S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
RF-Accelerating Structure: Cooling Circuit Modeling Riku Raatikainen
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Heat load study of cryomodule in STF
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Consideration of Baffle cooling scheme
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat / Cryogenics Summary and (Proposed) Conclusions T. Peterson 25 April 2008.
Review of Cavity Load Cases and relevant analysis L. Dassa and C. Zanoni feat. N. Kuder 08/02/2016.
Detail plan of S1-Global H. Hayano (KEK),
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
FPC Thermalisation Update Niklas Templeton 16/6/16.
The Evolving ILC Project
TDR guideline discussion on Cavity Integration
Stress and cool-down analysis of the cryomodule
T5.2: Harmonization - Material and Component Reference
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Crab Cavity HOM Coupler Specification Drawings & Tolerances
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Norihito Ohuchi – KEK (presented by P. Pierini - INFN)
5K or not? & TTF module thermal modeling update
Sensors in the S1-G Cryomodules (Updated )
Thermal Shield Connection Study
TTF module thermal modeling
TBM thermal modelling status
Cryostat 5 K Thermal Shield -- Conclusions (Proposed)
TESLA Cryomodule Design Ratinales
5K Shield Study & HL Measurements
ILC Cryogenics -- Technical Design Report Planning
Presentation transcript:

S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini

S1_Global: thermal analysis TILC09 2 Motivation Transient thermal modeling of the cooldown behavior of SRF cryomodules can be pushed to include many effects and seems to reproduce data from measurements with sufficient approximation –e.g. WEPD038 at EPAC08 for DESY data Models can be developed with increasing complexity as model refinement progresses –e.g. from “lumped” loads to realistic conduction paths, from convective film coefficients to heat exchange with 1-D fluid channels...

S1_Global: thermal analysis TILC09 3 from ANSYS FEA against DESY CMTB data T on 70 K shieldT on 5 K shield

S1_Global: thermal analysis TILC09 4 S1-Global The S1-Global will have many thermal sensor for the measurement of all heat loads to the cold mass (see Norihito talk), so it make sense to try now pushing our modeling capabilities and see where we end in the comparison –aim is not the load budget, but mainly temperature distribution –validate models and explore design variations more cheaply and rapidly (e.g. 5 K yes/no experiments) work in progress, benchmarking model

S1_Global: thermal analysis TILC09 5 S1-Global model Module C: 3D CAD simplified model –“heavy” defeaturing of nuts, bolts, fillets… Included components: –2 support posts –70 K/ 5 K shields (integrated cooling channels) –Gas Return Pipe (including cavity supports) –Invar rod (fixed at GRP, fixing cavity z pos) –Cavities in Helium tanks, separated by bellows –Simplified model for coupler conduction paths to shield and 2 K level Large use of frictionless “contacts”

S1_Global: thermal analysis TILC09 6 Thermal modeling Full non-linear material properties vs T Conduction –Explicitly modeled conduction path for the support of the cold mass through the posts –Couplers: simplified concentrated heat loads from tabular data at the different T intercepts Convection –In increasing complexity, first boundary T on pipes, then exchange through film coeff. (later) detail only relevant when cooling rate gets faster... Radiation –as a flux on cold surfaces, assuming MLI

S1_Global: thermal analysis TILC K shield

S1_Global: thermal analysis TILC K shield

S1_Global: thermal analysis TILC09 9 Post and invar rod Fixed invar rod position to GRP 300 K 70 K 5 K 2 K

S1_Global: thermal analysis TILC09 10 GRP and string support parts C-block for supporting cavity at pads (as frictionless contacts)

S1_Global: thermal analysis TILC09 11 Cavities (simplified) Connection to invar rod Beam pipe bellow (very soft component) Coupler port (Heat sink for tabular 2 K load...) Pads

S1_Global: thermal analysis TILC ° case: Static Loads Imposed boundary temperatures: –300 K at upper post surface –77 K at shield cooling pipe surface –5 K at shield cooling pipe surface –2 K at GRP and tank surfaces Heat flux (radiation through MLI): –1 W/m 2 at 77 K shield surface –0.05 W/m 2 at 5 K shield surface Heat flow (conduction of RF cables/couplers): –0.1 W at 2 K coupler port on cavity –1.0 W at the thermalization on 5 K shield –8.9 W at the thermalization on 77 K shield

S1_Global: thermal analysis TILC09 13 Data for static loads Data from Tom Petersen (FNAL) 2Knotes RF load=0 (static) SupportsThrough model Input couplerSee table HOM coupler (cables)See table HOM absorber= 0 Beam tube bellows= 0 Current leads= 0 (no quad) HOM to structure= 0 Coax cable= 0 Instrumentation taps= 0 5K / 77K RadiationFrom MLI data SupportsThrough model Input couplerSee table HOM coupler (cables)See table HOM absorber= 0 Current leads= 0 (no quad) Diagnostic cable to be calculated Literature data RadiationW/m 2 heat flux at shield surfaces 2K- 5K K1 Conduction at couplersWheat flow on coupler thermal intercepts 2K0.08Scaled from TTF data presented at Linac04 5K0.8 77K7.6 Conduction of RF cablesWheat flow on coupler thermal intercepts 2K0.005Scaled from Tesla TDR data 5K0.2 77K1.275 Total conduction at couplerWeffective heat flow on the model 2K0.1 5K1.0 77K8.9

S1_Global: thermal analysis TILC09 14 Computed static heat loads At 2 K: 0.14 W At 5 K: 4.0 W (radiation ~0.7 W) At 77 K: 43.3 W (radiation ~ 16 W) static analysis

S1_Global: thermal analysis TILC09 15 Static simulation: results Gradient on 77 K shield Gradient on 5 K shield Conduction path only through welded fingers (worst case of no thermal contact between mating surfaces ands strong choking of thermal flux)

S1_Global: thermal analysis TILC09 16 Results: GRP, shapes, invar

S1_Global: thermal analysis TILC09 17 Results: cavity string Heat flux

S1_Global: thermal analysis TILC09 18 Results: heat flux

S1_Global: thermal analysis TILC09 19 Structural analysis, deformations Fixed post Sliding 3200 mm

S1_Global: thermal analysis TILC09 20 Vertical displacement…

S1_Global: thermal analysis TILC09 21 Longitudinal behavior Fixed invar rod position Position of cavity follows invar rod...

S1_Global: thermal analysis TILC09 22 Evident comparing with GRP Longitudinal cavity position decoupled from GRP, follows invar

S1_Global: thermal analysis TILC09 23 Structural analysis, stresses Finger welds relieve shield structure from stresses (by design) Stress concentration clearly higher where Al sheet is thinner

S1_Global: thermal analysis TILC09 24 Transient loads: T decrease Approximation to convective exchange: boundary condition on piping with linear decrease of T in time

S1_Global: thermal analysis TILC09 25 Scaling of transient loads

S1_Global: thermal analysis TILC09 26 Transient simulation: results

S1_Global: thermal analysis TILC09 27 Transient  T on the 77 K shield Maximum gradient: 52.2 K after ~22 hours of cooldown

S1_Global: thermal analysis TILC09 28 Transient  T on the 5 K shield Maximum gradient: 42 K after ~19 hours of cooldown

S1_Global: thermal analysis TILC09 29 T distribution at max  T 5 K shield 77 K shield to do Stress analysis at max gradient on structures

S1_Global: thermal analysis TILC09 30 Next steps: on model Perform stress analysis with temperature distribution corresponding to the maximum gradient on the inner cold mass components Increasing model complexity –Perform simulations with convective exchange at pipe surfaces (instead of fixed temperatures) Later, possibly coupled to 1-D fluid elements for longitudinal gradients and heat exchange with fluid flowing in cooling channels –More accurate conduction paths (couplers?)

S1_Global: thermal analysis TILC09 31 Next steps: analysis & benchmark Use KEK cooldown procedure as input data for the transient simulation –gather all fluid parameters and evolution with time (mass flow, pressure condition, etc.) Verification of analysis with experimental data collected at KEK by S1_Global collaboration during cryomodule tests –How far can we rely on simulations with increasing complexity for the assessment of different module designs?