17 Sept 2007 Analysis PC 18 Sept 2007 1 Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17.

Slides:



Advertisements
Similar presentations
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
Advertisements

1 Tracker Resolution Malcolm Ellis MICE Analysis Forum Meeting 15 th September 2005.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
1 Downstream scraping and detector sizes Rikard Sandström University of Geneva MICE collaboration meeting CERN.
18 June 2004AFC meeting1 MICE  functions and so on Work in progress…. Observation by Ulisse Bravar at CERN meeting that beam not matched in baseline (Proposal.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
M.apollonioCM17 -CERN- (22/2 - 25/2 2007)1 Single Particle Amplitude M. Apollonio – University of Oxford.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
Simulated real beam into simulated MICE1 Mark Rayner CM26.
30 June 2004MICE VC1 MICE  functions Since last VC report: –New Mike Green configurations for decreased spacing between focus and matching coils of 400mm,
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
1 Tracker Window & Diffuser Radius vs Scraping Aperture Chris Rogers Analysis PC 6th April 06.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
Timothy Carlisle, Oxford CM 28. Step 3 Matching Step 3  Step 3 rematched for 830 mm spool piece  Calc. B(z) & BetaFn with the following:  Minimize.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
17 June 2008PC Analysis PC Schedule 2008 Tuesdays alternate weeks 29 April  13 May  27 May (1 week before CM21)  17 June 1 July (JC away – can.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
2 Oct 2008PC We have only 1 hour today May need to be brief.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Re-tuning MICE June 1 st 2010 Tim Carlisle. Intro At the moment MICE coil currents optimized for: central Pz = 0 RF No LH2 want to rematch M1 & M2 in.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
15 June 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 1 June 15 June 28 June (JC away) CM27 7 – 10 RAL Let me & Yagmur.
(one of the) Request from MPB
MICE at Step IV without SSD
TOF Software and Analysis Tools
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
ANNUAL CALENDAR HOLIDAYS JANUARY FEBRUARY MARCH APRIL MAY JUNE
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
S M T W F S M T W F
January MON TUE WED THU FRI SAT SUN
1 - January - Sun Mon The Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
Calendar.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

17 Sept 2007 Analysis PC 18 Sept Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17 April Tue 1 May Tue 15 May Thu 24 May CM18: Plenary Session Friday 15 June 16:00 – 18:00 with phone connection Tue 10 July Tue 24 July -- cancelled – workers all away Tue 7 August – NuFact07 Tue 21 August Tue 4 September (JHC away) Tue 18 September Tue 2 October (Possible conflict) Sun 7 – Wed 10 October MICE CM19

17 Sept 2007 Analysis PC 18 Sept MICE Analysis Forum 18 September :30 GMT Ongoing / News JC - Meeting Schedule CR - Alignment of ISIS beam into MICE MR - Estimates of ISIS beam rates JC - effect of lumps of iron on magnetics of channel CR - Cooling in G4MICE RS - Cooling in G4MICE YT - RF bkgd rates MA - Diffuser MA - Amplitude analysis MA/JC - Timing wrt RF phase (Student results) JC/all - Steps I & II analysis (see Analysis PC ) CR - 6D cooling in Step 3 New / Recent topics JC - FC field quality requirements MA - A new phase space element analysis ?? MAC – 6D emittance calculations (added 21/8/07) UB – Match Coil currents for Step 2 ?? – G4BL beam through G4MICE simulation of STEP II – volunteer required (see next page) AOB

17 Sept 2007 Analysis PC 18 Sept We believe that Step II will quantify / help understand the beam How well can the tracker measure the beam momentum in Step II? Tracker resolutions have been studied for muons starting in solenoid -- some p t required to get useful p z resolution  p z > 6 MeV/c for p t < 10 MeV/c p z resolution versus p t from MICE note 90 It would be desirable to run a G4BL beam through a G4MICE simulation of Step II with real resolutions to understand what we can really do in Step II. This has never been investigated; it’s time to do this. Any volunteers?