Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.

Slides:



Advertisements
Similar presentations
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Advertisements

Planning Permission Process and Procedures
USAID Africa Bureau EIA Procedures for Sub-Projects
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
November 7, 2013 Open House Manitoba Municipalities Modernization Act RM of Daly & Town of Rivers.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
Reshaping Trafford Council HALE LIBRARY BIDDERS PRESENTATION.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
Preparing for an inspection Do you have instruction to inspect Have you got terms and conditions Fees paid Access details confirmed Preparing for an inspection.
ADD NAME/TITLE HERE Report on the outcome of Harry Gwala Informal Settlements Constitutional case 02 June 2010.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
Lynne Welsh Massachusetts Department of Environmental Protection.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Rental Housing Response to the Recommendations of the FFC on Rental Housing National Department of Housing 7 August 2009.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Spring Workshop March 10, 2007 PowerPoint Presentation.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
1Your reference The Menu of Indicators and the Core Set from the South African Point of View Moses Mnyaka 13/08/2009.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
1 Planning 4A7 Design & the Built Environment Dept. of Civil, Structural, & Environmental John O’Connor.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
Moloto Road (R573) Safety Investigations
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Application for Zoning Amendment
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Presentation transcript:

Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing plan for MNGCWE 500

Feasibility and Review of Housing Plan MNGCWE 500 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) MNQUMA LOCAL MUNICIPALITY Gcuwa (Butterworth), Eastern Cape Tel: (047) Fax: (086)

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Approval by Council 2.10Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS BLMCBiodiversity Land Management Class CBACritical Biodiversity Area ECBCPEastern Cape Biodiversity Conservation Plan ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Mngcwe 500 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of eight Human Settlement Project feasibility reports for Mnquma Municipality. It is designed so that it can be part of a single document that includes the other seven projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11- 12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Unknown Property Description: Awaiting S.G. East London Title Deed Restrictions:Pending Enquiry at S.G. Office (See Annexure 2) Servitudes: None (See Annexure 3) Site Size:79.58 Ha The Mngcwe 500 project is a rural project located within Mnquma Municipality. Butterworth is located in the centre of the municipality along the N2 national road approximately 109 km East of East London and 101 km east of Mthatha, see Fig, Mngcwe is a rural village situated on the eastern boundary of the municipality between the Gcuwa and Kukotana rivers. It takes access via a gravel road approximately 8km off the N2 National road east of Butterworth, see Fig and

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 9 Locality Plan Figure 2.1.1

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 10 Aerial Photograph Figure 2.1.2

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 11 VISUAL SURVEY Figure No pictures we await pictures from Kantey and Templer

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 12

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 13 STATUS OF HOUSING PROJECTS AND WAITING LISTS subsidies have been proposed for Mngcwe. These units will comprise In-Situ upgrade onto existing rural plots. It is interesting that the amount of proposed subsidies in Mngcwe is significantly above the number of existing households. This suggests that there may be a surplus of proposed subsidies for the project. Housing waiting lists have been requested from the municipality and are still awaited for this project. The municipality only collects lists for beneficiaries when the project is ready for implementation. MNGCWE 500 Population (Mnquma SDF 2009)Not Specified Population (2011 Census 2011) 412 Ex. Units (Mnquma SDF 2009)Not Specified No. Households (Census 2011)106 Proposed Units (EC DHS)500 Waiting List (Mnquma LM)Awaited Figure 2.2.1Statistical Background

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land that in which the site is located is marked out on a general plan dated December, It appears to fall in an area that has never been surveyed and is not a former commercial farm, see Annexure 3. Further enquiries will be made to the S.G Office, Cape Town.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 15 Cadastral Layout Figure 2.3.1

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 17 Engineering (Kantey and Templer) Figure 2.4.1

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 18 ENVIRONMENT 2.5 There are no formerly protected areas in the area. The entire settlement is noted to contain endangered vegetation by the relevant SANBI mapping for the area. The area is dominated by formerly cultivated land. This land is most suitable for subsistence farming, see There are no wetlands or Critical Biodiversity areas, see Fig The Gcuwa River flows south of the settlement and does not impact the Human Settlement Project. Housing development needs to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). The expansion of: (i)jetties by more than 50 square metres; (ii)slipways by more than 50 square metres; or (iii)buildings by more than 50 square metres (iv)infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line. The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversty Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP. This must be ground truthed by a Botanist prior to commencing with the Human Settlement Project. BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas. The site is occupied with an existing settlement and small scale agricultural activities. It is unlikely that the site and its surrounds are CBA 2 areas. The site should be ground truthed by a botanist.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 19 Environment Figure 2.5.1

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 20 GEO-TECH 2.6 In terms of the geotechnical information available the following is extracted from a report by Outeniqua Geotechnical Services cc, Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 21 Geo-tech Figure Mncgwe The Site

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 Mncgwe is not well serviced when it comes to social facilities, see Figure One primary school is situated in close proximity to the settlement, while the other educational facilities are between 1.5km – 2km away from the site, see Fig There is no clinic in close proximity in the area, see Fig There are no police stations located nearby, servicing the area, see The population threshold in Mngcwe is too small to support the provision of a clinic or police station in the area. The people who will be benefiting from the Human Settlement Project are people who are currently residing in Mngcwe. This proposed Human Settlement Project will not require provision of additional facilities.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 23 Distribution of Social Facilities Figure 2.7.1

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The SDF does not make specific proposals for Mngcwe, however the village appears to be on cultivated land and suitable for subsistence farming. The Human Settlement Project does not contradict the proposals of the Spatial Development Framework.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 25 Current Spatial Development Framework Figure Mncgwe The Site

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates government interventions proposed in the various settlements as contained in the IDP There no projects envisaged to take place in the Human Settlement Project areas for the financial years 2013/2014 and 2014/2015.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 27 APPROVAL BY COUNCIL 2.10 Awaiting Council Resolution

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY There are adequate engineering services. (K&T to confirm) In Terms of ECBCP BLMCs that apply to CBA 2, settlements are not recommended. It is recommended that the site be assessed by a Botanist to ground truth the extent of CBA 2 on the site prior to commencing with the Human Settlement Project. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The project comprises 500 subsidy units onto existing rural plots, these may have to be reduced to match the number of existing beneficiaries. Awaiting beneficiary list from the municipality. There are no new social facilities required to support the proposed human settlements project. The Human Settlement Project is in line with the SDF. Awaiting Council Resolution from the municipality RECOMMENDATIONS The project is feasible, pending a technical assessment by a Botanist to ground truth the extent of the CBA 2 on the site. In light of this assessment it is recommended that the award of subsidies can proceed in Mncgwe.

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 29 ANNEXURE 1: OWNERSHIP PRINTOUT

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 31 ANNEXURE 2: TITLE DEED

MNGCWE 500 FEASIBILITY STUDY CNdV africa (Pty) Ltd13 March 2016 page 33 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM