ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.

Slides:



Advertisements
Similar presentations
RF Development for ESS at Uppsala University
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
ESS – SPL Collaboration Meeting Infrastructure at ESS Report on WP3 J. Eguia, Fundación TEKNIKER ESS – SPL, Lund, 1st of July 2010.
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division , SLHIPP-1
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Page The High power proton accelerator for the European Spallation Source (ESS) S. Gammino Milano, 9 Marzo
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
The ESS ADU project Mats Lindroos Head of the ESS Accelerator Division Lund,
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Dave McGinnis Chief Engineer – Accelerator Division
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
AD retreat Accelerator 2012 December Mats Lindroos, David McGinnis, Suzanne Gysin, Jörgen Andersson and Steve Peggs.
ESS LLRF and Beam Interaction
RF cell Anders Sunesson RF group leader
WP5 Elliptical cavities
Thales Klystrons for Linacs
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
LLRF for ESS: Requirements and System design
WG-1 Session Cavity Performance Cryomodule Performance
Plans for a Superconducting Proton Linac at CERN
Second SPL Collaboration Meeting, Vancouver May 2009
Accelerator Research and Innovation for European Science and Society
Access to radiofrequency testing facilities
Hosting Orsay Walid KAABI
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
CEPC RF Power Sources System
Implications of HOMs on Beam Dynamics at ESS
Olivier Napoly, coordinator CEA/Irfu
Managing Parameters Karin Rathsman
RF systems introduction
Introduction CDR Normal Conducting Linac LLRF
European Spallation Source ERIC
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
SNS-PPU upgrades the existing accelerator structure
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team

ESS Linac WP8: RF Systems Outline Work package description – objectives – organization – work breakdown structure Development challenges – design baseline – critical design requirements – development steps Strategy for test facilities Scientific collaboration 30-Jun-2010 ESS/SPL Collaboration Meeting 2 Roger Ruber: ESS RF Systems

WP8: Work Package Description Work Package Objectives Baseline – design all MHz RF systems – one power source per cavity Issues to be addressed – RF system is a major part of the budget → must be cost effective – 200 cavities/distribution points → minor fault might create a major risk R&D focus – Overall energy & resource efficiency → R&D power generation efficiency, life-time, reliability – RF power for 704 MHz SC elliptical cavities → investigate two-cavities-per-klystron concept 30-Jun-2010 ESS/SPL Collaboration Meeting 3 Roger Ruber: ESS RF Systems

WP8: Work Package Description Work Package Organization WP Project Spec and Detailed Schedule Accelerator PM Mats Accelerator PM Mats WP1 Mngmt Coord Mats WP1 Mngmt Coord Mats WP2 Acc. Sci Steve WP2 Acc. Sci Steve WP3 Infra Serv Josu WP3 Infra Serv Josu WP4 Spoke Cav Sebastien WP4 Spoke Cav Sebastien WP5 Elliptic Cav Guillaume WP5 Elliptic Cav Guillaume WP7 HEBT Søren WP7 HEBT Søren WP8 RF syst Roger WP8 RF syst Roger WP6 NC Linac Santo WP6 NC Linac Santo Technical Board WU8.1 Management & Coordination WU8.1 Management & Coordination WU8.2 RF Modelling WU8.2 RF Modelling WU8.3 LLRF WU8.3 LLRF WU8.4 RF Power Generation WU8.4 RF Power Generation WU8.6 RF Test Facilities WU8.6 RF Test Facilities WU8.5 RF Power Distribution WU8.5 RF Power Distribution Work Units: Development, Prototyping and Technical Design Report 30-Jun-2010 ESS/SPL Collaboration Meeting 4 Roger Ruber: ESS RF Systems

WP8: Work Package Description Work Breakdown Structure Preparing detailed WBS/PBS 30-Jun-2010 ESS/SPL Collaboration Meeting 5 Roger Ruber: ESS RF Systems

WP8: Development Challenges Design Baseline ESS proton linac: high reliability above 95% – 2.5 GeV, 2.3 ms pulses at 20 Hz – 50 mA, average 5.0 MW (beam loss <1 W/m) – Future upgrade to 75 mA, 7.5 MW Power provided by RF system – 352 MHz: 1 RFQ, 3 DTL, 56 SC spoke cavities; buncher cavities – 704 MHz: 136 SC elliptical cavities – one power source per cavity; peak power up to 1.2 MW 30-Jun-2010 ESS/SPL Collaboration Meeting 6 Roger Ruber: ESS RF Systems

WP8: Development Challenges Design Baseline 704 MHz High Power RF: – klystron amplifier – power distribution (A,Φ) – power coupler, HOM coupler Low Level RF: – RF source, regulate (A,Φ) – monitor cavity RF (A,Φ) – cavity tuning 30-Jun-2010 ESS/SPL Collaboration Meeting 7 Roger Ruber: ESS RF Systems

WP8: Development Challenges Critical Design Requirements Baseline with conservative off-the-shelf technology RF system is a major part of the budget – construction, operation & maintenance must be cost & resource effective design shall assure efficient heat recovery – 200 cavities/distribution points minor fault might create a major risk use reliable technology try to be efficient with spare parts 30-Jun-2010 ESS/SPL Collaboration Meeting 8 Roger Ruber: ESS RF Systems

WP8: Development Challenges Development Steps Investigate LLRF controls – piggy back on existing systems & developments – enhancements to decrease power usage? (ideas K. Rathsman) Investigate alternative power sources – solid state technology? – phase locking magnetrons? (ideas A. Dexter/Lancaster) – improve klystron efficiency? (ideas E. Jensen/CERN) Investigate alternative power distribution schemes – two-cavities-per-klystron concept 30-Jun-2010 ESS/SPL Collaboration Meeting 9 Roger Ruber: ESS RF Systems

WP8: Strategy for Test Facilities Overview Needed for development and construction Both 352/704 MHz, if possible back-up facility – 352 MHz normal conducting piggy back on existing facilities for NC linac development – 352 MHz spoke cavities CEA Saclay: existing IPN Orsay: planned, to be completed by 2012 – 704 MHz elliptical cavities CEA Saclay: existing, upgrade required for cryomodule CERN: upgrade required, to be completed by 2012 (ESS modulator) DESY: upgrade required, only after completion XFEL (2015) Uppsala: proposed, to be completed by 2012 (focus on RF generation/distribution) 30-Jun-2010 ESS/SPL Collaboration Meeting 10 Roger Ruber: ESS RF Systems

WP8: Strategy for Test Facilities Uppsala Test Facility (FREIA) Modulator, 704 MHz klystron (4 MW)Modulator, 704 MHz klystron (4 MW) Refrigerator (140 l/h, 400W with LN 2 precooling)Refrigerator (140 l/h, 400W with LN 2 precooling) 2 Elliptical cavities in horizontal cryostat (HoBiCat)2 Elliptical cavities in horizontal cryostat (HoBiCat) 30-Jun-2010 ESS/SPL Collaboration Meeting 11 Roger Ruber: ESS RF Systems

WP8: Scientific Collaboration Timeframe and Planning 30-Jun-2010 ESS/SPL Collaboration Meeting 12 Roger Ruber: ESS RF Systems

WP8: Scientific Collaboration Partners Collaboration tasks based on WBS/PBS Discussions starting, anybody interested please contact us! 30-Jun-2010 ESS/SPL Collaboration Meeting 13 Roger Ruber: ESS RF Systems