ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.

Slides:



Advertisements
Similar presentations
The Control System for the ATLAS Pixel Detector
Advertisements

TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Uli Schäfer DCS meeting Feb. 20th, 2001 Subdetector Reports : 1TGCS. Tarem, N.Lupu 2RPCStefano Veneziano 3 MDTHenk Boterenbrood 4 TRTZbyszek Hajduk 5 PixelGreg.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Ivan Pogrebnyak Supervisors: Paramonov, Drake, Proudfoot ATLAS, MSU, Argonne Tile week upgrade session June 10, 2015 TileCal requirements for ELMB upgrade.
Distributed Control System Group D Louay Sirwi Abdallah Jafar Dr. H. Shabaik SE – 401.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
CaRIBOu Hardware Design and Status
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
ATLAS DCS ATLAS DCS ELMB PRR, 4 Mar 2002, H.Boterenbrood 1 Software for the ELMB Henk Boterenbrood ATLAS DCS.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
60kW Thermosiphon control system
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
Standard electronics for CLIC module. Sébastien Vilalte CTC
1 Radiation worries in the cavern L.Jirdén
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
The Slow Control System of the HADES RPC Wall Alejandro Gil on behalf of the HADES RPC group IFIC (Centro Mixto UV-CSIC) Valencia, 46071, Spain IEEE-RT2009.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
SCADA for Remote Industrial Plant
Cypress PSoC 3 vs. TI UCD90160 Power Supervision Applications
Radiation- and Magnet field- Tolerant Power Supply System
Experiment Control System
Presentation transcript:

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart2 DCS Architecture SCX1 USA15 Front-End System Back-End System Local Area Network Partition 3 Supervisory only Partition m UX15 Partition 2 Common Infrastructure Local Control Stations (LCS) Partition 1 Expert Workstations ServerOperation Subdetector 1Subdetector 2a Subdetector n Detector Sub-system Sensors Actuators Fieldbus 200m  ELMB Electronic Rack ELMB Rack PC Power Supply Cooling Interlock Box Test Rack PC ELMB Alarms CFS HV Barrel

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart3 Components of DCS  SCADA Commercial system PVSS from company ETM  Front-End I/O Complex, computer-based Front-End systems (e.g. High/Low Voltage systems, crates) (Soft-) PLCs (e.g. gas mixing) Fieldbus nodes built into commercial devices (e.g. crates, power supplies) Commercial Fieldbus nodes (e.g. “Wago”) Purpose-built Fieldbus nodes (e.g. TileCal HT) General-purpose I/O Fieldbus node ELMB

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart4 General Purpose Front- end I/O System

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart5 Reasons for general purpose I/O  Homogenous solution for all subdetectors Save design effort (HW and SW) Common radiation qualification Savings in production costs Ease integration into SCADA Ease Maintenance Common spares  Special technical requirements

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart6 Environment of ELMB  Radiation neutrons/cm 2 and 1Gy per year outside of the calorimeters:  Radiation neutrons/cm 2 and 1Gy per year outside of the calorimeters: components, SEE  Magnetic field up to 1.5 T:  Magnetic field up to 1.5 T: no coils, DC-DC  High number channels: low  High number channels: low cost  Limited space available:  Limited space available: high density  Access restriction:  Access restriction: high reliability, rem. diagnostics  I/O points distributed over the whole volume of the detector:  I/O points distributed over the whole volume of the detector: distances > 100m  Remote powering:  Remote powering: low power consumption ==> no industrial solution exists no industrial solution exists <==

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart7 Requirements of ELMB  Radiation tolerance  Operability in magnetic field  High density  Low power consumption  Low cost  High reliability  Remote diagnostics  Distributed  In-system-programmability  In-system-programmability (firmware upgrade)  Interface industry standard: CAN chosen  Modular: standard specialized usage

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart8 Choice of CAN  CANbus HW good support of chips from industry electrical robustness commercial diagnostic tools error detection and recovery  CANopen SW standardized connection to SCADA NMT and error handling

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart9 Modularity of ELMB (1)  Standard usage HW features on-board: 64 channel ADC 16 bit digital input and output ports HW features off-board: general purpose motherboard (connect sensors and CANbus) with signal adapters DAC 16 channel 12 bit (max. 4 per ELMB) (NIKHEF) Interlock box 16 channels, thresholds set by resistor network (Wuppertal) SW features Support of standard HW devices Error detection and correction CANopen protocol handling

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart10 Modularity of ELMB (2)  Specialized usage HW features on-board: SPI bus interrupts low-grade ADC Specialized motherboard: subdetector F-E electronics Common SW CANopen master-slave interaction user provided SW: libraries for special usage of output ports (JTAG, I2C) applications for special HW devices (e.g. HV units) control and feedback loops (e.g. PID) dedicated analysis (e.g. gas flow)

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart11 Spectrum of usage  Type “Black Box” Configure HW of ELMB Configure SW of ELMB with SCADA Use data in SCADA (data points)  Type “Advanced usage” Design special HW signal adapters Add chips on SPI bus (e.g. SRAM, F-E chips) Write dedicated SW (e.g. initialise DAQ Front-End electronics, supervise HV unit)

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart12 General purpose motherboard (front side)

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart13 General purpose motherboard (back side)

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart14 Features DAC  16 channels 12 bit (max. 4 modules per ELMB)  controlled via SPI  opto-isolated output mA, max 2.5V, (powered from ELMB) mA, (external power supply)  performance ‘Integral non-linearity’: 0.5 or 1 LSB accuracy: 0.1% or 1%  speed: maximum 100 channel-updates/sec  output set by SDO or PDO  output values buffered on ELMB  estimated cost: 20 CHF per channel

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart15 Block Diagram DAC

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart16 Features Interlock Box  16 channels  thresholds set by resistors  independent from ELMB, connected in parallel  remote diagnostics  TTL output: too high, too low, error  same environment as ELMB radiation magnetic field  accuracy: 1 K for NTC 10k

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart17 Schematics Interlock Box

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart18 Picture Interlock Box

ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart19 DCS’ aim of this PRR  Confirmation, that ELMB is what ATLAS needs  (constructive) criticism  commitments from subdetector features ok quantity required time scale of need Pledges from users needed before Tender!