Mod 0428 Charge Impact October 2012. 2 Affected Supply Point Population.

Slides:



Advertisements
Similar presentations
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Mod 186 January Assumptions No provision for TMA, Tax or Exit re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Network Customer Meeting Access Metric Update November 16, 2006.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
LDZ System Charges – Structure Methodology 26 April 2010.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Single Meter Supply Points Discussion Points for Workstream September 2012.
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
New Large Single Loads and Economic Development Considerations Draft Assessment.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Cash Flow Estimation and Risk Analysis Chapter 12  Relevant Cash Flows  Incorporating Inflation  Types of Risk  Risk Analysis 12-1.
Presented By Public Resources Management Group, Inc. RECREATION IMPACT FEE STUDY Prepared: December 9 th, 2013.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Customer Charge On behalf of all DNs 19 November 2010.
Smart Grid Tariff Changes
Portugal Cove - St. Philip’s
Background Current balance of LDZ System and Customer charges
Water & Sewer Rates Workshop
UNC Modification Proposal 0202 National Grid Distribution
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Modification 0282 Action 002 Update
Transmission Workgroup 7th July 2011
Mod 0621 Amendments to Gas Transmission Charging Regime
Joshua Basin Water District Revised Rate Recommendations
Hypothesis Tests for Two Population Proportions
Rebecca Knight Mod 644 UIG Analysis.
LDZ System Charges – Structure Methodology 26 July 2010
CHAPTER 12 Cash Flow Estimation and Risk Analysis
Orifice plate meter error resolution – cash flows
Danishtah Parker 0621 Workgroup 26 April 2018
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Mod 621A Supporting analysis
Questions for Consultation
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
DN Interruption & Charging
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Denis Aitchison/Rob Hetherington
Impact of SOQ Reduction
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Pricing and Margins Manager National Grid Distribution
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Mod 0428 Charge Impact October 2012

2 Affected Supply Point Population

3 Impact on Supply Point Population

4 Impact on Collectable Revenue

5 Potential Interaction with LDZ System Methodology  With implementation of Mod 0428 we would expect to review derivation of current LDZ System charging functions  Apply existing methodology but with new Supply Point basis  As shown, multi-meter Supply Points are significant proportion of load bands over 732 MWh/annum  Implementation of Mod 0428 could:  Reduce LDZ System charge function levels for Supply Points over 732MWh/annum (since some loads from top bands would move to lower bands)  Have little or no impact on LDZ System two fixed charge levels below 732 MWh/annum since new Supply Points from current multi-meter SPs would be small minority of loads  This re-evaluation of LDZ System functions could reduce LDZ System charges for >732 MWh/a loads so avoiding overall charge level impact  Instead could have re-distribution of LDZ System charges within >732 MWh/a load bands, with possible 2% LDZ System charge decrease in general for these loads:  Increase for current multi-meter SPs (possibly 8% [+9.7%-2%] average increase)  Decrease for current single meter SPs (possibly ~ 2% average decrease)

6 Potential Interaction with Mod 0418 – Review of LDZ Customer Charges  Mod 0418 proposes that the current customer charge structure is replaced by one with 3 flat rates  Implementation of this change would significantly reduce the level of the customer charges for I&C loads  For the loads within National Grid networks it is estimated that on the new single Meter Point per Supply Point basis and with revised customer charge structure, customer charges for current multi- meter Supply Points would be about 54% lower than at present (recovering £2.2m compared to £4.7m annually in aggregate)  The combined impact of Mod 0428 with Mod 0418 and the re-evaluation of the LDZ System charge functions for current I&C multi-metered sites is estimated to be only around +3% charge increase on average (with decreases for current single meter point I&C loads)