Director’s Review Dec 1999 DO Timeline Old Version 2000 2001 J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.

Slides:



Advertisements
Similar presentations
Arnaud Lucotte ISN-Grenoble J/ e + e - selection at D RunII Arnaud Lucotte (ISN Grenoble) Introduction A. J/ production at the TeVatron 1. Prompt production:
Advertisements

How to trigger to test MDT with cosmic rays? authors.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Beam Position Monitors MICE CM Harbin January, 2009.
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Collaboration Mtg Cotober 11, 2000 Installation Status Opening Remarks Overview, logistics Recent events, status Outlook, concerns Conclusions Jon Kotcher.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
DAQ Software Gordon Watts UW, Seattle December 8, 1999 Director’s Review Introduction to the System Goals for Installation & Commissioning Software Tasks.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
D0 Collab Mtg Feb 7, 2001 D0 Detector: Status for Run 2 Wistful reminiscences Near term: Roll in, detector status, next few weeks Latest from Beams Division.
December DZERO Operations Jerry Blazey Northern Illinois University.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
DØ Central Tracker Replaced with New Scintillating Fiber Tracker and Silicon Vertex Detector The DØ Central Detector Upgrade The DØ Detector is a 5000.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Kurt Krempetz (Director's Review - Dec. 7, 99) 1 Mechanical Infrastructure Kurt Krempetz Introduction Existing Systems New Systems Schedule Manpower Conclusions.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
Levan BabukhadiaICHEP02 – 31 st International Conference on High Energy Physics, Amsterdam, 24 – 31 July, 2002 CHEP02 – 31 st International Conference.
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
08-Sep-00PHENIX Upgrades PHENIX has a phased strategy to q Complete the current detector q Enhance its capabilities q Extend its physics reach.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
CMS ROC Report Patricia McBride May 26, 2005.
Kevin Burkett Harvard University June 12, 2001
CLAS12 First Experiment Workshop Report
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Calorimeter Upgrade The Tevatron and Dzero Upgrades
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2 VLPCs installed 1st CFT crate operational Waveguide production All VLPCs installed SMT install/ hookup Forward  MDT & pixel planes install/survey (A&B) Forward  MDT & pixel planes install/survey (C) CC cosmics ECN cosmics Assemble/install/ align EMC End toroids installed Hookup ECS Cosmic Ray Commissioning Phase I: Central muon, DAQ, RECO, trigger, silicon front-end Phase II: Fiber tracker, trigger, preshowers, VLPCs, CTT, forward muon Phase III: Full Cosmic Ray Run (add TRIG, SMT, CAL) Install/checkout CAL BLS Run II begins: Mar 1, 2001 Roll in Remove shield wall No LHe No Services Beam- ready Platform moves Install final CFT electronics No Services

Director’s Review Dec 1999 DO Timeline Scheme I J F M A M J J A S O N D J F M D Install silicon front-end CFT install/hookup 1/2 VLPCs installed 1st CFT crate operational Waveguide production All VLPCs installed SMT install/ hookup Assemble/install/align south EMC CC cosmics ECN cosmics Install/align/survey north EMC Hookup ECS Cosmic Ray Commissioning Phase I: Central muon, DAQ, RECO, trigger, silicon front-end Phase II: Fiber tracker, trigger, preshowers, VLPCs, CTT, forward muon Phase III: Full Cosmic Ray Run (add TRIG, SMT, CAL) Install/checkout CAL BLS Run II begins: Mar 1, 2001 Roll in detector Remove shield wall No LHe? Beam- ready Install final CFT electronics Platform moves Install north truss on sidewalk Install south C-layer in Hi Bay ICD FPS Lum (L0) No Services

Director’s Review Dec 1999 DO Timeline Scheme II J F M A M J J A S O N D J F M D Install silicon front-end CFT install/hookup 1/2 VLPCs installed 1st CFT crate operational Waveguide production All VLPCs installed SMT install/ hookup Install/align/survey south EMC CC cosmics ECN cosmics Install/align/survey north EMC Hookup ECS Cosmic Ray Commissioning Phase I: Central muon, DAQ, RECO, trigger, silicon front-end Phase II: Fiber tracker, trigger, preshowers, VLPCs, CTT, forward muon Phase III: Full Cosmic Ray Run (add TRIG, SMT, CAL) Install/checkout CAL BLS Run II begins: Mar 1, 2001 Roll in detector Remove shield wall Beam- ready Install final CFT electronics Platform moves Install north truss on sidewalk Install south C-layer in Hi Bay No LHe? ICD FPS Lum (L0) No Services

Director’s Review Dec 1999 DO Timeline Scheme III (Working Version) J F M A M J J A S O N D J F M D Install silicon front-end CFT install/hookup 1/2 VLPCs installed 1st CFT crate operational Waveguide production All VLPCs installed Assemble/install/align south EMC CC cosmics ECN cosmics Install/align/survey north EMC Hookup ECS Cosmic Ray Commissioning Phase I: Central muon, DAQ, RECO, trigger, silicon front-end Phase II: Fiber tracker, trigger, preshowers, VLPCs, CTT, forward muon Phase III: Full Cosmic Ray Run (add TRIG, SMT, CAL) Run II begins: Mar 1, 2001 Roll in detector Remove shield wall No LHe? Beam- ready Install final CFT electronics Platform moves Install north truss on sidewalk Install south C-layer in Hi Bay ICD FPS Lum (L0) No Services Window for SMT installation Half-cylinders 1 & 2 Single-cylinder window (Scheme I)