IEEE-SASB Audit Committee update for IEEE 802 July 2008 Glenn Parsons Chair.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
Advertisements

1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission.
Doc.: IEEE /0494r0 Agenda May 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc May 2015 Agenda Date: Authors:
Overview of the IEEE-SA Process
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
1 SISO SAC Report to IEEE CS SAB November 3, 2005 Philadelphia, PA Katherine L. Morse, Ph.D., SAIC
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Ec SA IEEE SA Overview Bruce Kraemer IEEE 802 Plenary Waikoloa, HI, 17 July
Doc.: IEEE /0036r0 Submission Sept 2005 Tom Siep, Cambridge Silicon Radio PlcSlide 1 Matthew Sherman’s Comments to P&P Notice: This document.
Doc.: IEEE Submission January 2015 Rick Roberts [Intel]Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
802.16p Closing Report for Session #76 [IEEE Presentation Submission Template (Rev. 9.2)] Document Number: IEEE p-11/0037r1 Date Submitted:
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
Doc.: IEEE /0804r0 Submission May 2007 Al Petrick, WiDeFiSlide 1 TGmb – Closing Report Notice: This document has been prepared to assist IEEE.
1 Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0020 Date Submitted:
Doc.: IEEE /0747r1 Agenda July 2014 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc July 2014 Agenda Date: Authors:
SAB Secretary Report Debbie Brown February 3, 2016 Standards Activities Board.
P SystemC Analog/Mixed-Signal (AMS) extensions Working Group July 6, 2015 | Martin Barnasconi | P Chair.
Doc.: IEEE /0223r0 Submission March 2016 D. Stanley HPE 2 nd Vice Chair Report January 2016 Date: Authors: Slide 1.
802.16m Closing Report July 16, 2009 San Francisco, CA Session # IEEE m-09/0035r1.
TGn Chair’s Status Update
IEEE TGa Project Timeline
IEEE TGw March Agenda Date: Authors: May 2008
SAB Secretary Report Standards Activities Board Debbie Brown
IEEE aj Task Group May 2017 Agenda
IEEE WG Closing Report – July 2006
July 2014 doc.: IEEE November 2017
Proposal for P&P Change - #2009-1
Wireless Coexistence TAG Overview
P b Status Sponsor balloting completed:
IEEE P Motions at the July Plenary EC Meeting
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE Working Group on Mobile Broadband Wireless Access
IEEE WG Closing Report – July 2006
IEC Maintenance Committee Report
API SC 10, Work Group 3 Update:
Wireless Coexistence TAG Overview
<month year> doc.: IEEE < e> <July 2018>
TGac Status and Timeline
<month year> doc.: IEEE < e> <September 2018>
1St Vice Chair Update Date: Authors: July 2009 July 2009
TGn Chair’s Status Update
<month year> doc.: IEEE < e> <November 2018>
IEEE aj Task Group September 2017 Agenda
EC Update on LMSC Policy and Procedures
Submission Title: [REVCOM Submission Information]
IEEE TGaf DRAFT Meeting Plan and Agenda
LMSC Policy and Procedures Update
Overview of WG Letter Ballot Process
IEEE SGa Project Timeline
IEEE P Wireless RANs Date:
Matthew Sherman’s Comments to P&P
IEEE Revision Timeline
Policies and Procedures Status and Plans
EC LMSC Policy and Procedures Update
IEEE TGmc Sept 2012 Agenda Date: Authors:
TGmb – Closing Report Date: Authors: May 2007 May 2007
IEEE MEDIA INDEPENDENT SERVICES DCN:
July 2014 doc.: IEEE /29/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
P802.11aq Waiver Request Introduction
<month year> doc.: IEEE < e> <November 2018>
IEEE Task Group G Report to the IEEE WG
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE aj Task Group May 2017 Agenda
TGbd Closing Report – Vietnam
Presentation transcript:

IEEE-SASB Audit Committee update for IEEE 802 July 2008 Glenn Parsons Chair

AudCom mandate l Review of Sponsor Policies and Procedures l Comparison with baseline/model procedures l Official P&P website l 91 sponsors l 81 accepted P&P l 10 without P&P

Baseline P&P for Working Groups l Sponsor P&P reviewed by AudCom often include WG P&P l Recommendation is always to separate them out l AudCom does not review these or provide a baseline l Arguably the WG P&P are the most important since this is where all the technical work is done l SASB asked AudCom to make a proposal l AudCom adhoc created and reviewed a baseline WG P&P document. l Initial draft proposal produced and circulated to sponsors l AudCom adhoc studying the required SASB Bylaws/OpsMan changes. l Initial proposal is that sponsors will be asked to audit their own WGs. AudCom will perform random audits.

Proposed Baseline WG P&P sections Shall not be modified l Preface l Amendments l Hierarchy l Fundamental Principles of Operation l Legal Accountability l Working Group Roster l Voting l Appeals May be modified l Working Group Responsibilities l Working Group Officers l Working Group l Meetings l Communications

WG P&P baseline timeline l Baseline document l AudCom development – Jan-Jun l Sponsor comment period – July l AudCom revision – Aug/Sept l SASB comment period – Oct l AudCom revision – Nov/Dec l Final – Dec 2008 l Policies l Proposal – Jun l AudCom/Procom refinement – Sept l Final – Dec 2008

Comments? l Please direct all comments on the proposed baseline WG P&P before July 30 th to: l Rona Gertz, AudCom Secretary l Any other questions or comments: l Glenn Parsons, AudCom Chair

AudCom Baseline P&P revision l Individual model P&P l Revised Dec 2007 l SCC Type 2 model P&P l Revision under SASB ballot l SCC Type 1 model P&P l Original from ~2001 l The goal is to develop a single common sponsor and SCC P&P document. l A proposed merge will be reviewed at the next meeting if the SCC type 2 baseline is approved l CAG will prepare a set of deltas for entity sponsors to include in the single baseline P&P