ – Work packages (WP) Responsible: ‘Work package leaders’ (CERN person) – Inside work packages there are sub-work packages Responsibles: from institutes, CERN, etc.. – ‘Deliverables’ for each WP Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN5

Primary beam-line WP Chiara Bracco CERN Project leader: Edda Gschwendtner Project Management WP E.G. Experimental Area WP including Interface p/e/laser/cell Edda Gschwendtner General Services WP xxxCERN RP and Safety WP Helmut Vincke Plasma Cell & Laser WP Electron spectrometer WP Beam/plasma simulations WP Electron beam-line WP xxxCERN & collaboration RF gun WP xxxCERN & collaboration Layout, Integration Coordination WP Ans Pardons Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN6 Proposed PDPWA CERN Project Structure Secondary Beam Diagnostics WP xxxCERN & collaboration

CERN Project Reporting Line Primary beam-line WP CERN PDPWA Project Experimental Area WP including Interface p/e/laser/cell General Services WP RP and Safety WP Electron beam-line WP RF gun WP Layout, Integration Coordination WP Project Management WP A& T sector management (director: Steve Myers): Engineering, Beams, Technology Departments Injectors and Experimental Facilities Committee (IEFC) (Chair: Paul Collier) Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN7 Secondary Beam Diagnostics WP

Specification and engineering documents (EDMS) Project cost and schedule Resource planning and scheduling with groups and departments Quality control, documentation and final acceptance Safety file and safety officer Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN8 WP1: Project Management WP E.G.

Collection of geometrical, beam parameters, optical requirements and constraints Design of beam-line geometry and optics Specification of main, correction and switch magnet parameters, beam instrumentation Technical coordination of studies, construction, installation and commissioning of all systems Design of interface of different beam-lines (merging magnets, fast shutter, etc…) Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN9 WP2) Primary Beam-line WP Chiara Bracco

WP3) Experimental Area &Interface e/p/laser/cell WP Conceptual design of secondary beam-lines Specification of secondary beam instrumentation Specifications of shielding, dumps (with RP) Specification of interaction region p/e/laser/cell  Interface to all WPs Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN10 E.G.

Experimental Area Layout and Integration studies Specification of infrastructure needs Layout of shielding Layout of beam dump(s) Specification of handling devices Coordination of installation Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN11 WP4) Layout, Integration, Coordination WP Ans Pardons

WP5) General Services WP Cooling Ventilation Powering Electrical infrastructures Handling Transport Access Civil Engineering modifications Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN12 xxx

WP6) RP and Safety WP Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN13 Prompt dose rate study in accessible areas – Muons downstream the facility, design of dump and shielding Activation studies of equipment, air, ground water, … Evaluation and installation of RP monitoring Radioactive waste study and preferred material checks Helmut Vincke

WP7) RF Gun WP Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN14 Interface and close collaboration to CERN RF and laser groups and Institutes – Specification and design of RF structure, photocathode, high-frequency source, control system, diagnostics xxx

WP8) Electron Beam-Line WP Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN15 Collection of geometrical, beam parameters, optical requirements and constraints Design of beam-line geometry and optics Specification of magnets, beam instrumentation Close collaboration with RF Gun WP xxx

WP9) Secondary Beam Diagnostics WP Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN16 Interface and close collaboration with institutes – Electron spectrometer – Electro-optical sampling system – CTR Xxx

External Resources are Welcome! Clear need for expertise NOW for RP calculations and documentation – Need this to progress with dump line and EA design Clear need for expertise for specification of interaction regions p/e/laser/cell (beam parameters,…) Other documentation related to safety issues could be defined for collaborators – Safety folders, materials databases, radioactive waste study…

Planning LoI: Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN18 Phase IPhase IIPhase III Nov 2012 Q  2 yrs LS1 at CERN: LHC has highest priority  All groups are extremely busy CDR Preparation of experiment Running of experiment  CDR dead-line to be re-defined  Installation during 2013 not really realistic:  Cleaning and dismantling in TT61 could be done  Finding manpower  Full installation of beam-line should be done during non-LHC operation periods

Outlook 2012 (and 2013) CERN project structure is being setup – Clarification of WP leaders – Clarification of WP contents – Organizing activities of team of researchers coming to CERN Scope and deadline for CDR to agree (now) – Decide on alternatives between West Area and CNGS site or put both alternatives into the CDR? Main project deadlines to agree (now) Table of parameters to agree (now) Iteration with technical groups at CERN on schedule and costing Address key WP items needed for CDR Write-up of CDR Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN19

Questions which need rapid answers What are p+ (and e-) beam parameters at plasma cell? What are characteristics of laser beam – In order to design merging system What footprint is needed for PDPWA experimental hall? – Essential to be able to design beam-line and facility Is continuous access to laser/e- linac/plasma cell essential? What are RP constraints on spent beam? – Need to know shielding requirements to design dump line Will CNGS be available for conversion after 2012? – Either for using TT41 beam-line for PDPWA facility directly, or TT41 magnets, convertors etc. for TT61 – High-level strategic question, needs answer from CERN management What are main project deadlines? What is scope of ‘2012’ CDR? Lisbon Meeting, 22 June 2012 Edda Gschwendtner, CERN20