Bureau of Land Management. Grew out of FS and Interagency efforts NLCS Division Chief on board as early as 2002 Wilderness Character Monitoring Team formed.

Slides:



Advertisements
Similar presentations
Monitoring Watershed Restoration Effectiveness Nez Perce Tribe DFRM-Watershed Division Rebecca A. Lloyd, Project Leader.
Advertisements

THE LUBRECHT REPORT: A MID-WAY ASSESSMENT OF THE 10 -YEAR WILDERNESS STEWARDSHIP CHALLENGE Developed By: The Wilderness Advisory Group April 2010.
Geospatial 09 Kathie Jewell April 29,2009 National Invasive Species Information Management System NISIMS.
December 8, 2006 Educational Information System Replacement Plan All Administrators and Supervisors December 8, 2006 Fred Sherman Kathy Kyne.
Common Management System – CMS “CMS Status & Future” 1 Financial Officers Association April 2004 “CMS Status & Future” William Griffith Vice President,
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
Surface Management Agency Data set Update FGDC - Cadastral Subcommittee February 11, 2014 Brian Mueller Bureau of Land Management.
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
The National Declassification Center Releasing All We Can, Protecting What We Must Public Interest Declassification Board NDC Project Update April 22,
Wilderness Character Monitoring in the NWRS July 18, 2012.
This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
Elements of Planning and Decision-Making
Lebanon Introduction Based on studies of its past disasters, Lebanon can be considered as a country vulnerable to earthquakes because of some.
Page 1 of # File: bea_pres_fieldcomm_ ppt Author: mrhinehart BLM Enterprise Architecture | Edit Date: 4/21/06 FC&SC: Enterprise Architecture — the.
Massachusetts Municipal Environmental Stewardship & EMS in Public Schools Grant Programs Massachusetts Department of Environmental Protection April 28,
Adrift or Right on Target: Perspectives on Floating Collections Barbara Spruill Branch Services Division Director Gwinnett County Public Library 2010 PLA.
Mission Assurance SI International’s Quality Management System John Wheeler Director, Mission Assurance 16, April 2008.
Why use RequisitePro RequisitePro is a comprehensive tool that supports any of today's requirements management processes. The predominant requirements.
Engineering Management From The Top Power Behind the Storage.
Wyoming Pipeline Authority September Meeting, Jackson Hole Ted Murphy – Acting Field Manager – Rock Springs Field Office.
ACTION PLANNING APAMSA Leadership Development Module.
1 Federal Oil and Gas Planning, NEPA, and Development Scott F. Archer USDI - Bureau of Land Management April 8, 2009.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
ANTIGUA AND BARBUDA Update on Work Plan, Biodiversity in Antigua and Barbuda and Inter-Agency Meetings Antigua and Barbuda and Inter-Agency Meetings for.
Data in Perspective: A view of national, state, and local data collection, compilations and systems Presented by : Beth Hartness Program Specialist, National.
Developing a Monitoring and Pre-Scoring Plan for the Virginia Grade Level Alternative (VGLA) Adapted from the Virginia Department of Education Division.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
1 The New York State Integrated Justice Information Exchange Project BJA Regional Information Sharing Conference: Information Exchange Modeling/Business.
Integrated Monitoring Dashboard SEAP/BTIS/DB&I/Mar Integrated Monitoring Dashboard An Innovative Monitoring Approach Proposal by BTIS/DB&I.
Energy Policy Act - BLM Cadastral Support Strategy 1 CADASTRAL PLANNING CADASTRAL SERVICES Consultation for Effective and Efficient Land Management: National.
Gap Analysis & Action Plan Launch
Business Plan Presentations GEB1011. Your Company Introduce your company: ▫What is your company about? ▫What need does it fill – as in, why did you create.
Federal Wildland Fire Policy Prescribed Natural Fire Yellowstone South Canyon Federal Fire Policy Review PNF Escapes.
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System A Use Case Primer Organizing.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Analyzing the Problem Continued and Product Features and Challenges Steve Chenoweth & Chandan Rupakheti RHIT Pages Requirements Text.
Incident Based Automation Project Update Logistics Meeting March 16, 2005.
Project Management Processes for a Project
Sandrine PECORI Support to Project Managers PMO “Added-value or expensive support?”
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
INTER-AGENCY ACTIVITIES FOR data collection on Environment statistics in SURINAME NAME: Ms. Anjali De Abreu- Kisoensingh Division: Research & Planning.
Establishing Project Scope 1. Factors Affecting Project Scope  The functionality that must be delivered to meet the user’s needs  The resources available.
Business Plan for the National Landscape Conservation System.
NRIS Lichen Submodule Considerations and parameters.
UNCLASSIFIED National PNT Architecture Implementation Plan Way Ahead Mr Hal Hagemeier Deputy Director, National Security Space Office October 2010.
Quality Management Planning Missouri Department of Health and Senior Services Bureau of HIV, STDS and Hepatitis December 2005 Prepared by: Barbara Boshard.
Update for the Citizens Advisory Committee February 22, 2017
CLUB SERVICE PROJECTS By: PP Ronnie Tan RC of Belait PETS – 2009/10.
Suggestion for next steps for PGA for REDD+ in Vietnam
Information Management
National Wilderness Stewardship Alliance March 29, 2016
The Features of a Product or System
Data Collection Learning Objectives
Value Stream Mapping (VSM) Training
By Jeff Burklo, Director
Considerations and parameters
Centennial Care 2.0 MCO Readiness
NIST PAP Assignments to CIM User Group and/or IEC TC57
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Educational Information System Replacement Plan
Accelerator Safety Workshop SLAC
IMPROVING YOUR LEADERSHIP EFFECTIVENESS Dr. Samuel R. Chand
Achieving an Operational Office of Water Enterprise Architecture: FY Roadmap November 23, 2005 Achieving an Operational Office of Water Enterprise.
Developing a Plan for Identifying Local Needs and Resources
Quality Management Planning
Developing a Plan for Identifying Local Needs and Resources
Welcome Work: 1. Take out your Act 2 study guide to turn in.
Presentation transcript:

Bureau of Land Management

Grew out of FS and Interagency efforts NLCS Division Chief on board as early as 2002 Wilderness Character Monitoring Team formed in December 2009  1 WO; 3 SO; 4 FO ; SO ecologist  Implementation Guide  based on 2006 “Reader’s Digest” version of FS Tech Guide  first version April 2010  now version 1.5 (April 2012) Director issued IM in August 2010

Universal measures, techniques, and definitions Process

Schedule assigned for all 221 areas Process

Baseline collected for 53 areas (24%) Implementation Guide refinements have improved data collection Acceptance, if not priority, in the Bureau  faster than anticipated  more necessary than anticipated  involves many specialists in office Incorporated into BLM Manual 6340 Accomplishments

Behind schedule  illness and lapsed positions  other workloads (LWC Inventory; energy development) No central, on-line data repository or analysis capabilities Missing measures – “native biota” Challenges

In your opinion, the BLM’s top wilderness character monitoring priority should be to: 1) Finish baseline data gathering by 2014, even if there are some data gaps that will have to be filled in later and there is no on-line data reporting and storage capability. 2) Develop complete suite of measures for “native biota,” even if this means the baseline completion target of 2014 is missed and there is no on-line data reporting and storage capability. 3) Finish on-line data reporting and storage, even if this means the baseline completion target of 2014 is missed and not all measures are defined.

(406)