Presentation is loading. Please wait.

Presentation is loading. Please wait.

39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon.

Similar presentations


Presentation on theme: "39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon."— Presentation transcript:

1 39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon

2 What is a Neighborhood Greenway?

3 Think back to your childhood...

4 Neighborhood Greenway

5 All Ages & Abilities (AAA)

6 1. Providing safe arterial crossings 2. Providing safe streets for children 3. Calming traffic along the route 4. Improving sidewalks along the route 5. Adding curb ramps 6. Planting trees Greenways make walking in Seattle a safe and healthy choice by:

7 Why curb ramps?

8 The obvious users

9 The less obvious (remember, AAA)

10

11 Trying to get baby to sleep? Fail.

12 Non-pedal powered

13 The (currently unfinished) 39 th Ave NE Neighborhood Greenway

14 39 th Ave NE Greenway (north)

15 39 th Ave NE Greenway (south)

16 Proposed curb ramps (south)

17 Andres Salomon http://seattlegreenways.org/neighborhoods/ne- seattle/ Q&A?


Download ppt "39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon."

Similar presentations


Ads by Google